Catching up and writing more

I have not been writing as much in the last few months as I should.  I have lots of excuses:

  1. House Remodel
  2. Hectic Work Schedule
  3. Jeep Rebuild
  4. A focus on film making and growing my YouTube presence
  5. Lawn and Garden care – seriously, this takes up a lot of my time.
  6. Too much TV and interwebs…
  7. Blah, Blah, Blah…

When you get to the base of it all though, the answer is that I have made time for all the other things that keep me sane/make me crazy except for writing.  I am renewing my focus and will be posting more words to go along with all of the pictures and video.

Let’s start with an update of current stuff:

The Attic

We are so close to being done with the attic conversion.  I have to put a couple of coats on the closet door and one on the stair railing and paint the 4 walls with a couple coats of the almond eggshell that my wife picked out.  The new hardwood flooring is being delivered today and it will be installed on Friday.  I will spend the weekend installing the stair treads and kickers/risers.  The receptacles, switches and lights are the last serious items that will go in before I touch-up a little paint here & there and I will be done and can focus on the basement.

Basement

We are 75% there.  All tiled laid, grout done and a functioning toilet!!  I need to finish the trim install, hang two doors and then paint EVERYTHING!  I am having a custom shower rod TIG welded together and will be building the double sink vanity.  I have to tack together & paint the medicine cabinet door and mirror frames as well.  After all is in, we will have a plumber come out for the sink install and shower hook up.  I don’t plumb.  I am afraid of flooding my house with water or sewage.  I leave that job to the professionals.

Main Level Bath

The tube tile surround is being replaced in two weeks with 6” subway and small hex tile.  The new bathroom mirror will be going in this week, and I have to have the exhaust fan switch rewired.

Jeep

I had a solid weekend working on the Jeep.  The taillights are installed, the winch is re-wired, mirrors installed, windshield back on with new gasket and PLENTY on extra silicone.  The upper KC spotlights are re-installed, and an issue with the front speakers if fixed.  I still need to paint and install the spare tire rack, as well as the CB, megaphone speaker, 2nd battery, air compressor, lower KC spot lights, passenger headlight, rub rails, whip antenna, headlight trim rings, and polish the rear tube bumper.

The current plan is to leave the top COMPLETELY off until fall when I re-install the soft top.  I need to finish the Hi-Lift Jack rebuild project, have the speedometer serviced, and replace my tube pads as well before the cold winter wind blows.

Garage

The shop of me dreams is packed full of everyone else’s crap right now.  It is all leaving by the last weekend in July if I have to put it all out on the road.  I need to finish wiring in my 40K lumens of LED lighting, a 50AMP plug, a couple of 220/30amp plugs and have an electrician connect all into my service panel.

House Exterior

  1. Downspout in back needs attention
  2. A section of soffit need looking at and possibly repaired
  3. I need to weld together the Juliet Balcony outside the dining room
  4. Weld railing for rear steps
  5. The new front windows need a little trim and paint
  6. Dining room window needs trim and paint
  7. The rear steps need to be painted
  8. The chimney needs to be repointed before fall/winter
  9. Basement railing needs to be installed
  10. Both front railings need to be sanded and repainted.
  11. External security alarm siren need to be installed
  12. A tiny bit of concrete need to be pouted
  13. Two security cameras need to be swapped out for the lower profile ones

The yard

Man, the front yard is good, a little weeding and bush trimming maybe.  The back yard though…  It is still a disaster, or at least ½ a disaster.  I want to fill 3-4 gabion baskets with all the rocks left over from a previous owner’s attempt at pond-scaping and make benches around out fire pit.  We will be adding a steel arbor from the garage to the patio this fall that I am welding up on-site.  The patio table and chairs will get a proper sanding and oiling this weekend and we need/want an umbrella of it this year.  I want to add a tool shed and additional firewood racks to the side yard.   And finally, the small yard next to the garage is my makeshift apiary and I would like to make that both permanent and presentable with some additional hives, gravel and flower plants in narrow garden boxes.

Health

Stamps-With-Foot, my mom, and the kids are good.  I am feeling all of my 40+ years lately though.  My hip is still painful a full year after reconstruction.  I may have torn the meniscus in my left knee, AND I have Fucking Tennis elbow from chopping firewood!!  Not being able to run and bike, coupled with my love of cookies, has left me with a classic “Dad-bod” and even my fat pants are tight right now.  Eating better now.  Trying to get between 7 and 10K steps in a day, having the knee looked at, and working on the elbow.  We are going to Hawaii in February and I need at least a 2-pac as there will be MANY shirtless days in and under the water, for my arm to feel better, and my knee and hip to be like 70%.

Other

Work is work, but I have really traveled at all this year and that is awesome!  Still wish I was building cabinets for a living, covered in man-glitter, smiling but that will have to wait.  I will be traveling to Arkansas this fall to see my daughter and her family.  My son will be here in Seattle for a couple of weeks this summer.  I hope to tour a couple of colleges with him.  My wife and I have a couple of road trips planned and I want to get out on my bike, kayak, and skate board a little (don’t tell my wife or knee Dr. about the board…) I have started recording for a monthly Podcast.  A friend conned me into it after a few years of asking.  I am going to just sit and tell stories without naming names or implicating myself in any illegal activities that are not past the statute of limitations.  As a reward for losing weight I will go ahead and finish out both of my tattooed arm sleeves and my wife and I are planning matching bee tattoos for our anniversary.  I still have not bought a boat or a motorcycle, so she will keep me for a while longer

Leave a Reply

Your email address will not be published. Required fields are marked *