Worked in the basement a bit to make Stamps-With-Foot’s sewing room/project space usable.
Made two trips to the dump.
Built screw clamp holder.
Did a little Amazon shopping for a gift and a part that I needed.
Went shooting at the range – shot like a blind squirrel.
Cleaned pistol, muttering disappointment in self whole time.
Hip super-hurt all weekend.
Went to see Atomic Blond for date night. Great movie.
Bought two bookshelf cabinets for garage at Second Use – got a super good deal (hard to do these days at Second Use)
Picked up 2 cases of oil at discount from NAPA
Put down a little 1/4 round trim in dining room.
Washed Stamps-With-Foot’s car.
Filled the washer fluid.
Worked on a couple of films.
Cleaned lighting contacts on the trailer light harness.
Took a load of recycling to the dump.
Organized shop a little and hung the two cabinets.
My shop now has all the storage I will ever need – until I fill it all up 🙂
Consumed some rosé while sitting in sunshine in back yard.
Snuggled wife and puppies.
Installed my welding cabinet and filled it with helms, jacket, gloves, sticks, and welding tools.
Made a happy face.
Did not mow lawn…
Ran two lighting circuits and one 220VAC circuit in garage.
Need to install the 4 florescent lights.
One 220VAC circuit to run and all shop wiring will be complete!
Flew drone a bit to work out new firmware update.
Took a few macro photos with camera
Spent too long on Instagram and Twitter.
Ignored the grass some more.
Changed oil in my father-in-law’s truck.
Picked-up/was given wrong oil filter!
Said dirty words…
Made it to parts store 3 minutes before they closed for new filter.
41 more oil changes and the lift pays for itself!
Tag: Basement
House Remodel Status September 2, 2016 – 7.5 months in
Here is the house/garage re-build/build status for the 1st part of September.
- The F-Bomb Garage has been painted – at least the outside walls. I need to paint the trim and doors next.
- Repaired some major issues with the trim and siding on garage – real unhappy with my garage builder!
- Front yard is still green, but need to clean and re-seed the back yard.
- There oar only 2 rooms in the house that are complete and need no work at this point. Stamps-With-Foot could be happier with me right now…
- The mounting brackets for the granite in the basement are done and I will install them this weekend.
- Our washing machine went out… fuck. The bearings finally gave up the ghost. need to haul it out and put another in.
- No garage power yet. Huge load of confusion between the City of Seattle and my electrician. Maybe worked out now, but we will see.
- The yard is completely fenced in and the rear gate is installed. just a couple of tweaks and then power wash and polyurethane coat.
- The living room corner cabinets are in place, but not painted or installed.
- We have a small roof leak – motherfvcker!!! it is around the kitchen vent and from where the moss removal team got too eager with the power washer. I will go up there this weekend and seal it.
- Got a huge bill from our plumber for work that they didn’t do before abandoning the job. wanted to scan my ass into the 3D printer and send them a copy. Called a lawyer instead. we have a plan forward.
Continued Plumbing Woes…
As mentioned previously, no plumbing permit was pulled for the work in our house and we had to have the BRAND NEW concrete in the basement torn back so that the county inspector can view the pipes and witness a pressure test. When the inspector arrived for the first try, he found 3 additional issues that the plumbing company (big company, one of the oldest in Seattle) had to address. They ended up tearing up more concrete, part of our foundation wall and a 2′ section of my BRAND NEW AND FRESHLY PAINTED drywall!! To add a little insult – I found an empty bottle of wine from a case we imported from France under the trash pile that the first and second crew used in our back yard. Seriously, why would they leave the bottle?! As a ‘Fuck You’..?!
I am unhappy and Stamps-With-Foot is livid. The plumbing company GM came by and was really apologetic and assured us that we would get an update, directly from him, every day. That hasn’t happened and we had no clue that the concrete was being re-poured until my floor re-finisher called and asked if it was OK that he let the concrete guys in.
The new concrete is super wonky and out of level – 1/2″ below the toilet flange and my tile guy wants $800 in addition to his original quote to lay extra floor leveler. To rub salt in the wound, the plumbers sent us a bill for $36,000 dollars. That is not a typo: $36K. The original agreement was for $9200.00 BEFORE they screwed up. I called the GM, sent him all the emails that had gone back and forth and he promised that he would get right back to me. That was a week ago…
Super frustrating. Out of the 7 contractors that have worked on our house remodel and garage build, the plumbing company is the ONLY one that we have had any issue with. Everyone else to this point has been super easy to deal with, lived up to their contract, filed for and received permits, and were clear and concise when small issues came up.
I am not naming names – yet. I am going to see what their next step is. If they try to bill me for another dime, I won’t hesitate in publishing all the details, pictures, e-mails and text messages here on the interwebs – I get 34K hits to my site a week, so… I will be having a long talk with the county concerning a fine request, use Angie’s List remediation, file a BBB complaint, file a WA State L&I claim, and then there is the Consumer Protection Division of the WA Attorney Generals office. That should get things started at least.
House Status and Plumbing Woes
We are making progress, abet slowly:
- My father-in-law came in this weekend and painted our bathroom and the trim.
- I have a new granite vanity top installed – one with the facets centered on the sink.
- New reproduction 1920’s glass handles are installed in the vanity. I is not gud counter. I bad at numbers. Didn’t have enough – one short. Store now sold out. Amazon to the rescue.
- The drywall should completely done and sanded as of today. The new arches are super sexy!
- I modified the kitchen knife rack to fit the new ceramic sharpener. The original was broken by the asshat moving company and Kyocera doesn’t make that size anymore, so I had to drill out its assigned slot. The replacement knives (also the movers…) are now in as well.
- Primer will go on the fresh walls tonight and tomorrow night.
- I have patched the hole in the tub surround and am waiting for the thin-set mortar to dry so that I can lay the tile.
- The new fireplace insert is in and fantastic. I will do the new surround and mantel after the floors are refinished and as I am trimming out the Dining room Ceiling
- I met with the garage foundation crew on Monday to go over all the details and they start the ground work today. I am almost giddy with excitement.
- My new dutch doors are ready and I will pick them up Friday
- The finish carpentry trim-out starts next Monday.
- I learned yesterday afternoon that no plumbing permit was pulled and that we might have to demo the concrete in the basement – the new concrete – and the newly laid supply line so that the county inspector can view the pipes. I am super unhappy and will update as I know more.
- We are now 4 weeks without a shower or bathroom sinks at the house. I have been a decent human being and fairly understanding up to this point with our plumbing company (big company, one of the oldest in Seattle). I am afraid that they have mistaken nice for weak and unwilling to have a confrontation. That was a miscalculation. Please refer to the Capone quote concerning kindness…
- My wife is still medium chipper and hasn’t threatened to leave me yet over the lack of a shower or all the dust, so that is something.
- The lavender out front is in bloom and the bees are back, so not all is lost.
House Remodel Update – Mid-March 2016
All of the demolition work is now done and the rebuild has started. Electrical is moving along, the City inspector signed off on the new HVAC (there is a permit inspection for the basement still to come), and all of the rough work on the main floor is complete. The once scary attic is now clean and waiting for a reinforced floor and new spray foam insulation. Some of the trim in the dining room and kitchen is done, specifically the cove/crown on the cabinets. All the doors are now hung, and the Wainscoting in the new dining room is 90% up. I need to finish up around the double door and fill and prime/paint.
Next steps:
Plumbing
Basement bathroom
Finish electrical
Camera system
New window install
Coffered Ceiling in Dining Room
Hutch built in the dining room vestibule
New security system (Hate ADT)
New drywall main floor
New main bathroom vanity
New Kitchen floor (both decision and install)
Finish trim out
balcony install
Attic floor install – pending engineering review
Attic and wine cave insulation – yes, we are that bourgeoisie
New basement door and back door – both will be dutch doors
Main floor hardwood floor refinish
Basement drywall finish and paint – pending city inspection
New carpet in Basement
Garage build
A sort of Vacation to Seattle
As part of my work contract with my J-O-B, we are flown back to the States twice a year. One of those trips has to be coupled with work travel, but overall not a bad deal. Stamps-With-Foot and I flew in to Seattle last week and stayed with my mom at our/her place. This was our first time back “home” since our move and my mom has transformed our eclectically decorated (books everywhere, Moroccan bits, craftsman furniture, mid-century couches…) home and turned it into your grandmother’s place: ceramic chickens, recliners for TV watching, lace doilies, a tin of cookies ripe for raiding, special soap in the bathroom that is meant just for looks…
We stayed in the basement and by our second day we had trashed it with clothes and books and other stuff to the point that it looked like a staged teenager’s room in a TV sitcom. I felt like I was in high school: mom cooked, did my laundry, made sure I got up on time every morning, offered to pack me a lunch, I played a little music, watched a few movies when I should have been sleeping, tossed clothes about… The only exceptions were the lack of posters on the walls and that I had permission for the pretty girl to share my bed and I didn’t have to sneak her in the basement window. 🙂
I ended up working for 5 days of the 8 day trip, but I got a good bit of other stuff done this week:
Sorted 3 months of mail – we get a LOT on junk mail
Picked up backyard and garden a little bit – long winter
Went to a couple of our favorite restaurants
Made 3 trips to Woodcraft for toys tools to take back to France
Coffee at C&P 🙂
Cut and edged yard
Fixed a few things
Hung out with my mom
Had great breakfast at Easy Street
Moved a room full of boxes into the basement
Painted a mirror frame for my mom
Ate 2 dozen cookies – true story
Snagged treasure at Goodwill: baseball bats, rolling pins, sweatshirts…
Ridded the yard of filthy, dirty, evil dandelions
Treated the yard for moss
Accidentally poisoned my mom’s cat with Moss Out
Spent evening in veterinary ER and dropped $250
Cat all better now
Turned compost pile
Paid some bills
Set up a Skype account for my mom and showed her how to use it
Got a sweet new pair of running shoes
Arranged for professional lawn care – warned them about the cat
From Trash to Basement Built-in
I was at one of the architectural salvage places in the SODO area of Seattle one fine summer day 3 years ago and as I was leaving with whatever small treasure I had found (picture Sméagol with his Precious…), I spied a bit of white cabinetry and what looked like a paneled cabinet door in their free/meant-for-the-dumpster pile so I went over and looked to see if I could salvage a bit of whatever it was. The hope was for a door that I could re-purpose or some cool hardware left intact, but I struck gold! Some idiot used a pry-bar and a Sawzall to rip a built-in painted hutch out of a house’s wall during a remodel. It was taken to the salvage shop without a back, one side missing, no top, zero trim left, and with rough recent tool/pry marks all over it. All the shelves were there and the door that I had seen was one of four heavily painted paneled oak doors. I saw some promise and had an exact spot for it, so I piled the wreckage in the back of my truck, roped it down, and sped away before someone could tell me no.
It languished in the basement for part of a year before I tightened the joints, squared it all up, made a back from pine bead-board, built a matching side panel, reinforced the structure and installed it on one of our basement den walls. What used to be the open counter-top space between the original built-in base and top, became storage for boots or snowboards or books (which is what is there now).
I wanted to include Stamp-With-Foot in the project, so I took her with me to pick out some trim. She found a section of fancy scalloped-cut chair rail/case molding that she REALLY liked and I went home and used it in a custom buildup: adding a section of ripped down base molding and a length of popular wood that I ran over with two different router bits to make the top trim.
After getting the piece installed, I realized that I would have a 5″ gap of dead space between the inside top of the cabinet and the finished top, so I rabbited in two shelf lips and built matching hatch covers to provide storage for long or seldom used items in the top of the cabinet. The hatches were finished with brass ring pulls from a local boat supply hardware shop. After some light sanding, Stamps-With-Foot and I put two coats of white cabinet paint on it and I had The Ruminator help me install antiques glass pulls and keyed latches while he was visiting for Christmas. The piece looks like it was built with the house, the top is already filled with mountaineering books, and is a fantastic addition to our basement and home.
Getting ready for our move to France – first round
We/I have some serious work to do before we move to France for two years and we have a list of stuff that needs to happen. Here is the initial “to-do” post:
The Lawn:
The Nana is going to be moving into our house and will be puttering around the yard, planting flowers and the like, but there is no way that she will be pruning trees, cutting the lawn, weed eating, edging, or pulling pine needles out of the gutters. There is a little time, so we have contracted a crew to start taking are of the lawn now so that any kinks will be worked out.
In the spirit of full disclosure, the timing of this yard work transition was set into full motion only when my lawnmower blew up. Really, really – kaboom! As in there was a silver dollar-sized hole in the side of the piston housing and oil spewed everywhere. Right up until that moment the lawn caed transition was just a good idea. After it died, I threw it in the back of the truck, so it wouldn’t leak anymore oil on my grass and called the lawn service. There were a couple of things after their 1st visit, that I would like done differently, but on the whole, so far so good.
Projects:
The Kitchen HAS TO BE COMPLETED. I have stopped working on my Basement of Doom, the Campaign Camping Furniture, wood turning and a couple of refinish projects until the kitchen is complete. I will work down from there and not take on ANY new projects. I have two chests of drawers and a Duncan Phyfe Table that I want to complete and sell so that I am not storing them.
Shop:
I hate my table saw. I am going to out the beast on Craig’s List along with my contractor’s saw (Just collects spiders and sawdust), 12″ band-saw, small joiner, small drill press and the miter-box saw. None of them will work in France (50Hz vs. 60Hz power issues), so I can’t take’em with me. They are all old and have had a good life with me. It is time that I pass them on to new homes where they will see less use and live out their golden years making soapbox derby cars and bird feeders. I am planning to use any money made to invest in both some quality carving chisels and I will save part for the down payment on all new, cabinet shop-quality, power tools when we return to the US.
I can’t not build stuff, so I am taking the Anarchist’s Tool Chest route and am taking a rebuilt an old ammo/tool box (see evolution in pictures below) into a more useful tool travel case and will then show up in France with planes (22 of them), carving knives, mallets, hand saws, chisels, etc… The plan is to make smaller more detailed items, mostly by hand, while I am there (I will be sourcing a lathe and doing some bowl work though…).
Easter in Japan
My J-O-B occasionally has me fly all over God’s Green Earth with zero to little notice to provide support when something is wrong with an airplane or aircraft system. It never happens on a wednesday at 9:00am. Nope, I usually get the call as I am headed out the door for a 3-4 day holiday weekend with the family. I spent Thanksgiving a couple of years ago in Abu Dhabi, there have been Labor and Memorial Days spent in England/Northern Ireland, and I cannot remember the last MLK weekend that I got to hang out at the house.
This past Friday was one of those days: I got off work and was home just long enough to put on my shop apron, turn on the shop lights, and cut a piece of 47X13.75″ 1/2 plywood for my basement bench before my phone started blowing up. After about 9 calls to and fro, I had tickets booked for the first direct flight out to Tokyo the next morning and a semi-unhappy wife. Stamps-With-Foot has been very gracious about my last minute travel over the past 9 years. She understands that my employer’s ability to have me do these types of trips are part of the reason that we live where we do, have our cute house, and can save for college funds & retirement. That doesn’t mean she doesn’t still get a little miffed – this trip is going to cost me something shinny, I can feel it.
Anyway, I love Japan in general and am here for couple of days. I will have a chance to pick up some ruffled-feather-soothing Japanese gifts for my my wife and mother (The Nana had planned a sunrise Easter Mass/Service as a family outing and was not please that I “bailed”), and there are a couple of things I want to pick up for the kids while I am here, so life shouldn’t be too hard for me when I fly home 🙂
Roller Derby, St. Paddy, Dresser Building and an Anniversary Weekend
This weekend was busy with friends, a dinner out, St. Paddy’s Day activities, an outing to the Roller Derby (?!), and the 9th anniversary of the day that my sweet wife and I met was on Sunday. Even with all that, we still got bunches done around the house: Our under-bed dresser finished, bathroom table drawer installed (a little work on that left), wine crate storage boxes made, basement lighting installed, and the basement work bench is moving along.
The drawers for the under-bed dresser and the one for the bathroom all came from a wooden donor-dresser that my father-in-law drug home from a garage sale last summer. He paid $4 for it and it was in pretty bad shape, but it was solid wood and had potential. It was mistakenly left in the weather (plastic cover leaked) for a month before I salvaged the drawers, cut out off the top and used the sides for kitchen cabinet door panels. I re-squared the drawers, added dividers in the fall, and over the Christmas break sealed the insides (The Ruminator helped). After lots of filling and sanding and more sanding, I stained the fronts to match our bedroom furniture, then built ¾” plywood beams to hang the drawers from bed frame and used some scrap oak flooring as drawer guides/runners. The final product really looks good and is super functional. While some husbands bug their wives by filling the house with brought-home junk – I give my wife more and more and more storage and organization space.
On Sunday, I put the final coat of finish on the basement workbench top, let it dry, and then installed the three runs of aluminum t-track. Stamps-With-Foot bucked up and helped me wrestle its 200 pound beech and maple mass onto the steel base. I secured it with screws and covered the top with carpet squares while I finish the upper shelf/cabinet. I installed a outlet power strip under the main body of the topper and removed the old drawer dividers. I will soon add a plywood back with a mirror, a light under, a dedicated air supply line, install the desk drawers under the bench and mount 4 reclaimed letterpress drawers directly under the top as well. Happy with the progress so far.
I will end up muttering to myself.
I have come to both love and accept my wife’s little quirks. I don’t understand them all and from time to time I have to just shake my head and mutter after finding something odd in the recycling or noticing that kitchen silverware was used to dig in the flower beds for example. I have also discovered that it is best to work within the confines of these quirks instead of confronting them/her with what most people would call reason. That confrontation would lead to a two hour discussion that would, in turn, lead nowhere. I would have to apologize for even bringing it up and then I would have to buy her something shiny for my transgression. In the end, I would be right back where I started – muttering to myself and slowly shaking my head with my lips pursed in an expression of both frustration and amazement.
Stamps-With-Foot is very visual and she has to SEE something for it to be real for her. Visualization of a concept like arranging pictures on the wall, where flowers COULD go in the yard, or where to move a chair in the living room is an exercise in frustration. This normally means that after a week+ of debating where a piece of furniture should go, I will move it 4-9 times before she decides that the original decision was the correct one. This comes up for me because we have been talking about to swapping offices at home. Her sewing/estrogen room will go upstairs to the sunny well-lit wood-floored bedroom at the front of our house and I will move my faux-Edwardian office/man-cave into the basement so that it will be co-located to my tiny hobby machine shop, work bench, and our den: A win/win for us both of us as long as I don’t have to move crap up and down and around for two days.
In the spirit of working with her previously addressed/documented traits, I formulated a plan to have it all work in my favor. I measured and drew a scale model of the room upstairs, showing locations of the doors, windows, and air vents. Then, I made scale cutouts of all the furniture that she could possibly have in the room. I left her with the drawing and cutout so that she could torment and second guess herself in peace while I went into the basement and worked on my new machine shop bench. 24 hours later and after looking at every possible combination at least 6 times, she had determined a location for each and every twig for her sewing nest and taped her choices for furniture location down on the drawing. I have elicited a promise that her decision is a final one and that if there is a change in any of the locations it will be made before the very first piece is picked up and humped upstairs.
Now all that is left for me to do is to bribe/con some friends and neighbors into helping move all the crap, putting it in its designated place and then to disappear in to my basement to plot my plan for world domination…. Mwahahahaha….
The Never Ending Hutch
- Looked at hutch for too long and decided to get it done.
- Started with bottom section – doors removed.
- Stripped off all old paint and varnish from outside with “environmentally friendly” orange stripper.
- Scraped and scraped stripper off.
- Cussed “environmentally friendly.”
- Put more stripper on.
- Scrubbed off again.
- Wife helped for 40 minutes, hated it and didn’t touch either section again.
- Shoved a 1″ splinter under one of my fingernails.
- Said the “F” word 5+ times, bled on base & floor and thought about cutting it all up for firewood.
- Washed whole thing with paint thinner to stop the stripper residue from working any more.
- Let dry and sanded whole case with 120 grit.
- Sanded with 220 grit.
- Sanded again with 220 grit.
- Stained with a crazy pricey, but color-matched mahogany tinted oil-based stain.
- Used wife’s special dish gloves.
- The old, old fir had issue with the stain and was a little splotchy in some really key spots.
- Was grumpy for two days.
- Second coat of stain used to blend some areas.
- Put on first coat of wipe-on poly acrylic semi-gloss finish.
- Wife found stain covered dish gloves and I got in trouble.
- Went to store and bought wife new gloves.
- 24 hours later, scuffed finish with white 3M pad and applied finish coat 7 more times.
- Spent HOURS on the final coat.
- Repeated all above steps with the four raised panel doors.
- Installed 100+ year old glass pull-knobs on doors.
- Whole process took two months.
- Moved base into finished side of basement for use as a media cabinet and LCD TV base.
- Went downtown to Chinese-owned granite shop on Seattle’s 1st Ave and haggled over granite for top.
- I am a poor negotiator in Chinese.
- Left and came back with Mandarin speaking co-worker.
- Got GREAT deal on custom top. 1/12th of the price that I was quoted at Home Depot – really!
- Built A-frame jig for back of truck to haul granite.
- Picked up top and hauled home.
- Bribed 4 neighbors to help move it into place.
- Neighbors won’t answer my call anymore…
- Four months from start to finish.
- Two weeks later I started the top section.
- Decided to make top section into a living room “built-in.”
- Built, painted and installed new 8″ base for the top section in our living room to match existing trim.
- Removed the doors, hardware, and hinges.
- Repeated steps above with the exception of splinter under nail and use of wife’s gloves: I learned my lesson the first time.
- Cut hole in back for outlet already on wall.
- Had other, unsuspecting neighbors help me move the top section up.
- New neighbors called me names after it was all done.
- Hole for outlet 1″ off to the left.
- Said hateful words.
- Grumpy again.
- Calmed down and used Dremel tool and coping saw to remove section from one side and glued it to other side.
- Trimmed out outlet hole.
- Stained and finished outlet trim.
- Had wedding and took 30 day break in the rebuild/refinish process.
- Started looking for matching trim and crown molding at reclaimed lumber yards.
- No Luck.
- Had crown custom milled at high cost by a shop in SODO that had 90 year old machines running on their floor (shop closed about a month after I was there last 🙁
- Started the process of refinishing the doors.
- Installed crown molding.
- Shot nail through molding and into palm on final piece of crown.
- Bled on top of hutch – no dirty words.
- Installed refinished doors.
- Built two interior shelves out of 80 year old fir floor boards. Stained and finished – look original!
- Smacked the back of my head when installing shelves and almost knocked myself out.
- Sourced and purchased piece of wavy restoration glass to match original broken pane.
- Stained and finished the crown.
- Put final coat of trim paint on the new base.
- Installed the one missing glass pane.
- 5 months after base installed the top is done and looks like it has been in our place since 1928.
Weekend Update
We had an eventful, rain soaked weekend. Lots of stuff got done, but it wasn’t the sort of thing that great novelists write thought provoking prose about. Maybe a SNL skit though. Details below.
Friday:
Home from work and into jammies.
Sent some e-mail and web-surfed.
Yummy pizza for dinner.
Finished watching season 6 of Dexter – Debra KNOWS!!
Heard weird water noise outside of basement window…
SHIT!!! Gutters clogged!
Ran outside, pulled ladder out, said DIRTY WORDS.
Up on rickety old wooden extension ladder after midnight in a rainstorm…
Prayed for the death of my neighbor’s pine tree.
No, really. Prayed for the tree to die or for neighbor to sell me his house so I can have the pleasure of turning it into mulch.
Dried off and apologized to Stamps-With-Foot for snapping at her while 15′ in the air, digging out leaves from the clogged downspout.
Off to bed.
Passed out and dropped Kindle on the floor -still works.
Saturday:
Up at 10:00 – no time for coffee – grrrrrr…
Drove downtown with my mother to see a talk by Clay Jenkinson – a Jefferson and TR scholar – my two favorite presidents.
Coffee and half a cookie for brunch – health food…
Presentation was great – funny and enlightening.
Took Mother to grocery store then home.
Called The Ruminator and chatted about Christmas lists and school and stuff.
Cleaned living room floors and rug.
Cussed the neighbor’s tree again – pine needles everywhere.
HATE that tree.
Took sweet wife to see shiny vampire movie instead of new 007 – we suffer for those we love.
Snuck food and cookie into movie.
Came home and obsessively checked gutters for clogs and basement for water for the next 24 hours.
Cursed tree – shook fist at it like an old man.
Spent some time in the hot tub in the rain relaxing/fantasizing about a chainsaw, limbs on the ground, and wood chips everywhere while laughing maniacally.
Went to look at Pintrest “for a minute” before bed – closed iPad 4 hours later at 3:45am.
Sunday:
Slept late.
Breakfast.
Skype/FaceTime call with friends in Germany.
Miss them.
Worked on mid-century modern style bookshelf for bedroom.
Poked 20ish holes in wall looking for a studs. Stud-finder worthless on plaster walls.
Threw stud finder.
Hung shelf in a partial stage of completion. Will paint later.
Worked out Christmas budget with sweet wife.
Re-arranged living room to make room for Christmas tree.
Set iPad on top of built-in hutch to keep it out of the way and “safe.”
Watched helplessly as iPad slipped into crack and fell 5 feet and between hutch and wall.
Stared at wood, disbelieving.
Said foul, vile, hateful things.
Paused to collect myself.
Said foul, vile, hateful things again.
Contemplated getting the sledge hammer and splitting maul out.
Had to walk away before I broke stuff.
Went to Target: mood did not improve.
Shopped for Christmas tree in driving cold rain: mood still poor.
Found a nice, full 7′ tall Noble Fir.
Let tree air dry a bit and put it up in living room.
Worked on Christmas cards with sweet wife.
Wrote some funny stuff on cards to friends and family.
Went out to my little shop and cut two long 1/2″X5/8″ sticks of fir & popular.
Attached L-bracket to the ends.
Fished iPad out using the chopstick technique.
Wife so impressed, she bragged about my big ol’ brain on Facebook.
For just a second, I thought “When McGyver spends alone-time with a bottle of lotion, he is thinking of ME….”
Remembered that I was the dumb-ass that dropped it there in the first place and decided not to let me ego run rampant.
Mood improved.
More Christmas cards.
House smells like Christmas.
Hottubing.
Taught cat to hop onto edge of tub.
Fought internal demon to keep from teaching her to swim.
Also resisted the urge to splash.
Shower and shave – need new blades
Read kindle.
Dog snored like a 70 year old alcoholic man with sleep apnea.
Put him on wife’s side of the bed so they could snuggle.
Night-night time.