Film Friday – BEES!!

My wife bought me a package bee hive box kit for Christmas last year, which reinforces the fact that I have a wife that is kind and considerate and pretty damn adorable.

Anywho, I thought that installing a new hive would be a terrific opportunity to document all the steps to install bees into a new hive box.  I went with a nuc hive instead of packaged bees and a new queen. That is for a later video. The whole process of bringing a new hive into the apiary also allowed me to show all the steps in prepping the pre-built hive boxes/parts and I was able to build and showcase a couple of steel hive stands that I have been thinking about and designing in my head for years.  I will also make a video on the design and build of the hive boxes and parts, but that will have to wait until this winter.

I love bees and I love being a beekeeper. The honey isn’t bad either…

Catching up and writing more

I have not been writing as much in the last few months as I should.  I have lots of excuses:

  1. House Remodel
  2. Hectic Work Schedule
  3. Jeep Rebuild
  4. A focus on film making and growing my YouTube presence
  5. Lawn and Garden care – seriously, this takes up a lot of my time.
  6. Too much TV and interwebs…
  7. Blah, Blah, Blah…

When you get to the base of it all though, the answer is that I have made time for all the other things that keep me sane/make me crazy except for writing.  I am renewing my focus and will be posting more words to go along with all of the pictures and video.

Let’s start with an update of current stuff:

The Attic

We are so close to being done with the attic conversion.  I have to put a couple of coats on the closet door and one on the stair railing and paint the 4 walls with a couple coats of the almond eggshell that my wife picked out.  The new hardwood flooring is being delivered today and it will be installed on Friday.  I will spend the weekend installing the stair treads and kickers/risers.  The receptacles, switches and lights are the last serious items that will go in before I touch-up a little paint here & there and I will be done and can focus on the basement.

Basement

We are 75% there.  All tiled laid, grout done and a functioning toilet!!  I need to finish the trim install, hang two doors and then paint EVERYTHING!  I am having a custom shower rod TIG welded together and will be building the double sink vanity.  I have to tack together & paint the medicine cabinet door and mirror frames as well.  After all is in, we will have a plumber come out for the sink install and shower hook up.  I don’t plumb.  I am afraid of flooding my house with water or sewage.  I leave that job to the professionals.

Main Level Bath

The tube tile surround is being replaced in two weeks with 6” subway and small hex tile.  The new bathroom mirror will be going in this week, and I have to have the exhaust fan switch rewired.

Jeep

I had a solid weekend working on the Jeep.  The taillights are installed, the winch is re-wired, mirrors installed, windshield back on with new gasket and PLENTY on extra silicone.  The upper KC spotlights are re-installed, and an issue with the front speakers if fixed.  I still need to paint and install the spare tire rack, as well as the CB, megaphone speaker, 2nd battery, air compressor, lower KC spot lights, passenger headlight, rub rails, whip antenna, headlight trim rings, and polish the rear tube bumper.

The current plan is to leave the top COMPLETELY off until fall when I re-install the soft top.  I need to finish the Hi-Lift Jack rebuild project, have the speedometer serviced, and replace my tube pads as well before the cold winter wind blows.

Garage

The shop of me dreams is packed full of everyone else’s crap right now.  It is all leaving by the last weekend in July if I have to put it all out on the road.  I need to finish wiring in my 40K lumens of LED lighting, a 50AMP plug, a couple of 220/30amp plugs and have an electrician connect all into my service panel.

House Exterior

  1. Downspout in back needs attention
  2. A section of soffit need looking at and possibly repaired
  3. I need to weld together the Juliet Balcony outside the dining room
  4. Weld railing for rear steps
  5. The new front windows need a little trim and paint
  6. Dining room window needs trim and paint
  7. The rear steps need to be painted
  8. The chimney needs to be repointed before fall/winter
  9. Basement railing needs to be installed
  10. Both front railings need to be sanded and repainted.
  11. External security alarm siren need to be installed
  12. A tiny bit of concrete need to be pouted
  13. Two security cameras need to be swapped out for the lower profile ones

The yard

Man, the front yard is good, a little weeding and bush trimming maybe.  The back yard though…  It is still a disaster, or at least ½ a disaster.  I want to fill 3-4 gabion baskets with all the rocks left over from a previous owner’s attempt at pond-scaping and make benches around out fire pit.  We will be adding a steel arbor from the garage to the patio this fall that I am welding up on-site.  The patio table and chairs will get a proper sanding and oiling this weekend and we need/want an umbrella of it this year.  I want to add a tool shed and additional firewood racks to the side yard.   And finally, the small yard next to the garage is my makeshift apiary and I would like to make that both permanent and presentable with some additional hives, gravel and flower plants in narrow garden boxes.

Health

Stamps-With-Foot, my mom, and the kids are good.  I am feeling all of my 40+ years lately though.  My hip is still painful a full year after reconstruction.  I may have torn the meniscus in my left knee, AND I have Fucking Tennis elbow from chopping firewood!!  Not being able to run and bike, coupled with my love of cookies, has left me with a classic “Dad-bod” and even my fat pants are tight right now.  Eating better now.  Trying to get between 7 and 10K steps in a day, having the knee looked at, and working on the elbow.  We are going to Hawaii in February and I need at least a 2-pac as there will be MANY shirtless days in and under the water, for my arm to feel better, and my knee and hip to be like 70%.

Other

Work is work, but I have really traveled at all this year and that is awesome!  Still wish I was building cabinets for a living, covered in man-glitter, smiling but that will have to wait.  I will be traveling to Arkansas this fall to see my daughter and her family.  My son will be here in Seattle for a couple of weeks this summer.  I hope to tour a couple of colleges with him.  My wife and I have a couple of road trips planned and I want to get out on my bike, kayak, and skate board a little (don’t tell my wife or knee Dr. about the board…) I have started recording for a monthly Podcast.  A friend conned me into it after a few years of asking.  I am going to just sit and tell stories without naming names or implicating myself in any illegal activities that are not past the statute of limitations.  As a reward for losing weight I will go ahead and finish out both of my tattooed arm sleeves and my wife and I are planning matching bee tattoos for our anniversary.  I still have not bought a boat or a motorcycle, so she will keep me for a while longer

This weekend was full. I really need to stop working on my days off.

Welding Cart experienced a failed wheel/axle combo
I said dirty words and decided to replace rather then rebuild
Also decided to upgrade – just a little.
Sourced new cart and used a 20% off Coupon
Assembled new Harbor Freight/General Tools MIG welding cart
Recorded a video of whole experiebce for YouTube channel
Wired in a couple plugs and lights in the attic.
Worked on linocut of our dog Brodie and of a mountain scene print for two letterpress projects.
Wove a 9”+ pine needle coiled basket – because I can.
Made like 6 Instagram posts
Played Ukulele for a bit.
Recorded a couple of riffs and a drum track
Started building a podcast tool for website – slow going
Made a run to the city dump with a trailer load of building material/construction waste.
Mowed and edged yard.
Worked on the washing machine
called it names until it worked
Spent an hour looking for new Jeep parts that disappeared in the garage.
Said more dirty words – there is a theme here…
Found the parts
Installed front blinkers and driver’s side head light.
Completely failed at installing LED tail lights.
Threw a little fit.
Asked questions and then ranted on the Internet forums.
Packet the LEDs back up, returned them, and ordered replacements with regular bulbs.
Sat in yard and drank some Rose’
slept late (8:30) on Sunday morning
Cleaned backyard a little
Took Mom to lunch
Celebrated Mother’s Day
Took mom to nursery for flowers and yarn shop for some skeins of alpaca wool.
Installed new fender flairs on the Jeep.
Installed new Jeep bumper and re-installed winch
HUGE pain and took forever
Two band-Aids with consumed.
Wore good cloths while wrenching.
Wife caught me with grease on shorts
She made wet-cat noise and I got in trouble…
Organized and hauled out all of the recycling from house and garage.
Drank wine in the front yard.
Drank some more wine.
Binged watched season 2 of Westworld to catch up.

Spring Has Sprung – 2018

With the official start of Spring – as determined by the fact that my wife was reading a book, enjoying the sunshine, and drinking wine in the yard – we had a busy weekend at La Maison Du Talley:

Moved all the power tools in the shop against the wall for temp storage duty
Ordered material for attic finish
Set up new iPhone (old one a brick!)
Checkout at Pratt to be able to independently use their fabrication shop.
Moved everyone else’s crap out of my basement and temporarily into the garage
Said dirty words about all the other people’s crap being stored in our home
Cleaned the basement completely out
Pruned the apple trees in the backyard
Restacked the firewood wood pile
Cleaned and prepped attic for floor installation
Published two YouTube videos
Set up new condenser microphone in home office/studio
Breakfast with my mom and wife
Went to the Moonshiners 36th Annual Jeep Swap Meet
Did not buy a new-to-me 1946 CJ-2A project Jeep
Stayed Married
Did not buy a motorcycle or boat at the swap meet
Stayed married – there is a theme…
DID buy an ARB on-board air compressor and a duel battery mount – and got a sweet deal!
Signed up for three classes at Pratt for this spring: Block printing, wood carving, and letterpress
Padded and protected the wood floor and built-ins in prep for attic finish
Cleaned the hot tub
Edged and mowed the front and back yard
Spread Weed&Feed on the back yard and parking strip
Re-seeded the front yard

President’s Day 2018

President’s Day is here and it is time to prune the fruit trees, roses, and lavender. Or at least that was my plan for yesterday. Instead, I spent WAY TOO MUCH time on Twitter – ranting about sensible gun laws and the current US administration. I also spent a couple of hours cleaning the house, washing dishes, working on 2 videos, walking the puppies, and working in the shop. So the entire day was not wasted on-line.

In the shop, I am building a Screen Printers Workbench for a local artist, Amy M. Douglas. She does some pretty amazing prints and oil/acrylic work. We are trading my time for art, so it is a win/win for both of us. Below are a couple of shots taken during the build and I will have a whole YouTube video about the build in a week or so.

 

 

 

 

 

 

 

I will spend an afternoon this coming weekend pruning, re-stacking firewood, and cleaning the yard – I see a dump run in my future.

3/4/2018 Update:

The bench is done and delivered.

2018 News Year’s Resolutions:

A year ago, to the day, I said that I would do a bunch of stuff in 2017.  I did OK, but not great. I could blame it on my old man hip, the surgery, or the recovery time, but mostly not getting stuff on the list done was all me. All my own laziness, stuborness, or my A+ skill level of procrastination. These are the promises I made to myself that I kept:

Take a pottery class
Take a Blacksmithing class at the Pratt
Read 1 book every 2 weeks – minimum
Play my uke, banjo, and guitar with others
Give lots of $$ to Heifer and MFS
Make movies and post: Adventure, craftsmanship, and family.
Make Stuff!!
Ride my skateboard because I am not too old or too fat
Road trip in WA more
Take my wife on vacation
Plant a spring garden
Fix up the front and back yards

The following is what I am committing myself to do in 2018:

  1. Organize my chaos in the shop and basement.
  2. Sell, donate, recycle, or throw away shit that I do not use.
  3. Use my planner and notebooks as tools not as something that I “have” to use.
  4. Eat my veggies.  Seriously.  Salads in my future.
  5. Take my desk at home back and make it a conducive writing space.
  6. Cut WAY back on sugar and carb intake!
  7. Lose weight – back to 175! and put on 5-7lbs of muscle
  8. Go to the gym 3-4 time a week – minimum.
  9. Box more at the gym and at home
  10. Write more: Blog posts, REAL letters, Thank you notes, fiction, and non-fiction
  11. Take more great pictures
  12. Fly my drones more
  13. Take at least a 45 minute lunch at least 4 days a week at work
  14. Show up to yoga at least once a week
  15. Take another pottery class
  16. Finish my CJ-7 Jeep restoration
  17. Look into getting back into the judo dojo
  18. Sign up and compete in the Gambler 500 car race
  19. Sign up for a letterpress class at SVC Downtown
  20. Take another blacksmithing class at The Pratt
  21. Read 1 book every 2 weeks!
  22. Learn how to play the mandolin and banjo better!
  23. Play my uke, banjo, and guitar with others
  24. Build a skin-on-frame canoe for two
  25. Road and mountain bike
  26. Take the puppies to Lincoln Park for a walk at least once a week
  27. Ride the living shit out of my Single -Speed
  28. Bike to work at least 5 times this year (12 miles each way)
  29. Volunteer more at the Center for Wooden Boats
  30. Pay off all credit cards
  31. Go sailing in Puget Sound
  32. Turn some amazing and useful stuff on my lathe
  33. Give lots of $$ to Heifer and MFS
  34. Make at least 1 movie a week for YouTube and post: Adventure and craftsmanship
  35. Monetize my YouTube account and increase my presence and standing in that community
  36. Lessen my Twitter and social media activity…
  37. See my kids and grandchildren more
  38. Be involved in politics more: financally and with a time commitment
  39. Work on my Genealogy database and organize all my info.
  40. Finish the house remodel –  even if I have to pay a contractor to do it (…shudder…)
  41. Finish the garage/shop/GROP build
  42. Make.More.Stuff!!
  43. Ride my snowboard and skateboard because I am not too old or too fat
  44. Road trip in WA and on West Coast more
  45. Have two hives of healthy, happy bees
  46. Kayak lots!
  47. See my friends more
  48. Take my wife on vacation
  49. Plant a spring garden and have a really bountiful fall harvest
  50. Have an awesome Griswald-like Christmas light display!

I am printing this list out and pasting copies in my notebook, work planner, in the shop, at my desk at work, on the fridge, and in the basement above my warranty voiding workbench.

Fall Harvest and Market visits – long & picture heavy post

It has snowed over the last three days, so I guess that our fall harvest season is officially over.

Our Garden this year was planted a bit late – like a month and a half, due to me having hip surgery and the complete rework of the back yard. Consequently, our sweet corn never fully ripened, but the hot weather and sunshine this summer made for great tomatoes, peppers, and squash. To add to our bounty: our grass is Ireland-green and we are set up great for next year 🙂

The yard – old and new:

 

 

 

 

We got real figs for the first time ever from a small fig tree on our south fence line. It has been in the ground for 5 years and this was the first year that it really produced fruit, which we enjoyed with breakfast. Our two cherry trees were not as productive as last year, but some of that had to do with the weeks-long battle we had each evening with the snails and slugs climbing the trees and the ants that came later.

 

 

 

 

The apple trees produced fairly heavily as well, though no thanks to an “arborist” that screwed up the pruning and set our yard on fire with an errant cigarette butt – seriously.

The apple trees:

 

 

 

 

Squash and Veggies:

 

 

 

 

 

 

 

 

 

 

 

The Lapin and Stella Cherries:

 

 

 

 

Stamps-With-Foot really came into her own this year with the flowers she planted and cultivated! The houses next door and across the street were for sale at the same time and we had a couple of people comment on our “beautiful” yard and our “amazing flowers.” It made me proud of her, and of the front yard for the first time in years.

A few of the flowers:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Next year my bride has spectacular plans for more tulips, lots of lilies, dahlias everywhere, more lavender, and other bee-attracting flowers. We will also plant the garden earlier, with starts that have been hot-housed, have a 3’X4′ plot of garlic, lots of carrots, parsnips, and some more roma tomatoes. We are going to bag the apples to keep the apple-moth at bay and can/bake/press/ferment them next fall. A row of blueberries will go on the south-side fence where the firewood used to be. Raspberries will go in in a sunny spot and I am builting in 2 more garden boxes (pending Stamps-With-Foots approval) along the garage. Until then, we are blessed with a year-round farmer’s market in our neighborhood. It is full of local fruit, veggies, pasta, bread, honey, berries, cheese, fish, and meat. The offerings are seasonal and we have gotten to know some of the folks that grow our food, which is awesome.

Scenes from the West Seattle market:

Garage sidewalk now poured with a side of cat-related drama

The sidewalk to the garage is finally poured – 8 weeks after I put the forms in…   To recap, it is 20’X4′ and 4″ deep.  I used 3500PSI with fiber added and lots of steel, because I hate cracking sidewalks. I paid a guy working on the house next door give me a hand with the wheel barrow concrete moving and to move-hold the other side of the scree board.  It took two hours from the minute the truck rolled up until I was cleaning up my tools and I saved >$1500 doing it myself, even with the cost of material, delivery and a couple of new tools.

I was super happy with the results when I went inside at 5:30. When I went back out to check on it at 9:30, the cat had walked up one side all the way to the garage, walked across, and back down the other side. I now have cat prints in my “perfect” sidewalk until the end of days…

I am not anthropomorphizing, she did it as a “Fuck You bald monkey!” because I would not let her in the house. It was too dry to re-float. This morning, to add insult, the hate-cat dropped a giant turd in the middle of the thing up by the garage door.  I said such dirty words!  This is the last straw!

Who would like an overweight white fluffy cat that is passive aggressive and shits on the things I love? I will throw in 2 bags of food, a carrier, shot records, box of band-aids, half eaten mouse, and 3 cat-nip impregnated toys. It is an awesome deal! Won’t last! Act now before someone else snatches her up!

Labor Day Weekend – 2017

I was at home for Labor Day weekend this year and spend the time working on the house and yard. I dug up a cubic yard+ of dirt where the garage walkway will be and then built concrete forms, added rebar, and welded wire for a 20′ X 4′ sidewalk pour next week.

 

 

 

 

I also took a couple of hours to rebuild a 10′ section of fence on our south side. A 40′ (12.2m) tree had grown through it from the neighbor’s yard. He let me cut it down a couple of weeks ago and rebuilding the fence was required.  Note: Stamps-With-Foot did not see me roped up, hanging in the harness, topping the tree, so I didn’t get in trouble for being a “stupid man” until later 🙂

Weekend Activities

Seattle is in early summer full bloom. The sun is out and the temperature is perfect!  These conditions led to a really good weekend:

Slept had friends stay with us Friday night and Saturday morning
Big yummy breakfast
Picked three big bowls of ripe Lapin cherries
Ate a lot of cherries
Went over to my mother’s house
Took care of house projects for her
Had a yummy dinner
Nice bottle of red wine was opened and mostly consumed
Read American Gods aloud with Stamps-With-Foot before bed

Matt Talley Farmer's Market 07-2017 (2)

Matt Talley Farmer's Market 07-2017 (1)

Matt Talley_Cherry Crop_2017

 

 

 

 

Brunch with Friends
Went to the Sunday farmer’s market
Bought cheese and honey!
Went to the garden store
Bought a bunch of flowers for the yard
Walked the puppies
Planted flowers
Scattered weed&feed in the 1/3 of the back yard that is void of Ireland-green grass
scattered and raked grass seed.
Murdered dandelions
Picked up a mountain of puppy-made landmines 🙁
Mowed the yard
Installed new tire cover on Jeep spare
Put Jeep on the car lift – also now refereed to as “The Jeep Sex Swing”
Changed oil and filter
Only 42 more Oil Changes and the lift pays for itself!! 🙂
Lubed the chassis
Checked and topped off all the fluids
Made happy noises
Had a Coke and smile afterward while sitting in the shade
Printed out GAINT ’84-’86 Jeep Maintenance Manual
Let my internal OCD monster out to play
Custom labels and tabbed separators were made…
Added folders with Maintenance Manuals to shelf in the garage
Watered the garden, yard, and newly seeded dirt patch
More reading
Sleep

Matt Talley Changing oil_07-2017 Jeep (2)

IMG_3759

Matt Talley Changing oil_07-2017 Jeep (1)

Matt Talley Jeep_07-2017 (1)

Matt Talley Garden 2017

Long Holiday Weekend and the Official Start of Summer in Seattle

Our 4th of July weekend went really well this year. To kick things off right, I found out on Friday afternoon before the weekend that I could have Monday July 3rd off. A surprise and unplanned FOUR DAY WEEKEND!!

The 40th Annual Seattle Wooden Boat Festival was being put on and I took a Lyft down to south Lake Union and the Center for Wooden Boats on Saturday morning and hung out till about 12:00. I have mixed feelings about the show/fest this year and will expound on those in a follow up post, but while there got to see some boats and talk shop with a kayak builder and sail-maker. Before leaving the house, Stamp-With-Foot made me promise not to buy a boat. I succeeded in that, but I did look at a cute little 16’ sailing skiff that made me feel fuzzy and a 22’ day/weekend sailor…

Matt Talley_Wooden Boat Fest_2017 (1) Matt Talley_Wooden Boat Fest_2017 (2) Matt Talley_Wooden Boat Fest_2017 (3) Matt Talley_Wooden Boat Fest_2017 (6) Matt Talley_Wooden Boat Fest_2017 (7)

 

 

 

 

 

 

 

 

I also saw Opus again – my favorite weekend boat/trailer sailor in the PNW. She is a Wee Seal MKII, designed by the noted Australian/Scotsman Iain Oughtred. Her owners weren’t there, but I still enjoyed seeing at such a sweet little boat. If Opus were for sale, I don’t think that the promise to my wife would have been kept…

Matt Talley_Wooden Boat Fest_2017 (4)

We went to a colleague’s early 4th of July BBQ on Saturday afternoon/evening (the 1st of July). It was down in Enumclaw and had an AMAZING view of Mt. Rainier from the deck and rest of the property. There was beer, laughter, wine, 4-wheelers, BBQ, and fine people. The fireworks started at dark and no one lost any fingers and nothing burned down, so a successful party.

Matt Talley_Mt Rainer_BBQ_2017)

Monday and Tuesday were spent in our yard, my shop, and the house fixing, building, moving stuff around. I hired some labor on Monday the 3rd and spent 8 hours cleaning the yard, moving bricks, pulling weeds, re-finishing the patio table, cleaning the hot tub, moving boulders, and making 2 runs to the dump. I swear the people at the city dump know me so well by now that I will be getting Christmas cards from them.

Matt Talley_Shop and Yard Projects07_2017 (1) Matt Talley_Shop and Yard Projects07_2017 (2) Matt Talley_Shop and Yard Projects07_2017 (3)

 

The yard came together about 9:00pm the night before our scheduled BBQ on the 4th. We had friends, family, co-workers, neighbors come over for charred meat, chips, dip, booze, desert, and laughter. The holiday was also my backyard’s coming out party. She was finally ready to join the world and everyone fawned over the green, luscious grass. It made me so proud! It was also the puppies first time being allowed in the backyard unsupervised. They rolled and sniffed and frolicked like I made the yard just for them. There were no fights (human or puppy), no one got sick, everyone left full, no grass was destroyed, no cuts or scrapes, no fires, nothing blown up, and we had some very tired happy puppies that night – so another successful party.

matt talley_07-04-2017_BBQ (1)

matt talley_07-04-2017_BBQ (2)

matt talley_07-04-2017_BBQ (3)

matt talley_07-04-2017_BBQ (4)
BBQ_2017 (1) BBQ_2017 (2)
More 2017 07-04-2017 BBQ (1)

More 2017 07-04-2017 BBQ (2)

More 2017 07-04-2017 BBQ (3)

My Week in Review

This past week has been a week of mish-mash happenings:

90-day Post-surgery hip appointment: Could have gone better.
Fruit tree pruning
I built a lid for the compost boxes
A rat didn’t like my lid and chewed through the side to get at the worms in the compost bin
I said dirty words
Mounted 7 up-cycled cabinets in the garage
Finished painting 80 liner feet of 1/4 round trim.
Sweep and cleaned GROP
Organized some stuff into new shelves and cabinets.
Finished painting the corner shelf doors – 5 total coats of fresh paint
Installed the hinges and hung the doors on wrong cabinets
Said dirty words
Re-hung doors on the correct cabinet.
Scratched paint
More dirty words
Touched up paint
Finished corner cabinet install
Did some Physical Therapy for my Old Man hip
Mowed and edged the yard
Read a book
Made a few Instagram and Twitter posts
Amazon sent me a new tool!
Flew drone one afternoon after J-O-B
Planted the boxwood shrubs
Bought garden starts at Nursery: tomatoes, corn, squash, zucchini, peppers,herbs, lettuce, etc…
50+ hours at my J-O-B, hustlin’ to keep us fed and the lights on
Watched about 2 hours of NetFlix
Gave away a bed in our home office
Had to delver it to new owner
Drank some French wine
Worked on cedar log garden table
Bought couch/guest bed for the office/TV room
Braved the gauntlet at IKEA – three hours to pick up a pre-ordered couch 🙁
IKEA gave me a $50 discount for the trouble
Had to source clear glass Victorian-style pull knobs for the corner cabinet doors
Spoke to both of my children for Father’s Day
Heart Happy
Planted summer garden
There was some coffee drinking and puppy snuggling
Took top off of Jeep for the first time in 1.5 years
Started Raining the second I took it out of the Garage
Made grumpy noises
Had coffee and listened to a bluegrass jam session at favorite coffee shop
Watched a movie
Was prolific on Twitter and Instagram
Murdered some dandelions
Rode around neighborhood on errands in topless Jeep when it stopped raining
Made happy noises
Sent some J-O-B e-mails from home
Started reading American Gods out loud with my awesome wife
Went to bed to start it all over again on Monday morning

Matt Talley_garden_Seattle_2017 (2)

Matt Talley_Corner Cabinet Rebuild_2017

Matt Talley_garden_Seattle_2017 (1)

Getting Stuff Done Over the Weekend

We had a really productive weekend around the house – so much so that I to take an old guy nap on Sunday. In no particular order:

Organized and cleaned up shop from Garage sale two weekends ago
Took 10 boxes of good stuff to Goodwill
Bought and brought home cabinets and wine racks from Habitat for Humanity in Tukwila
Sourced and purchased some additional boxwood shrubs and mulch for the yard
Mowed the new sod in the yard for the first time
Took the puppies for a walk
Date Night: Burgers and a late 3D showing of Wonder Woman.
Cleaned house
Spent 1.5 hours looking for either one of my orbital sanders
Said dirty words the whole time
Sanded Corner cabinet doors
Shocked the hot-tub with chemicals getting ready for water and filter change
ad a couple of nice glasses of French rosé in the sunshine.
Made lid from up-cycled ceder fence boards and used hardware for the compost bins
Hung two paintings
Organized dining room
mounted 6 stringed instruments in the hallway
Installed new toilet seat
Ran the chainsaw a bit
Made some woodchips and used as garden bed mulch
Picked up 4 huge rounds of cedar from a neighbor who has a tree cut down to split for kindling
Took out trash and recycling – there was a LOT of the latter
Met new neighbor
Another walk with the puppies
Made a trip to CostCo and dropped more $$ that we wanted to
Paid $12 for a used plywood miter saw station – SCORE!
Drank lots of coffee
Murdered some dandelions in the yard
Paid some bills
Wrote a couple “Thank You” notes
Read a little
Didn’t sleep enough

IMG_3440

IMG_3450

IMG_3454

IMG_3455

IMG_3460

VURB0422

 

Making the yard pretty for 2017

Our back yard has been a mess for over a year: Stacked with left over construction debris, seriously over-grown raised garden beds, unturned compost bins, blackberries along both fences, piles of landscaping stones, weeds, etc.… The front yard was presentable, but only just barely. 2016 was the year of house and garage construction and 2017 was meant to be the year that we focused on the yard. Surgery delayed that a bit and the state of the grounds at La Maison du Talley was getting embarrassing.

I had a couple of guys come out and take a look at our mess to see what it would cost to get it back in home-show worthy shape. I didn’t like either answer.  Without going into too much detail about the different bids, the low one was $3500 and the high was almost $5000. There was no way in Hell that the frugal DNA coursing through my veins, passed down from both the Talley and Webster lines, would biologically allow me to spend that kind of money on grass, mulch, and a few flowers.

After I was well on the mend and cleared by my physical therapist, I did some planning, logistic estimation, material cost math, and decided to do it myself with a bit of casual day labor.  I also decided that the mature ornamental cherry trees I wanted for the parking strip would have to wait, that I didn’t need to bring in topsoil and plant grass seed. I scaled back the dream a little bit, bought 86 rolls of sod, 19 bags of mulch, 8 bags of garden soil, some boxwood shrubs, 15 Spanish lavender plants, and let my sweet wife buy all the pretty flowers that her heart desired.

In two days, the front and back yards were transformed!  I hauled away 1600 pounds of yard waste, made one dump run for trash, one run full of recyclables, and we spent less than $1000.  We will spend the next few weeks watering and fussing over little details, but by July 4th, we should have Ireland-green grass, pretty flowers, healthy fruit trees and the BBQ grill roaring. Money and time well spent.

matt-talley_yard-redo_-may-2017-1 matt-talley_yard-redo_-may-2017-2matt-talley_yard-redo_-may-2017-3 matt-talley_yard-redo_-may-2017-7matt-talley_yard-redo_-may-2017-4matt-talley_yard-redo_-may-2017-5 matt-talley_yard-redo_-may-2017-15matt-talley_yard-redo_-may-2017-11matt-talley_yard-redo_-may-2017-6matt-talley_yard-redo_-may-2017-8 matt-talley_yard-redo_-may-2017-9 matt-talley_yard-redo_-may-2017-10matt-talley_yard-redo_-may-2017-12 matt-talley_yard-redo_-may-2017-13 matt-talley_yard-redo_-may-2017-14

Spring has Sprung!!

Holy Crap, it has been sunny and over 70F for two solid days here in Seattle for the first time in 6 months! Flowers and trees are blooming.  Mason, bumble, and honey bees are flying about.  My grass is green.  This all makes me sooo happy.  In a couple of weeks, we are taking a little referral bonus from my J-O-B and doing a front and back yard makeover to include a little fruit tree planting, grass for the back yard, and veggie garden.

matt-talley_2017_spring-garden-1 matt-talley_2017_spring-garden-2 matt-talley_2017_spring-garden-3 matt-talley_2017_spring-garden-4 matt-talley_2017_spring-garden-5 matt-talley_2017_spring-garden-6 matt-talley_2017_spring-garden-7

 

 

 

 

 

 

 

 

 

 

 

Footnote:  I cursed us all.  12 hours after I posted this, there was a huge thunderstorm in Seattle.  Lightning, buckets of rain, power outages…  Probably all my fault.

What I Want Thursday – April 13th, 2017

Below are the things that I really want and that are present for me today:

To unclutter my life: less superfluous stuff
For my hip to be 100% and to never have to use crutches again
A wish for Brodie to be well and 100% cancer free
More time with my children and family.
Sunshine!!
Summer BBQs and cold rosé in the back yard.
For the basement (mostly the bathroom) to be done.
Hand-written letters – on actual paper – from my kids, friends and family.
A warm, sunny beach vacation
For the US Political system not to be dysfunctional and a little/lot less crazy

Fall has arrived on my street

Outside of the house this weekend there were leaves littering the grass, there was a damp chill, clouds gathered, the sky was a light grey, and the smell of wood smoke was in the air. Fall is my favorite time of year.

Speaking of falling leaves…  Wwe have two paper-bark maple trees (Acer griseum) in our parking strip that I never particularly liked.  For 7 years they have been a little scraggly, are the first to shed the leaves in the fall and the last to leaf-out in the spring. It means that for 6+ months of the year I had dead looking stick trees in front of our house. I have wanted to replace them with ornamental cherries for 6.5 of those seven years, but have been hesitant to cut them because they were healthy and I couldn’t find anyone to take the trees, even after I offered to dig them up, hall them to their new home and assist with re-planting.

Well, it became apparent this spring that one of them is dying. I began plotting and had decided to take them both out this winter and plant cherries this spring. Then something weird happened – the one healthy tree started dropping seed pods – 1st time ever. A lot of them. I am used to seeing the single winged seeds helicoptering to the ground from other trees, but this one drops singles, doubles, triples, and quads. There are very cool and from the top almost look like arrow fetching.

Alright. The healthy one can stay and I have collected seeds to germinate and plant in some property with some oaks, vine maples, plums, pecan, and wall it seedlings I have collected in my travels.

Matt Talley_Fall 2016 (1) Matt Talley_Fall 2016 (2) Matt Talley_Fall 2016 (8) Matt Talley_Fall 2016 (7) Matt Talley_Fall 2016 (4) Matt Talley_Fall 2016 (5) Matt Talley_Fall 2016 (3) Matt Talley_Fall 2016 (6)

 

House Remodel Status September 2, 2016 – 7.5 months in

Here is the house/garage re-build/build status for the 1st part of September.

  1. The F-Bomb Garage has been painted – at least the outside walls.  I need to paint the trim and doors next.
  2. Repaired some major issues with the trim and siding on garage – real unhappy with my garage builder!
  3. Front yard is still green, but need to clean and re-seed the back yard.
  4. There oar only 2 rooms in the house that are complete and need no work at this point.  Stamps-With-Foot could be happier with me right now…
  5. The mounting brackets for the granite in the basement are done and I will install them this weekend.
  6. Our washing machine went out…  fuck.  The bearings finally gave up the ghost.  need to haul it out and put another in.
  7. No garage power yet.  Huge load of confusion between the City of Seattle and my electrician.  Maybe worked out now, but we will see.
  8. The yard is completely fenced in and the rear gate is installed.  just a couple of tweaks and then power wash and polyurethane coat.
  9. The living room corner cabinets are in place, but not painted or installed.
  10. We have a small roof leak – motherfvcker!!!  it is around the kitchen vent and from where the moss removal team got too eager with the power washer.  I will go up there this weekend and seal it.
  11. Got a huge bill from our plumber for work that they didn’t do before abandoning the job.  wanted to scan my ass into the 3D printer and send them a copy.  Called a lawyer instead.  we have a plan forward.

The yard is now secure for the puppies

I spent my evenings after work this week rebuilding 35’ of fence, connecting it to the corners of the new garage, and installing two gates using reclaimed boards and stringers from the original fence that I carefully tore down back in January.  I reused the screws and most of the hardware, but had to buy 7 new treated posts, 2160 lbs of Sakrete, 4 bolts and two 2x8x10s. Total cost was $160 and 14 hours of labor including the tear down and hole digging.

My neighbor has been INCREDIBLY patient with me, my mess, noise, and building debris.  When I rebuilt the fence on her side of the yard, I tore out some more of the existing, replaced two rotten posts and then leveled the tops of each section to make it look nicer.  There were a couple of solid posts left from the previous fence location – about 2′ from the new garage – that I just couldn’t chop down or pull out so, I leveled them up and built her a simple trellis for honey suckle or wisteria.  I also bought her a $50 Starbucks card as a small ‘Thank you!’.

The back gate and adjoining section is a nice mix of mostly reclaimed and reused hardware, boards, bits mixed with new posts and structural support. I did double up on the facing boards (set on both sides) for some additional privacy as our hot tub is right on the other side.  The gate itself used to be on the opposite side of the yard.  I had to trim it a bit to get it to hang plumb, and move some hardware around a little.  I will be adding an additional hinge in the middle for added support and some face boards on the outside as well, so it gives the same amount of privacy and so it matches the fence.   The whole thing then will get a power washing and a coat of polyurethane in the coming weeks.

 

Matt Talley Fence re-build 2016 (3)Matt Talley Fence re-build 2016 (2)Matt Talley Fence re-build 2016 (5) Matt Talley Fence re-build 2016 (6)

Matt Talley Fence re-build 2016 (1)

Building fences and pouring concrete

I need to tie the wooden fence back into the new structure so the dogs can roam in the back yard again. While backing up to unload concrete and posts for the fence, I barely tapped the corner of the garage with my trailer. Not a single scratch or dent or ding, but it made me say DIRTY words. I put my thunkin’ cap on and decided that if I did it once, I would do it again, and someone else would definitely smack the corner. A Bollard was in order. I went by Pacific Metals and picked up a 6’X5″X5/16″ wall hunk of square tubing and 4 sections of 3/8X10′ rebar.

I rented an auger to dig the needed 7 post holes and dropped in 1 more for the bollard. The fence post holes are 18-14″ deep, but the bollard hole is 38″ deep and after chipping away at it with a post hole digger, maybe 14-16″ in diameter with a bell-shaped bottom. I cut 3 of the rebars to 7’ and bent the three pieces into a fishhook shape, wire tying the tops together in 3 places. I then took the off cuts and bent them into a “U.”

I put the rebar in the hole, sitting on plastic rebar chairs and placed the post over them. I splayed out the “hook” sections and wire-tied the U-shaped pieced around the rebar and around the bollard. I then added another hoop around the original section and the tied hoop. Concrete was poured in and vibrated to get all the air and voids out. I filled the bollard with concrete and used a scrap section of rebar to agitate and pack down the concrete in the bollard.

I left 4” of the top of the square tubing free of concrete and dropped in a 6” lag bolt with to 3” sticking out of the wet concrete, but still in the tube. After the concrete dried and while I was setting some fence posts, I went back and finished off the top of the bollard with a bit more concrete. I will paint it red when I paint the doors to the garage. The thing won’t stop a tank, but it might save the corner of my garage from a moment of inattention…
matt talley Bollard detailMatt Talley_Garage 2016_089 Matt Talley_Garage 2016_090Matt Talley_Garage 2016_082Matt Talley_Garage 2016_084Matt Talley_Garage 2016_081 Matt Talley_Garage 2016_083Matt Talley_Garage 2016_085 Matt Talley_Garage 2016_086

What I Want Thursday – June 9th, 2016

Below are the things that I really want and that are present for me today:

For my interior painting to be 100% done in our house.
For my Garage to be 100% built and finished.
More time with my children and family.
Summer BBQs and cold rosé in the yard.
I want to stick to my diet and workout schedule and not fall off the wagon and back into the cookie/café Mocha/lethargic/big-belly/back-hurting abyss.
For the Attic and basement (mostly the bathroom) to be done.
Letters – written on actual paper – from my kids, friends and family.
8″ joiner/planer, 15″ Bandsaw, New Dust collection system for garage
Christopher Ward Quartz Trident with black rubber strap
For the US Political system not to be dysfunctional and a little/lot less crazy

Garage Build Update 5/10/16

My slab gets poured next Tuesday. All clear from the City for electric trench and slab forms. There were a few issues that I saw last week that needed to be adjusted: There was a rebar oops in the car lift footings that was a serious new-guy error, but instead of calling my contractor to bitch, if just fixed it. Sometimes you are only as good as your worst employee… I picked some rebar and a couple boxes of chairs, looped ties, and put a 12″OC grid down of 1/2′ rebar 3″ from the dirt in the footing hole on Friday evening after work.

I also lifted the existing rebar over the footing holes up with chairs so that it would all be the same level as the welded wire. Hanging it from the wire would force the wire down to the top of the visqueen, negating the use of the material in a large area. I took the extra chairs I had and added them to the welded wire field. I understand that it gets stomped down when they pour and walk the pour, but the trick for me is to limit the amount that stays down. It was $90.00 worth of material and a couple hours of my time and we can work it out as we move forward with the build. The minor details in the grand scheme.

Matt Talley_Garage Slab work_2016_2016_03 Matt Talley_Garage Slab work_2016_2016_02 Matt Talley_Garage Slab work_2016_2016_07 Matt Talley_Garage Slab work_2016_2016_06 Matt Talley_Garage Slab work_2016_2016_01

Productive weekend with Heavy Equipment – The Old Garage is Down!

Super Productive weekend!  The old garage came crashing down at about 9:00am on Saturday.  All it took was a little push with the forklift at the peak of the roof (I rented an extension boom forklift and a jack-hammer to assist with the garage and old slab destruction)  I didn’t take out any fences or cars, but one of our recycling cans took a beating.  Within 3 hours it was all loaded into a debris dumpster that I had dropped Friday morning.

The forklift was a little manky to start and keep running.  I would overload the hydraulics just a touch and instead of straining, it would die and take 3-5 minutes to restart.  The rental company was supposed to bring another one out, but we kept waiting and waiting and just making do as we whittled away at the slab and footing with the jackhammer and forks.  While the garage demo was a breeze, the slab was something else altogether.  It was super tough, full of quarter-sized aggregate, and 6 inches thick.  The footing was +16” deep.  I was impressed – I thought it was just some concrete poured over dirt like our basement slab.  Nope, this stuff was WAY overbuilt for the tiny carriage house.  I could had parked a tank on this thing and it would have been just fine.

With the slab about ¼ split and loaded into a second dumpster, the forklift finally died.  After a couple of calls, the rental company brought me a free 18000lb rated track-hoe with a bucket thumb and a pusher blade!!! That translated into an adult sized Tonka toy for my yard.  It was 5:30 or so by the time the track hoe was off loaded, so after demonstrating that I wouldn’t run it into a power pole, I parked it and work in the house a little.  I try to be a good neighbor and running heavy equipment while it is dinner time in a neighborhood does not endear you to others.

I was up and at it at 8:00 the next morning and the second piece of equipment was so sweet and made the tear out and load go so much faster than I expected! However, it is apparently not a normal occurrence to have a piece of heavy equipment spinning, grunting, working in my little neighborhood.  I one point I looked over and I have 5 neighbors standing in the shade of a neighbor’s garage, drinking beer and watching me demo.  When I took a potty break, one asked me if I could break something to make it more interesting.  Son of a…  They had gathered to watch me wreak havoc and as it did not ensue, were somewhat disappointed in me.

After five hours on the track hoe the garage, the whole slab, footings, three tree stumps, and four posts that were set in concrete were loaded and ready for transport.  All our water lines, fences, and overhead electrical lines were still intact so it was a successful second and final day of garage demo. My back yard is now a flat spot of dirt and is waiting for a new garage slab.

After playing in the yard for most of the day, Stamps-With-Foot and I went into Seattle and bought all the paint (Benjamin Moore only thank you very much) for the house interior and new fixtures and lights for the main floor bathroom and the laundry room sink.  I then cut and installed the new bathroom vanity on the main floor and did a little electrical work in the basement. It was then shower and night-night time, because I have a regular J-O-B to go to every morning.

Matt Talley_house remodel_131Matt Talley_Garage Build_2016 (22)Matt Talley_Garage Build_2016 (3)Matt Talley_Garage Build_2016 (1)
Matt Talley_Garage Build_2016 (21) Matt Talley_Garage Build_2016 (13) Matt Talley_Garage Build_2016 (17)Matt Talley_Garage Build_2016 (20)Matt Talley_Garage Build_2016 (15)Matt Talley_Garage Build_2016 (18) Matt Talley_Garage Build_2016 (14)Matt Talley_Garage Build_2016 (16)Matt Talley_Garage Build_2016 (19) Matt Talley_Garage Build_2016 (12) Matt Talley_Garage Build_2016 (10)Matt Talley_Garage Build_2016 (8) Matt Talley_Garage Build_2016 (4)

House Remodel Status – 4/12/16

Things are moving along with the house and garage, abet very slowly.

  1. I cut the dying vine maple out of the back yard.  Its loss made both my wife and I sad – we loved that tree.  Part of it I saved for fire wood and part I gave to a local bowl turned I know so he could make beautiful stuff out of the sections that were free of rot.
  2. The new 1″ water supply line is in.
  3. Our basement slab was cut for the new basement bathroom and drains
  4. Concrete floor re-poured.
  5. I have demo’ed part of the basement ceiling, the front bedroom closet and a huge spot in the dining room for the plumbing company to run PexA supply lines and vent pipe.
  6. Plumbing rough-in is going on today and we may have a functioning toilet and kitchen sink by 5:00pm tonight – maybe…
  7. We haven’t had water for a week and have been staying in an air B&B, which has gotten old and expensive.
  8. Basement bathroom framing is going in tomorrow.
  9. The new 1st floor bathroom vanity is done and in place, but the holes in the granite top for one of the facets are cut wrong – it has made me a little crazy…
  10. I have cleared all the stuff out of the way in the back yard and am ready for dumpster deliveries.  I am taking the old garage out this coming weekend.
  11. The attic is ready for new floor joists, but still waiting on the engineer’s report to decide what is going in and options for the space.  We had wanted a Master Suite up there, but are not sure if it can be done at this point.
  12. Our fireplace insert goes in tomorrow and the new fireplace tools are already there.
  13. The three windows for the garage and two for the house are on order and should be here next week.  I just have to find a place to store them.

Some pictures of the current status and the latest progress:

Matt Talley_house remodel_127Matt Talley_house remodel_126Matt Talley_house remodel_130Matt Talley_house remodel_125 Matt Talley_house remodel_128 Matt Talley_house remodel_129Matt Talley_house remodel_131 Matt Talley_house remodel_132

 

 

 

 

 

 

 

 

 

 

I haven’t had a day off in about three weeks – working my day job, making calls to contractors and supply companies at lunch and on the way to work/home, and working at the house at night and on weekends.  I have to work all this week getting ready for the garage demo and all weekend tearing it down.  It is all starting to take it toll on me.  I’ll get an evening off from remodel this week to attend my new advanced throwing (pottery) class, and will have a two evenings off next week while the drywall goes in, but will be back at it painting the entire weekend of the 23rd and every evening the rest of the week after.

My wife said a little something a few days ago that resonates: “Life is a journey an not the destination, but remodeling is all about the destination.  The journey sucks!” I swear if I had to make this decision again, I would have sold the house and bought a McMansion in Maple Valley or an updated mid-century rambler Bellevue and just moved right in in.  I have remodeled many homes in the past, but this one and the size/scope are both out of hand and way too ambitious for someone who has a day job.  When all is said and done, I do not want to touch a thing in or on the house for YEARS and would like to just enjoy home for a while, sit in the back yard and drink rosé in the summer sun with my wife.

 

Project built for my truck – the one I sold 2+ years ago…

So this post is a little bit delayed.  It has been sitting in my draft folder for almost three years.  It may be time to publish it…

My 2011 Nissan truck had a very cool really system for holding gear in the back of the truck: an extruded aluminum track along the side rails and two in the bottom of the bed.  They made sliding tie points for use on the rails that were great for some stuff, but I needed more to really strap a load down when hauling brush and debris to the dump.  I looked at buying more from Nissan, but they wanted >$200 for the set of 4.  No thank you!  I did what any engineer would do:  Designed my own and went into the machine shop and made a few prototypes out of aluminum scrap that was laying about.

I made one version with an offset bend for the side walls and the other with a 90 degree bend for use on the bed floor rails.  I might change the latter a little as I found that while a standard small ratchet strap or rope had no effect on it, if I used a large ratcheting load strap, I could bend it.

I also found that the rails were the exact same dimension as commercial uni-strut (standardized formed metal structural system used in electrical, plumbing and HVAC installations for structural support).  Parts are available at all the Big-Box home stores and I was able to pick up a bag of 10 threaded nut plates for ~$8.00 and 1/4″ hex-head bolts of various lengths for another $5.00.  The prototypes worked so well that I made more and with my hold down solution and the OEM tie points, I could haul anything I really wanted and make sure it was securely fastened:  Refrigerators, lumber, yard trimmings, fire wood, trash, you name it.

I added the side walls of a wooden shipping crate to my new truck bed system, bolted directly to the side rails using the uni-strut nut plates and then strapped over the whole load with 2″ straps.  I found the installation took me 15 minutes from start to finish and it made dump and material runs super simple.  It was even faster to remove and store in the garage so I didn’t drive around town like I worked for Sanford & Son.

Truck tie loops

Truck Tie Downs 2012-3 (2)

Truck Tie Downs 2012-3 (1)

Truck Tie Downs 2012-3 (3)

Truck Tie Downs 2012-3 (4)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I sold the truck in December of 2013, but I kept the OEM Nissan tie points as well as the ones I made.  I will use them on my next truck, or possibly my next trailer.  I will just install uni-strut on the sides and on the deck and I will make it that much more useful.

A Modern Wedding Arch Build

My Brother-in-law and his then fiancé decided early this year that they would visit us in France and while here have a little wedding… Stamps-With-Foot freaked out and turned on the ‘Big-Sister Action Mode’ setting on her internal processor. She quickly organized the shipping logistics, helped with transportation, found lodging for all, located a restaurant for the reception, sourced champagne and wine, etc… I had two jobs. 1. Make sure the yard was a perfect/green as possible. 2. The wedding arch. It was implied that fvcking up either would have dire consequences.

I sketched a bunch of ideas up in my notebook and talked to the bride a little about her ideas and wants over Skype and e-mail. I had planned on doing a big natural arch with the pruned limbs of 70-100 apple and plum trees, but my source burned the branches before I could get to them. I went with Plan B and drew up a modern interpretation of a classic white wedding arch. The bride said ‘go’ and it was on.

The arch is made from 4 meter (13.14’) X 1.25”X1.25” pine sticks that I sourced at the local lumber yard. They are sold for fencing trim and to cut foundation stakes from. I painted each with two coats of white paint and the bottom is held together with 10mm all-thread. The top is screwed one stick to another – everything is pre-drilled.

All was finished one day before the ceremony with the bride’s brother, cousin and sister helped out with the final painting (taking turns with the one roller) and installation. I really couldn’t finished in time without their help and support.

The bride and groom seemed very happy with the work and allowed me to even officiate their wedding. Honored does not even begin to describe my feelings about being included in this way. It was my first time getting to use my Ordained Minister credentials and I am SO adding wedding officiate to my resume! I will add some pictures and wedding details later – after the bride has had a chance to flood her social media accounts with pictures to her little heart’s content. Out-doing of being faster than the bride to share “her day” with the world would be bad juju…

As you can see from the pictures – I succeeded in Job 1 as well: Greenest yard in Toulouse:-)

IMG_6211

IMG_6262

IMG_6241

IMG_6196

IMG_6177

IMG_6172

IMG_6173

Wedding Arch September 2015

 

 

 

 

 

 

 

 

 

 

 

Updated Materials list and build instructions:

Material:
2 – 3/8”X3’ sections of “all-thread” (Home Depot or Lowes)
4 – 3/8” nuts
4 – 3/8” washers
40-45 – 1”X1”X12’ garden stakes/lathe
These can be substituted by ripping down 2X6 or 2×8 boards on a table saw. The finished stakes will be 1.5”X1”
100ish 1.5” deck screws
White paint with primer

Tools:
Two saw horses or cinder blocks
Paint brush
Hand saw or circle saw
4 – hand clamps
hammer
Two battery drills
Socket set
Combination wrench set
½” drill bit
1/8” Drill bit for pilot holes
Two helpers that have not started drinking or toking

Directions:
1. Check with the bride and get her sign off before any purchase of build is started.
2. After acquiring your stakes or making them, leave them bundled or tie them with packing string. If you removed them from the bundle before assemble, they are likely to warp.
3. Paint all available sides with thick coat of white paint
4. Put on second thick coat
a. You can let you helpers do this and it does not have to be a sober day project. It is better if they are altered. They will paint each other. It will happen.
5. Let paint dry overnight and out of the weather
6. Cut the bundle, retie the stakes with packing string with the unpainted side out.
7. Drill ½” hole in the bottoms of all the stakes about 1/2” from the bottom and on the centerline.
8. Measure up from the top of that hole ½ to 1” and cut what are now your spacer blocks off.
9. Drill ½” hole in the new bottoms of all the stakes about 1/2” from the bottom and on the centerline. Or you can drill both holes in all your stakes at the same time and cut between them.
10. Figure out the spacing of the “floor” of you arch by standing bride, groom and officiate up and seeing what that width is.
11. Add 18”-24” on each side. 10’ is great normally, but you decide.
12. Move all material and tools to the spot where the arch will be erected.
13. Mark out you width on a spate stake and place it in your desired location.
14. Double check with the bride if this is what she wants.
15. Cut your now fully painted bundles
16. Lay you first two sections and have them cross with 6-10” left at the top.
17. Clamp the bottoms to the stake, leaving the ½” hole uncovered.
18. Check the top again and if correct, drill a pilot hole in the top over-lapping stake.
a. This is super important! ALL screw holes must be pre drilled or you will split the wood.
b. This will piss the bride off and you will have a bad day.
19. Insert the all-tread into the bottom hole and put the washer on from the front (under), followed by the nut. Just tighten till the threads are covered on the end.
a. Have one of you sober helpers hold this all-thread until the 5th or 6th course of stakes are laid. If not, then you will split the stakes at the bottom and the bride will find out. You will get into trouble.
20. Slide a spacer block on after each stake is put on.
21. With your sober helpers holding the All-thread, lower another stake into place.
22. You will want to lower both ends at the same time or something will crack.
23. Move to the peak and space the second set.
a. I used a scrap bit of stake so that I would have 1” stakes and 1” spacing between, but if I had to do it again, I would use a 1+1/2” block (skinny part of a 2X4) as the spacer. It makes for a more dramatic fan when done.
24. Drill pilot hold and repeat step 17 – 22 until you have about ½” left on the end of the all thread.
25. Assembly is easier from inside the arch.
26. At some point your sober helpers will start looking for a cooler or a lighter. Do not let them wander off. Trust me.
27. Put on your next par of washers and nuts and hand tighten.
28. Use second set of hand clamps to put another stake across the bottom of the back of the arch. This and the one on front will be removed after you stand it up, but they will help keep everything ridged until it is up.
29. Cut four 18-24” sections of a spare stake and either have a still sober helper sharpen the end (the proper instruction is “like a Vampire stake…”) or you can cut it at an angle with a hand saw
30. Now with all available help stand the arch up, gently.
31. Have the bride sign off on the build and location. Not the bride’s mother. The lady in white herself. Seriously.
32. After you have the OK, then carefully insert a “vampire stake” between two stakes and hammer it into the ground until there is 2” sticking up above the side of the arch.
a. Don’t screw this up and hit the arch with the hammer. You might break something and then you will have to go into witness protection or move to Bulgaria.
33. Predrill a hole in the stake and arch and attach the two.
34. Do this on all four corners.
35. Remove the clamped on temporary bottom sections.
36. You may now release the helpers to become a chemically altered as they so desire.
37. Touch up any or the missing paint from the cords or the assembly.
38. Bask in glory of your accomplishment with a cold malted beverage.

Obsessing Over a Possible House Remodel & Letting My OCD Shine Bright

We are currently going through a make/buy decision concerning our house in Seattle.  Meaning, do we spend $200-$250K plus, months of time, and lots of sweat equity on updating our house, adding a garage/shop and dining room, and refitting the basement into an apartment for my mom.  Or, do we spend $5K getting the house ready to sell and find another house that has what  we want already done and complete.  Do we keep the house as a rental and build an entirely new one…?  We have met with our estate agent, a builder, a draftsman, an architect, a landscape company, a second builder, and now a third builder in our quest, but really are not any closer to making a decision.  As said before, Stamps-With-Foot and I are going over it all and trying to decide what is best for our finances, future possible family expansion, and quality of life.

I drew our lot and house just after we moved in and have spent more than a few hours modeling all our crap – to scale – and seeing how it would all fit in the possible expansion of our existing house with the new garage build.  Part of this on-going decision process is looking at all the possibilities and modifying the existing drawings into a “someday-maybe state”.  I have a touch of OCD…  If I am working on something or especially in the planning stages, I will drill WAY DOWN into the project.  Evidenced by the below images and the included timeline.

I have modeled sewing machines, yard tools, bikes, my 1986 Jeep, my wife’s Subaru WRX, hand tools, bikes, , machine tools, trees, bushes, furniture, lathes, saws, wiring diagrams, rugs, even our puppies… all to scale…  I may have a problem.

Overview copy

House elev copy

Main Floor copy

Basement ADU copy

Attic Master Suite copy

Garage Over View copy

Garage Interior Detail copy

Shop Interior copy

Attic Interior copy

Garage Garden Shed copy

Wiring detail copy

Time Line copy

Tooling Detail copy

Brodie Detail copy

Sand Box copy

The Bees in Our Back Garden – 2015

The lavender is in full bloom in our backyard.  Last year I counted five different types of bees that visited it during the late summer.  So far, I have counted seven different types, but I think one might be a type of yellow jacket.  I looked online, but it is inconclusive.  I went full-nerd and ordered a couple of books: Bees of the World by Mitchner and Bees of N. America (Princeton Guide).  I will take some more pictures and see how many types I can find every couple of weeks.  As a side note:  I often wonder given my nerdiness how I have both managed to procreate with the female of our species and how I have a wife that is so damn adorable…

Bees in the yard_France June_ 2015_ (36) Bees in the yard_France June_ 2015_ (34) Bees in the yard_France June_ 2015_ (30) Bees in the yard_France June_ 2015_ (21) Bees in the yard_France June_ 2015_ (15) Bees in the yard_France June_ 2015_ (13) Bees in the yard_France June_ 2015_ (10) Bees in the yard_France June_ 2015_ (7) Bees in the yard_France June_ 2015_ (5) Bees in the yard_France June_ 2015_ (4) Bees in the yard_France June_ 2015_ (2) Bees in the yard_France June_ 2015_ (1)