2019 News Year’s Resolutions:

A year ago, to the day, I said that I would do a bunch of stuff in 2018.  Well, if you want to hear God Laugh, tell him your plans…

Life was sort of turn upside down this year with continuing hip issues, an unplanned knee surgery, a job change, house rebuild craziness.  If you factor in my own laziness, stubbornness, and my A+ skill level of procrastination I did not get even half of my list ticked off. From that list of 50 Things, the items below are what I actually did get done:

Organize my chaos in the shop and basement. – Basement done!
Sell, donate, recycle, or throw away shit that I do not use.
Use my planner and notebooks as tools not as something that I “have” to use.
Take my desk at home back and make it a conducive writing space.
Fly my drones more
Finish my CJ-7 Jeep restoration
Sign up for a letterpress class at SVC Downtown
Take another blacksmithing class at The Pratt
Give some $$ to Heifer and MFS
Be involved in politics more: financially and with a time commitment
Finish the house remodel –  even if I have to pay a contractor to do it (shudder…)
Make.More.Stuff!!
Ride my snowboard and skateboard because I am not too old or too fat
Road trip in WA and on West Coast more
Take my wife on vacation

For 2019, I am going to keep it a little simpler:

  1. Work really hard to stay healthy and avoid any more orthopedic surgery
  2. Quit Twitter for good this time.
  3. Get on my bike
  4. Lose the extra weight
  5. Be a great engineer
  6. Make better and better YouTube videos.
  7. Read more
  8. Spend more time with Family
  9. Worry about the house less
  10. Finish and USE my shop to its fullest.
  11. Be happier and remove negative folks and situations from my day to day.
  12. Take some more classes
  13. Make more friends
  14. Be involved in my community
  15. Buy and consume less
  16. Simplify

House Painting – Attic Installment

I documented the process to paint the attic conversion that we have spent a couple of months working on. I am using a Graco airless spray rig that I bought a few years ago at a big box store. It has paid for itself MANY times over. This is part 1 of a 2 part video series. In this one, I sprayed the drywall primer and the trim paint. For paint I only use Benjamin Moore. It is my favorite to use and it wears amazing – not cheap though. Wear your mask and keep your lungs healthy!

Catching up and writing more

I have not been writing as much in the last few months as I should.  I have lots of excuses:

  1. House Remodel
  2. Hectic Work Schedule
  3. Jeep Rebuild
  4. A focus on film making and growing my YouTube presence
  5. Lawn and Garden care – seriously, this takes up a lot of my time.
  6. Too much TV and interwebs…
  7. Blah, Blah, Blah…

When you get to the base of it all though, the answer is that I have made time for all the other things that keep me sane/make me crazy except for writing.  I am renewing my focus and will be posting more words to go along with all of the pictures and video.

Let’s start with an update of current stuff:

The Attic

We are so close to being done with the attic conversion.  I have to put a couple of coats on the closet door and one on the stair railing and paint the 4 walls with a couple coats of the almond eggshell that my wife picked out.  The new hardwood flooring is being delivered today and it will be installed on Friday.  I will spend the weekend installing the stair treads and kickers/risers.  The receptacles, switches and lights are the last serious items that will go in before I touch-up a little paint here & there and I will be done and can focus on the basement.

Basement

We are 75% there.  All tiled laid, grout done and a functioning toilet!!  I need to finish the trim install, hang two doors and then paint EVERYTHING!  I am having a custom shower rod TIG welded together and will be building the double sink vanity.  I have to tack together & paint the medicine cabinet door and mirror frames as well.  After all is in, we will have a plumber come out for the sink install and shower hook up.  I don’t plumb.  I am afraid of flooding my house with water or sewage.  I leave that job to the professionals.

Main Level Bath

The tube tile surround is being replaced in two weeks with 6” subway and small hex tile.  The new bathroom mirror will be going in this week, and I have to have the exhaust fan switch rewired.

Jeep

I had a solid weekend working on the Jeep.  The taillights are installed, the winch is re-wired, mirrors installed, windshield back on with new gasket and PLENTY on extra silicone.  The upper KC spotlights are re-installed, and an issue with the front speakers if fixed.  I still need to paint and install the spare tire rack, as well as the CB, megaphone speaker, 2nd battery, air compressor, lower KC spot lights, passenger headlight, rub rails, whip antenna, headlight trim rings, and polish the rear tube bumper.

The current plan is to leave the top COMPLETELY off until fall when I re-install the soft top.  I need to finish the Hi-Lift Jack rebuild project, have the speedometer serviced, and replace my tube pads as well before the cold winter wind blows.

Garage

The shop of me dreams is packed full of everyone else’s crap right now.  It is all leaving by the last weekend in July if I have to put it all out on the road.  I need to finish wiring in my 40K lumens of LED lighting, a 50AMP plug, a couple of 220/30amp plugs and have an electrician connect all into my service panel.

House Exterior

  1. Downspout in back needs attention
  2. A section of soffit need looking at and possibly repaired
  3. I need to weld together the Juliet Balcony outside the dining room
  4. Weld railing for rear steps
  5. The new front windows need a little trim and paint
  6. Dining room window needs trim and paint
  7. The rear steps need to be painted
  8. The chimney needs to be repointed before fall/winter
  9. Basement railing needs to be installed
  10. Both front railings need to be sanded and repainted.
  11. External security alarm siren need to be installed
  12. A tiny bit of concrete need to be pouted
  13. Two security cameras need to be swapped out for the lower profile ones

The yard

Man, the front yard is good, a little weeding and bush trimming maybe.  The back yard though…  It is still a disaster, or at least ½ a disaster.  I want to fill 3-4 gabion baskets with all the rocks left over from a previous owner’s attempt at pond-scaping and make benches around out fire pit.  We will be adding a steel arbor from the garage to the patio this fall that I am welding up on-site.  The patio table and chairs will get a proper sanding and oiling this weekend and we need/want an umbrella of it this year.  I want to add a tool shed and additional firewood racks to the side yard.   And finally, the small yard next to the garage is my makeshift apiary and I would like to make that both permanent and presentable with some additional hives, gravel and flower plants in narrow garden boxes.

Health

Stamps-With-Foot, my mom, and the kids are good.  I am feeling all of my 40+ years lately though.  My hip is still painful a full year after reconstruction.  I may have torn the meniscus in my left knee, AND I have Fucking Tennis elbow from chopping firewood!!  Not being able to run and bike, coupled with my love of cookies, has left me with a classic “Dad-bod” and even my fat pants are tight right now.  Eating better now.  Trying to get between 7 and 10K steps in a day, having the knee looked at, and working on the elbow.  We are going to Hawaii in February and I need at least a 2-pac as there will be MANY shirtless days in and under the water, for my arm to feel better, and my knee and hip to be like 70%.

Other

Work is work, but I have really traveled at all this year and that is awesome!  Still wish I was building cabinets for a living, covered in man-glitter, smiling but that will have to wait.  I will be traveling to Arkansas this fall to see my daughter and her family.  My son will be here in Seattle for a couple of weeks this summer.  I hope to tour a couple of colleges with him.  My wife and I have a couple of road trips planned and I want to get out on my bike, kayak, and skate board a little (don’t tell my wife or knee Dr. about the board…) I have started recording for a monthly Podcast.  A friend conned me into it after a few years of asking.  I am going to just sit and tell stories without naming names or implicating myself in any illegal activities that are not past the statute of limitations.  As a reward for losing weight I will go ahead and finish out both of my tattooed arm sleeves and my wife and I are planning matching bee tattoos for our anniversary.  I still have not bought a boat or a motorcycle, so she will keep me for a while longer

Film Friday – Double Feature: Attic and Bath Remodel Status

I spent two FULL days, with a little help from my wife, instaling the baseboard, door, skylight, stair, and window trim in the new attic space. This video includes a few tips and tricks along the way. As this will be my wife’s studio space, she put in some sweat equity filling nail holes, doing a little sanding, and she chose the paint scheme. I will be painting next and will document that whole process as well.

This is Part 1 of our basement bathroom build/finish. We decided to add a basement bathroom when we replumbed the house a couple of years ago. 6 months of chaos insued and we took a two year break before diving back into the bathroom build. This time has been SO much better. We went with white subway tile for the walls, black and while hex tiles for the floor, and charcoal grout. The next step is trim, paint and fixture install.

Film Friday – Attic Remodel: Week 7

This is the last of the weekly updates for the Attic Remodel Project. The heavy work and drywall is complete and I will start trimming and painting the space this week (nights and weekends as I have a real J-O-B) so that my wife will have a studio that is full of light and opportunity. The next and final installment of the attic build will show all the paint and trim steps, some tips & tricks, and will be a few weeks away.

This weekend was full. I really need to stop working on my days off.

Welding Cart experienced a failed wheel/axle combo
I said dirty words and decided to replace rather then rebuild
Also decided to upgrade – just a little.
Sourced new cart and used a 20% off Coupon
Assembled new Harbor Freight/General Tools MIG welding cart
Recorded a video of whole experiebce for YouTube channel
Wired in a couple plugs and lights in the attic.
Worked on linocut of our dog Brodie and of a mountain scene print for two letterpress projects.
Wove a 9”+ pine needle coiled basket – because I can.
Made like 6 Instagram posts
Played Ukulele for a bit.
Recorded a couple of riffs and a drum track
Started building a podcast tool for website – slow going
Made a run to the city dump with a trailer load of building material/construction waste.
Mowed and edged yard.
Worked on the washing machine
called it names until it worked
Spent an hour looking for new Jeep parts that disappeared in the garage.
Said more dirty words – there is a theme here…
Found the parts
Installed front blinkers and driver’s side head light.
Completely failed at installing LED tail lights.
Threw a little fit.
Asked questions and then ranted on the Internet forums.
Packet the LEDs back up, returned them, and ordered replacements with regular bulbs.
Sat in yard and drank some Rose’
slept late (8:30) on Sunday morning
Cleaned backyard a little
Took Mom to lunch
Celebrated Mother’s Day
Took mom to nursery for flowers and yarn shop for some skeins of alpaca wool.
Installed new fender flairs on the Jeep.
Installed new Jeep bumper and re-installed winch
HUGE pain and took forever
Two band-Aids with consumed.
Wore good cloths while wrenching.
Wife caught me with grease on shorts
She made wet-cat noise and I got in trouble…
Organized and hauled out all of the recycling from house and garage.
Drank wine in the front yard.
Drank some more wine.
Binged watched season 2 of Westworld to catch up.

Attic Remodel: Week 6

This week, we went from bare studs to insulation to wiring to drywall with a dash of new windows thrown in for good measure. The HVAC split unit head vacuum & power lines were installed and we had a serious accident in the attic that occurred during that process.

Film Friday – Week 2 of the Attic Rebuild

I know… I have been posting a bunch of videos lately and not a lot of travel, Jeep, Puppy, garden, music, building, or other normal posts.  That will change with the coming of Spring and the completion of our attic remodel/rebuild.  In that vain, below is the short video documenting week 2 of the process.  It looks like it will be a 5-part series.

Mid-week Update

So, this week has been crazy at work and at home. On the home-front, there were birthdays, shopping, it is Income Tax time, we have 3-4 guys showing up every morning at 7:00 with tools in hand to work in and on the attic.

My shop is full.  I can’t even get to my table saw and my bench is stacked 5′ high with insulation.   I need a little shop time to keep me sane or at least saner…  So, I took a little me time and signed up for some classes for spring and early summer where I will get use other folks shops and build/make stuff:

  1. Canoe Paddle Making
  2. Claw and Ball Foot Carving
  3. A 10-Week Letter Press Workshop
  4. Woodcarving Figures
  5. Spoon Carving
  6. Block Printing
  7. Industrial Sewing: canvas and leather

Spring Has Sprung – 2018

With the official start of Spring – as determined by the fact that my wife was reading a book, enjoying the sunshine, and drinking wine in the yard – we had a busy weekend at La Maison Du Talley:

Moved all the power tools in the shop against the wall for temp storage duty
Ordered material for attic finish
Set up new iPhone (old one a brick!)
Checkout at Pratt to be able to independently use their fabrication shop.
Moved everyone else’s crap out of my basement and temporarily into the garage
Said dirty words about all the other people’s crap being stored in our home
Cleaned the basement completely out
Pruned the apple trees in the backyard
Restacked the firewood wood pile
Cleaned and prepped attic for floor installation
Published two YouTube videos
Set up new condenser microphone in home office/studio
Breakfast with my mom and wife
Went to the Moonshiners 36th Annual Jeep Swap Meet
Did not buy a new-to-me 1946 CJ-2A project Jeep
Stayed Married
Did not buy a motorcycle or boat at the swap meet
Stayed married – there is a theme…
DID buy an ARB on-board air compressor and a duel battery mount – and got a sweet deal!
Signed up for three classes at Pratt for this spring: Block printing, wood carving, and letterpress
Padded and protected the wood floor and built-ins in prep for attic finish
Cleaned the hot tub
Edged and mowed the front and back yard
Spread Weed&Feed on the back yard and parking strip
Re-seeded the front yard

Thieving Bastards…

My neighbor, who is remodeling his just purchased home had his garage and house broken into and a bunch of tools and supplies were taken – mostly hand tools. He and his family thankfully live elsewhere right now, until construction is complete. The thieving bastards were on foot and left the larger tools and job box. There was lots of damage to the newly installed wooden doors that required hours of labor for patches and repair. It was all a huge pain in the ass for him and to add insult they came back a week later in the middle of the night with a u-haul truck to get the bigger stuff. This time they cut through the newly installed deadbolt on the garage with a sawzall, but my neighbor had already moved his tools out, so they left empty-handed.

The thieves were caught on camera both times, but who knows if the police are looking really hard at this. This super sucks for my neighbor and the neighborhood. For me, it heightened my level of worry. I already have an alarm on our house and garage, but haven’t installed the POE cameras yet. They will be going on this weekend and I am also installing an external siren capable of damaging someone the next state’s hearing. I hate that it has come to this and that we all have to be so paranoid, but I have already lost tools to a thief once and I REALLY don’t want it happening again.

Weekend Activities

Seattle is in early summer full bloom. The sun is out and the temperature is perfect!  These conditions led to a really good weekend:

Slept had friends stay with us Friday night and Saturday morning
Big yummy breakfast
Picked three big bowls of ripe Lapin cherries
Ate a lot of cherries
Went over to my mother’s house
Took care of house projects for her
Had a yummy dinner
Nice bottle of red wine was opened and mostly consumed
Read American Gods aloud with Stamps-With-Foot before bed

Matt Talley Farmer's Market 07-2017 (2)

Matt Talley Farmer's Market 07-2017 (1)

Matt Talley_Cherry Crop_2017

 

 

 

 

Brunch with Friends
Went to the Sunday farmer’s market
Bought cheese and honey!
Went to the garden store
Bought a bunch of flowers for the yard
Walked the puppies
Planted flowers
Scattered weed&feed in the 1/3 of the back yard that is void of Ireland-green grass
scattered and raked grass seed.
Murdered dandelions
Picked up a mountain of puppy-made landmines 🙁
Mowed the yard
Installed new tire cover on Jeep spare
Put Jeep on the car lift – also now refereed to as “The Jeep Sex Swing”
Changed oil and filter
Only 42 more Oil Changes and the lift pays for itself!! 🙂
Lubed the chassis
Checked and topped off all the fluids
Made happy noises
Had a Coke and smile afterward while sitting in the shade
Printed out GAINT ’84-’86 Jeep Maintenance Manual
Let my internal OCD monster out to play
Custom labels and tabbed separators were made…
Added folders with Maintenance Manuals to shelf in the garage
Watered the garden, yard, and newly seeded dirt patch
More reading
Sleep

Matt Talley Changing oil_07-2017 Jeep (2)

IMG_3759

Matt Talley Changing oil_07-2017 Jeep (1)

Matt Talley Jeep_07-2017 (1)

Matt Talley Garden 2017

Film Friday – Corner Cabinet Up-Cycle/Rebuild

Way back in November of 2015, just after our return from living abroad for two years, I bought a set of hard used, little loved corner cabinets from a local salvage place. I have spent an hour and there installing, building trim, sanding, de-gunking, stripping old paint, priming, painting, and more painting. It has only taken 18 months, but they are now installed and look like they have been in our living room since the very first day.

Here is a slideshow/video tale of the steps taken in the project: What it was to what it became.

My Week in Review

This past week has been a week of mish-mash happenings:

90-day Post-surgery hip appointment: Could have gone better.
Fruit tree pruning
I built a lid for the compost boxes
A rat didn’t like my lid and chewed through the side to get at the worms in the compost bin
I said dirty words
Mounted 7 up-cycled cabinets in the garage
Finished painting 80 liner feet of 1/4 round trim.
Sweep and cleaned GROP
Organized some stuff into new shelves and cabinets.
Finished painting the corner shelf doors – 5 total coats of fresh paint
Installed the hinges and hung the doors on wrong cabinets
Said dirty words
Re-hung doors on the correct cabinet.
Scratched paint
More dirty words
Touched up paint
Finished corner cabinet install
Did some Physical Therapy for my Old Man hip
Mowed and edged the yard
Read a book
Made a few Instagram and Twitter posts
Amazon sent me a new tool!
Flew drone one afternoon after J-O-B
Planted the boxwood shrubs
Bought garden starts at Nursery: tomatoes, corn, squash, zucchini, peppers,herbs, lettuce, etc…
50+ hours at my J-O-B, hustlin’ to keep us fed and the lights on
Watched about 2 hours of NetFlix
Gave away a bed in our home office
Had to delver it to new owner
Drank some French wine
Worked on cedar log garden table
Bought couch/guest bed for the office/TV room
Braved the gauntlet at IKEA – three hours to pick up a pre-ordered couch 🙁
IKEA gave me a $50 discount for the trouble
Had to source clear glass Victorian-style pull knobs for the corner cabinet doors
Spoke to both of my children for Father’s Day
Heart Happy
Planted summer garden
There was some coffee drinking and puppy snuggling
Took top off of Jeep for the first time in 1.5 years
Started Raining the second I took it out of the Garage
Made grumpy noises
Had coffee and listened to a bluegrass jam session at favorite coffee shop
Watched a movie
Was prolific on Twitter and Instagram
Murdered some dandelions
Rode around neighborhood on errands in topless Jeep when it stopped raining
Made happy noises
Sent some J-O-B e-mails from home
Started reading American Gods out loud with my awesome wife
Went to bed to start it all over again on Monday morning

Matt Talley_garden_Seattle_2017 (2)

Matt Talley_Corner Cabinet Rebuild_2017

Matt Talley_garden_Seattle_2017 (1)

Getting Stuff Done Over the Weekend

We had a really productive weekend around the house – so much so that I to take an old guy nap on Sunday. In no particular order:

Organized and cleaned up shop from Garage sale two weekends ago
Took 10 boxes of good stuff to Goodwill
Bought and brought home cabinets and wine racks from Habitat for Humanity in Tukwila
Sourced and purchased some additional boxwood shrubs and mulch for the yard
Mowed the new sod in the yard for the first time
Took the puppies for a walk
Date Night: Burgers and a late 3D showing of Wonder Woman.
Cleaned house
Spent 1.5 hours looking for either one of my orbital sanders
Said dirty words the whole time
Sanded Corner cabinet doors
Shocked the hot-tub with chemicals getting ready for water and filter change
ad a couple of nice glasses of French rosé in the sunshine.
Made lid from up-cycled ceder fence boards and used hardware for the compost bins
Hung two paintings
Organized dining room
mounted 6 stringed instruments in the hallway
Installed new toilet seat
Ran the chainsaw a bit
Made some woodchips and used as garden bed mulch
Picked up 4 huge rounds of cedar from a neighbor who has a tree cut down to split for kindling
Took out trash and recycling – there was a LOT of the latter
Met new neighbor
Another walk with the puppies
Made a trip to CostCo and dropped more $$ that we wanted to
Paid $12 for a used plywood miter saw station – SCORE!
Drank lots of coffee
Murdered some dandelions in the yard
Paid some bills
Wrote a couple “Thank You” notes
Read a little
Didn’t sleep enough

IMG_3440

IMG_3450

IMG_3454

IMG_3455

IMG_3460

VURB0422

 

Garage Sale Saturday

We have a LOT of crap.  No, like a lot, lot.  In an attempt to simplify and sort our life out, we need to purge and are using the normal options: Craigslist for some of the furniture, books to the used book shop for credit, eBay for anything with real value to nerdy-folk, Goodwill for this and that, and we are having a garage sale.

Starting a couple of weeks ago, we started the planning and logistics to be included in the yearly West Seattle Community Garage Sale.  It is huge with more than 180 individual sale sites, press, an online map, etc… and increases our changes of selling more stuff due to the increased possibility of traffic.

We had a yard sale before our move to France, but this one will be larger and as we have a garage now, it will be a proper all-weather shindig.  My mom and a couple of neighbors are throwing stuff in and we are selling tools, books, bikes, furniture, dishes, electronics, computer cables, sports gear, fishing gear, clothes, shoes, picture frames, puppy crates, posters, some more tools, nick-knacks, furniture, and gobs of other stuff.

Stamps-With-Foot is hoping to make $700 from the sale.  I am not that optimistic, but you never know.

5/13/2017 Update:
The sale went OK, though I think that the weather conspired against us a little. We made $480 total with some Craigslist help and did get rid of a ton of crap. What didn’t go will be headed to next week.  Side note:  Someone puked wine on the side of my garage after a little neighborhood after party.  

What I Want Thursday – April 13th, 2017

Below are the things that I really want and that are present for me today:

To unclutter my life: less superfluous stuff
For my hip to be 100% and to never have to use crutches again
A wish for Brodie to be well and 100% cancer free
More time with my children and family.
Sunshine!!
Summer BBQs and cold rosé in the back yard.
For the basement (mostly the bathroom) to be done.
Hand-written letters – on actual paper – from my kids, friends and family.
A warm, sunny beach vacation
For the US Political system not to be dysfunctional and a little/lot less crazy

The New Kitchen Floor is Now Installed

It has been a while since I laid a floor tile – like 18 years.  Things haven’t changed though and while time consuming and very detailed – lots of steps – I still remember how it is done.  There was no way that I was going to pay someone to do a job that I can/could do, so I took on the task of installing a new kitchen floor in our house.  the last of the major projects that I took on during our home remodel.

The job is now done and looks great.  Most importantly though, my wife is happy.  She has a new kitchen floor and it is exactly what she has wanted for years: a black and white checker board kitchen floor that is laid on the diagonal.  I am glad she is happy, because I REALLY don’t want to redo it for the next 90 years or so.

After ripping off 7 layers of old flooring, filling holes, patching a couple sections, removing 40+ screws and 100+ staples, and scrubbing the sub-floor clean, we were ready to start.  Starting about 9:00 one Saturday morning, I cut and laid ¼ inch water resistant underlayment – stapling in the field every 4” and along the seams every 2” with narrow gauge crown staples.  Starting about 10:00 the next morning, I vacuumed the whole space 3 times to clear any and all debris and locked the puppies out of the kitchen.

Because there is not ONE SINGLE square or plumb wall in my entire 90 year old house, I snapped a grid in the middle of the floor, squared from the doorway leading from the living-room, so that it would look square as viewed from the main room of the house.  I applied glue on ½ of the floor and started in the middle of the room and worked toward the south wall/breakfast nook.  Stamps-With-Foot cleaned tile as she pulled it from the cardboard boxes (success is in the details) and handed me them as I laid the field and she cut most of the edge pieces as I marked them.  Her help was GREATLY appreciated.  We laid the other half of the floor, starting about 6:00pm Sunday evening and finished the last piece about 11:30pm.  Not too shabby for one weekend’s worth of labor.

I let the glue cure for five days before sealing and then applying 5 coats of satin floor wax.  Pre-painted (by me) ¼ round trim was applied around the edges of the walls and cabinets before I very carefully brought the appliances back in and reinstalled.  The VC tile I used should outlast my grandchildren and just needs to be scrubbed every other week, then stripped and re-waxed once a year if so.

matt-talley-_-new-kitchen-floor-2017-6matt-talley-_-new-kitchen-floor-2017-7matt-talley-_-new-kitchen-floor-2017-3matt-talley-_-new-kitchen-floor-2017-2matt-talley-_-new-kitchen-floor-2017-4matt-talley-_-new-kitchen-floor-2017-8matt-talley-_-new-kitchen-floor-2017-9matt-talley-_-new-kitchen-floor-2017-1

My Wife’s Prized Chandelier Almost Made Me Poop Myself

We are in the house remodel home stretch. Just small trim details left on the main floor. One of them being my wife’s chandelier installation. I had planned to install the kitchen floor this past weekend, but Stamps-With-Foot had other plans. She sat me down over coffee Saturday morning and made it clear that my plan was out and that her sparkly lamp was in. Always a fan of choosing my battles wisely – into the dining room I went.

I needed to caulk the new dining room crown molding and prep it for paint before I could install the ceiling medallion/escutcheon for the light. It took two passes and some light sanding, but all the cracks and gaps are filled and we were ready to hang the crystal and steel behemoth around 4:00pm on Saturday. I had my wife sitting in the attic holding the chandelier by its safety cable while I wired it to the ceiling junction box. Like in a really bad sit-com, there was a “ping” noise, the safety wire popped, and the stupid-expensive hunk of cut glass and metal headed to the floor. It happened like it was all in slow motion. Now this thing is not small. It is not light. It did not come with handles. From the top of a six-foot ladder, I instinctively reached way out and grabbed her prized chandelier as it fell. I teetered for a second on the top of the ladder, having flashes of crashing to earth and how many stitches I would be getting, before the ladder stopped moving and I was able to slowly walked the beast down to the floor. I did have to check my britches as it was a rough couple of seconds, anything could have happened. Thankfully, just one single tiny glass bit cracked in half from the jolt – super glue will be the answer. The ceiling medallion also popped loose and I had to pull it down, remove the adhesive and remount it, afterward clamping it to the electrical box and taping the edges to the ceiling so that the glue would set up overnight.

After getting the medallion in the air, I went to Home Depot, purchased some 1/8” stainless steel cable and with a swaging tool -everyone should have their own… 🙂 , I remade the safety cable. After waiting until the next morning, I spent an hour installing the beast. My wife danced around with giddy joy when I flipped the switch after all twenty of the 45watt bulbs were installed. Happy wife, happy life…

I will be done painting the trim this week, the blue and yellow tape will come down,  and then the dining room is 100% done. On to the Kitchen.

matt-talley-chandileir-install_2017-1 matt-talley-chandileir-install_2017-2 matt-talley-chandileir-install_2017-3

Christmas Vacation 2016

Christmas vacation this year was pretty good. I got great stuff Christmas morning, my mom stayed over Christmas Eve, and Stamps-With-Foot made a yummy Honey-baked ham for dinner on Christmas Day. I took the week between Christmas and New Year’s off from my J-O-B. The time was spent just hanging out with The Ruminator, finding a little adventure in the mountains, and getting some stuff done around the house and garage. My vacation this year looked like this:

Up at 6:00 Christmas morning and made coffee.
I got an XBox One and Battlefield 1 for I could play with my 40-year old adolescent friends online.
Got lots of other great stuff!
Worked a little in the basement on Boxing Day (the 26th).
My son, The Ruminator, flew in the day after Christmas.
Second Christmas morning with son on the 27th.
I put him to work that afternoon moving stuff in the garage and basement.
Pulled 4 circuits worth of wire in the garage.
Hung 3/4 of crown molding in the dining room.
Hired a carpenter to help with the finish of the crown molding and window install in dining room.
Hung pocket door and built last wall for bathroom downstairs with carpenter.
Installed structure in attic for chandelier installation.
Went to see Rogue One.
Loved it.
Snowboarding trip to Crystal Mountain in the Jeep.
The Ruminator rode really well
I am a fat old guy, but can still ride.
Owners rented the cabin we had reserved to someone else – insert grumpy face
Drove home.
Snuggled with wife.
Up early and drove to Snoqualmie for 2nd day of riding.
Glorious day in the mountains!
Watch a movie all together for New Year’s Eve.
Had family over on the 1st for long lunch.
Tried to edit snowboarding trip film.
Failed.
GoPro Studio sucks balls!
Serious online gaming session.
Brunch at Easy Street.
Got The Ruminator’s cracked iPhone glass fixed.
Picked up new kitchen floor tiles at Lowe’s special order desk.
Dinner with Nana.
Dropped off Ruminator at Airport.
Teared up in Jeep on the way to work.
Worked late first full day back to work in 2017 – an inauspicious start.

matt-talley_snowboarding_christmas-2016-1

matt-talley_easystreetrecords_12-2016

matt-talley_christmas-morning-wife_-2016

matt-and-carlton-talley_christmas-2016

matt-talley_snowboarding_christmas-2016-3

matt-talley_snowboarding_christmas-2016-2

Working on my day off

The house remodel seems to never end…  I will be so glad to just be and live in our space at some point.  We are close, but there are still details left undone – enough that I am trying to concentrate on one room at a time.  My plan is to get each done in turn and then move on to the next.  I wasn’t as successful at that as I wanted to be this weekend as I bounced back and forth between the living room and our bedroom closet, but I did get a ton done.

I installed the upper shelves and corner shelf in the walk-in closet, laminating two layers of 3/4″ plywood for really strong support over a 54″ span and in the unsupported corner.  In addition to using copious amount of glue and screws, I attached the butted plywood edges together with wood biscuits – it is always a fine day when I get to crank up the biscuit joiner.

matt-talley_-notebook_11-2016-3 matt-talley_closet-build_11-2016-2 matt-talley_closet-build_11-2016-1 matt-talley_-notebook_11-2016-2

 

 

 

 

 

 

 

 

Almost a year ago, I sourced some corner shelves at one of the local architectural salvage places for less than $200 – far cheaper than what it would have taken me to build them.  They came out of a 1930-40’s house and were painted Christmas colors, but I knew that they would be perfect for our living room, which was stripped of its built-ins at some point in the last 88 years.  They have sat in storage and until this past week when I pulled them out and got some material together to permanently mount them.  Stamps-With-Foot helped me set them in place after I built sturdy bases.  Each of them cover a wall plug, so I am in the process of re-routing the receptacle using armored cable.  I also have to build in an air-return duct under one and that has taken some serious brain power to get right.  I will add trim this week and my wife and Mother-in-law will paint them cabinet white this weekend.

matt-talley_corner-builtin_11-2016-4 matt-talley_corner-builtin_11-2016-1 matt-talley_corner-builtin_11-2016-2 matt-talley_corner-builtin_11-2016-3 matt-talley_-notebook_11-2016-1

 

 

 

 

 

 

 

 

While I was at it, I punched out a rubber washer for a pot lid knob.  I made the knob a couple years ago out of some scrap cherry firewood after the original plastic one broke.  The original washer had corroded, so I made a new one and installed it.

matt-talley_new-washer-for-pan-lid

I also took a couple minutes to mount the red glass post topper on the back fence.  It was ordered (along with a spare) months ago and have meant to put it on every weekend since.  There is always an excuse for why I didn’t, so I marched right out first thing Saturday with a tube of clear silicone and finally just got it done.  It is the little victories that keep me going.

matt-talley_glass-post-top_11-16

 

Fall has arrived on my street

Outside of the house this weekend there were leaves littering the grass, there was a damp chill, clouds gathered, the sky was a light grey, and the smell of wood smoke was in the air. Fall is my favorite time of year.

Speaking of falling leaves…  Wwe have two paper-bark maple trees (Acer griseum) in our parking strip that I never particularly liked.  For 7 years they have been a little scraggly, are the first to shed the leaves in the fall and the last to leaf-out in the spring. It means that for 6+ months of the year I had dead looking stick trees in front of our house. I have wanted to replace them with ornamental cherries for 6.5 of those seven years, but have been hesitant to cut them because they were healthy and I couldn’t find anyone to take the trees, even after I offered to dig them up, hall them to their new home and assist with re-planting.

Well, it became apparent this spring that one of them is dying. I began plotting and had decided to take them both out this winter and plant cherries this spring. Then something weird happened – the one healthy tree started dropping seed pods – 1st time ever. A lot of them. I am used to seeing the single winged seeds helicoptering to the ground from other trees, but this one drops singles, doubles, triples, and quads. There are very cool and from the top almost look like arrow fetching.

Alright. The healthy one can stay and I have collected seeds to germinate and plant in some property with some oaks, vine maples, plums, pecan, and wall it seedlings I have collected in my travels.

Matt Talley_Fall 2016 (1) Matt Talley_Fall 2016 (2) Matt Talley_Fall 2016 (8) Matt Talley_Fall 2016 (7) Matt Talley_Fall 2016 (4) Matt Talley_Fall 2016 (5) Matt Talley_Fall 2016 (3) Matt Talley_Fall 2016 (6)

 

House Remodel Status September 2, 2016 – 7.5 months in

Here is the house/garage re-build/build status for the 1st part of September.

  1. The F-Bomb Garage has been painted – at least the outside walls.  I need to paint the trim and doors next.
  2. Repaired some major issues with the trim and siding on garage – real unhappy with my garage builder!
  3. Front yard is still green, but need to clean and re-seed the back yard.
  4. There oar only 2 rooms in the house that are complete and need no work at this point.  Stamps-With-Foot could be happier with me right now…
  5. The mounting brackets for the granite in the basement are done and I will install them this weekend.
  6. Our washing machine went out…  fuck.  The bearings finally gave up the ghost.  need to haul it out and put another in.
  7. No garage power yet.  Huge load of confusion between the City of Seattle and my electrician.  Maybe worked out now, but we will see.
  8. The yard is completely fenced in and the rear gate is installed.  just a couple of tweaks and then power wash and polyurethane coat.
  9. The living room corner cabinets are in place, but not painted or installed.
  10. We have a small roof leak – motherfvcker!!!  it is around the kitchen vent and from where the moss removal team got too eager with the power washer.  I will go up there this weekend and seal it.
  11. Got a huge bill from our plumber for work that they didn’t do before abandoning the job.  wanted to scan my ass into the 3D printer and send them a copy.  Called a lawyer instead.  we have a plan forward.

The yard is now secure for the puppies

I spent my evenings after work this week rebuilding 35’ of fence, connecting it to the corners of the new garage, and installing two gates using reclaimed boards and stringers from the original fence that I carefully tore down back in January.  I reused the screws and most of the hardware, but had to buy 7 new treated posts, 2160 lbs of Sakrete, 4 bolts and two 2x8x10s. Total cost was $160 and 14 hours of labor including the tear down and hole digging.

My neighbor has been INCREDIBLY patient with me, my mess, noise, and building debris.  When I rebuilt the fence on her side of the yard, I tore out some more of the existing, replaced two rotten posts and then leveled the tops of each section to make it look nicer.  There were a couple of solid posts left from the previous fence location – about 2′ from the new garage – that I just couldn’t chop down or pull out so, I leveled them up and built her a simple trellis for honey suckle or wisteria.  I also bought her a $50 Starbucks card as a small ‘Thank you!’.

The back gate and adjoining section is a nice mix of mostly reclaimed and reused hardware, boards, bits mixed with new posts and structural support. I did double up on the facing boards (set on both sides) for some additional privacy as our hot tub is right on the other side.  The gate itself used to be on the opposite side of the yard.  I had to trim it a bit to get it to hang plumb, and move some hardware around a little.  I will be adding an additional hinge in the middle for added support and some face boards on the outside as well, so it gives the same amount of privacy and so it matches the fence.   The whole thing then will get a power washing and a coat of polyurethane in the coming weeks.

 

Matt Talley Fence re-build 2016 (3)Matt Talley Fence re-build 2016 (2)Matt Talley Fence re-build 2016 (5) Matt Talley Fence re-build 2016 (6)

Matt Talley Fence re-build 2016 (1)

Not so short contractor rant

We are so close to being done with the garage and the house (yard is still a disaster, which will have to wait ‘til next year, but the stress of dealing with crappy, disorganized, and/or no show contractors throughout this process has been and is so frustrating.  This is not a post to rail on all contractors or even all of our contractors…

We had same great ones:

  1. Maranatha Hardwood Floors showed up on time for the quote. The owner was personable and the quote was reasonable.  They showed up on time, did a beautiful job, listened to a specific request from my wife, there were no extra charges, cleaned up after themselves, and our floor looks great.
  2. RCS Fire Place was A-1: On time, good pricing, no add-on charges, etc…
  3. After an initial sales rep flub, Greenwood Heating & Air did a nice job on our heat pump. Very professional installers.  No complaints.
  4. Vehicle Equipment Solutions was awesome on the lift order and install. I couldn’t be happier with their work.
  5. Our Drywall guys were top notch.  Very professional, great price, showed up when they were supposed to and finished right on time.
  6. The carpet guys that did our bedroom were fast, professional, and did a nice job.
  7. I had some custom wrought iron brackets made and the blacksmith listen to our wants and delivered a beautiful product.
  8. Pacific RIM equipment rental was great in supplying heavy equipment for the garage tear out and site prep. When there was a breakdown, they delivered a new machine and I wasn’t charged for any gas use for the entire weekend.
  9. Bryan at Squak Box was a rock star when it came time to haul out the debris from the old garage and all the old concrete. On time, no hidden costs, dropped the containers perfectly.  Couldn’t ask for more.

And the not so great:

My garage contractor has now quit.  There is little I can do at this point besides shake my head in wonder and disgust.  It has been a bumpy road from almost the start, but I figured that with a little bit of work it would all be OK.  A bit of work turned into a part time job and time spent on the garage was time not spent on the house and that made Stamps-With-Foot grumble.  In addition to the garage tear down and the site preparation that had to be done (40+ hours of my time and ~$3000.  I had to do 4-5 hours of slab/rebar prep when the contractor’s guy messed up, then had to ask for poly burlap to cure the slab, apparently not standard.  I ended up keeping the slab wet for the entire 10-day cure (to limit cracking and allow it to fully harden, then apply the concrete densifier after my normal workday and the end of the cure process.

Installation of fire blocking isn’t required per code in Seattle for a wall less than 10’, but it is the right thing to do.  It was out of scope for the contractor and an additional cost, so The Ruminator and I ended up doing it while he was here on summer vacation.  I had to install two forgotten kicker studs, tighten missed/forgotten anchor bolt nuts, added nails to the hurricane straps, and had to go over punch list items twice before they were addressed.

The windows and door trim were installed incorrectly – I could see daylight in the corners of the windows and I asked that they be re-installed.  When that was being done, my siding got cracked.  I also found that instead of every 16” per code, the siding was nailed every 4’ in some locations.  I called and the foreman came out.  He addressed some issues but caused others.  I then called the owner and he came out.  He agreed with every point I had.  They crew came back and while some items were fixed, others were not and new problems popped up.  I let the owner know and this was his response:

“Unfortunately we’ve succeeded in messing up again.  ____ had no excuse for why he didn’t read my email, about taking the siding out from the bottom of the windows, and what they were thinking with the screws into the bottom of the fascia’s.  If they’d pre-drilled the holes it would have worked and been clean.

I don’t have anyone else in my employee who I could send down to make any corrections, and I don’t think you would trust anyone I sent to do any more work.  What I’d like to offer is to forego our final payment and let  you clean up any items by your self.  I don’t like doing this, I really want to get the job done for  you but we’ve already had three try’s.  I know you might not be as happy as you should be but I want to at least make you satisfied with _____________.”

I am not happy and while I agree that I don’t trust his guys to come back a third time, the keeping of a few hundred bucks does not make it all better.  Now, I either have to find and pay someone else or do it myself.  Frustrating.

I have looked at this.  Am I just an asshole?  Am I too picky or do I expect too much?  I really have looked at this hard and yes, I can be an asshole,  but not in this and not with a single contractor or tradesman on my site.  We provided lunches, Gator-aid, and beer for all the guys working, I talked to every contractor that has been on our property like I would want to be spoken to, If I wanted something different or changed, I addressed it right then by ASKING and wasn’t the least bit of a shit about it.  I cleaned up the job site in the afternoons after I got off work to save them all time and effort.

Is needing someone to stick to a schedule, be on time, and not halfway do something too particular?  I don’t think so.  Is asking that a contractor meet minimum code requirements, pull permits, and do the job they agreed to for the agreed to price crazy?  apparently so.

Other issues:

In addition to the plumbing circus that we had in the spring, we had a carpentry crew that abandoned us for a job where the other customer was screaming louder.  They left tools, work unfinished, material, you name it.   My electrician has been a little flakey – uncashed checks, no shows, showing up unannounced and unscheduled, really hard to get a hold of, etc., but at least this one hasn’t broken into our house while we were gone…  I have had 3 contractors come out for quotes on our basement bathroom tile and never heard from two of them again.  The third guy finally called me back and said the job was just way too small and “not worth the time it would take to set up his wet-saw.”

I get it, all the contractors in Seattle are busier than a puppy with two peckers.  That means that 1. they can be super picky, 2. charge what they want, 3. if they fuck up, no worries, there are three other jobs waiting.

 

 

 

 

 

 

Garage and House Build/Remodel Update – 6/14/16

Garage:

  1. My slab is cured and the densifyer has been applied.  really happy with the results – a big thank you to Mr. Mark Flood!!
  2. The ground around my garage slab is all level.  I rented a Skid-Steer this past weekend and played in the dirt.  Hauled 2 yards of excess over to the neighbors yard to fill some voids and I used the skid-steer to pull out 7 small stumps for her.
  3. Got a call from the builder yesterday and the lumber will be onsite today, Framing starts Wednesday, and trusses are delivered on Friday.
  4. Was asked to move the Honey-bucket so that the lumber would have enough room.  Odd, request for my builder to make of the homeowner/customer, but I did it just so there would be no issues with the lumber delivery.
  5. If schedule holds, windows and siding start next Wednesday, and we will be fully in the dry by next Friday.
  6. It looks like I will be installing the windows as I am more particular than the builder about such things.
  7. My son, The Ruminator, will be here for a few weeks and I will get him help me run wire in the garage shell.
  8. My 2-post car lift will be installed by the end of the month

Matt Talley_Garagfe Slab prep_02

Matt Talley_Garagfe Slab prep_03

Matt Talley_Garagfe Slab prep_07

 

 

 

 

House:

  1. We are finishing up the paint on the main level.
  2. I need to start putting the 1/4 round trim back down.
  3. Bathroom: there is tile work to finish and a mirror to be hung.
  4. Basement remodel is stalled.  We had the head manager for the plumbing company out on Saturday after we found even more problems with the work that was done and we have told them: “…in light of the previous and continuing issues, incomplete work, existing damage caused by your subcontractors that we will have to have repaired, and that the basement portion of our remodel has been brought a complete stop,  my wife and I do not want a____________ employee, or anyone from a subsidiary company back in our home.  We do not wish to continue dealing with _______.”  We can’t really touch anything until they agree to this.  If they do not, then we can’t do anything as the matter will have to be settled via remediation.

What I Want Thursday – June 9th, 2016

Below are the things that I really want and that are present for me today:

For my interior painting to be 100% done in our house.
For my Garage to be 100% built and finished.
More time with my children and family.
Summer BBQs and cold rosé in the yard.
I want to stick to my diet and workout schedule and not fall off the wagon and back into the cookie/café Mocha/lethargic/big-belly/back-hurting abyss.
For the Attic and basement (mostly the bathroom) to be done.
Letters – written on actual paper – from my kids, friends and family.
8″ joiner/planer, 15″ Bandsaw, New Dust collection system for garage
Christopher Ward Quartz Trident with black rubber strap
For the US Political system not to be dysfunctional and a little/lot less crazy

Continued Plumbing Woes…

As mentioned previously, no plumbing permit was pulled for the work in our house and we had to have the BRAND NEW concrete in the basement torn back so that the county inspector can view the pipes and witness a pressure test.  When the inspector arrived for the first try, he found 3 additional issues that the plumbing company (big company, one of the oldest in Seattle) had to address.  They ended up tearing up more concrete, part of our foundation wall and a 2′ section of my BRAND NEW AND FRESHLY PAINTED drywall!!  To add a little insult – I found an empty bottle of wine from a case we imported from France under the trash pile that the first and second crew used in our back yard.  Seriously, why would they leave the bottle?!  As a ‘Fuck You’..?!

I am unhappy and Stamps-With-Foot is livid.  The plumbing company GM came by and was really apologetic and assured us that we would get an update, directly from him, every day.  That hasn’t happened and we had no clue that the concrete was being re-poured until my floor re-finisher called and asked if it was OK that he let the concrete guys in.

The new concrete is super wonky and out of level – 1/2″ below the toilet flange and my tile guy wants $800 in addition to his original quote to lay extra floor leveler.  To rub salt in the wound, the plumbers sent us a bill for $36,000 dollars.  That is not a typo: $36K.  The original agreement was for $9200.00 BEFORE they screwed up.  I called the GM, sent him all the emails that had gone back and forth and he promised that he would get right back to me.  That was a week ago…

Super frustrating.  Out of the 7 contractors that have worked on our house remodel and garage build, the plumbing company is the ONLY one that we have had any issue with.  Everyone else to this point has been super easy to deal with, lived up to their contract, filed for and received permits, and were clear and concise when small issues came up.

I am not naming names – yet.  I am going to see what their next step is.  If they try to bill me for another dime, I won’t hesitate in publishing all the details, pictures, e-mails and text messages here on the interwebs – I get 34K hits to my site a week, so…  I will be having a long talk with the county concerning a fine request, use Angie’s List remediation, file a BBB complaint, file a WA State L&I claim, and then there is the Consumer Protection Division of the WA Attorney Generals office.   That should get things started at least.

Plumbing Screw-up 2016 (1) Plumbing Screw-up 2016 (3) Plumbing Screw-up 2016 (2)Plumbers drank my wine_ 2016

New Floors! Reason #451 for me to have OCD

We are out of the house and living in the basement like quiet mice this week as our floors are being sanded and refinished.  I am both super-stoked and full of trepidation.  Let me explain:  I love my original oak and hemlock floors.  LOVE them!  They are beautiful and I want the entire world to see them shimmer in the sunlight.  However, I do not want them dirty or dented, or scratched, or even breathed on heavily.  That was before they were refinished…

With the new stain (DuraSeal Spice Brown) and 3 coats of hard Swedish Finish, our floors will look even more stunning and I will become a minor dictator of the hardwood – I know this will happen.  Woe be the young lady who steps inside the house with heeled shoes on and I almost feel sorry for the first electrician or plumber that comes in wearing muddy boots.

The plan was to get done with painting before we had the floors done, but contractor scheduling and a huge plumbing oops (more on that later), mean that with are 1/2 done with the painting and will continue as of next week.  The stain goes on today and they will have to cure until Sunday night.

Matt Talley_New floors_2016_02 Matt Talley_New floors_2016_01 Matt Talley_New floors_2016_03

 

 

 

 

5/16/16 Update:

Here they are with the last coat on and dry. We are going to let them harden for a few more days before moving and furniture in and bringing in the paint ladders for finish up the last couple of rooms.

Matt Talley_Floor Refinish_2016 (1)

Matt Talley_Floor Refinish_2016 (2)