House Remodel Status September 2, 2016 – 7.5 months in

Here is the house/garage re-build/build status for the 1st part of September.

  1. The F-Bomb Garage has been painted – at least the outside walls.  I need to paint the trim and doors next.
  2. Repaired some major issues with the trim and siding on garage – real unhappy with my garage builder!
  3. Front yard is still green, but need to clean and re-seed the back yard.
  4. There oar only 2 rooms in the house that are complete and need no work at this point.  Stamps-With-Foot could be happier with me right now…
  5. The mounting brackets for the granite in the basement are done and I will install them this weekend.
  6. Our washing machine went out…  fuck.  The bearings finally gave up the ghost.  need to haul it out and put another in.
  7. No garage power yet.  Huge load of confusion between the City of Seattle and my electrician.  Maybe worked out now, but we will see.
  8. The yard is completely fenced in and the rear gate is installed.  just a couple of tweaks and then power wash and polyurethane coat.
  9. The living room corner cabinets are in place, but not painted or installed.
  10. We have a small roof leak – motherfvcker!!!  it is around the kitchen vent and from where the moss removal team got too eager with the power washer.  I will go up there this weekend and seal it.
  11. Got a huge bill from our plumber for work that they didn’t do before abandoning the job.  wanted to scan my ass into the 3D printer and send them a copy.  Called a lawyer instead.  we have a plan forward.

Leave a Reply

Your email address will not be published. Required fields are marked *