  1. I cut the dying vine maple out of the back yard.  Its loss made both my wife and I sad – we loved that tree.  Part of it I saved for fire wood and part I gave to a local bowl turned I know so he could make beautiful stuff out of the sections that were free of rot.
  2. The new 1″ water supply line is in.
  3. Our basement slab was cut for the new basement bathroom and drains
  4. Concrete floor re-poured.
  5. I have demo’ed part of the basement ceiling, the front bedroom closet and a huge spot in the dining room for the plumbing company to run PexA supply lines and vent pipe.
  6. Plumbing rough-in is going on today and we may have a functioning toilet and kitchen sink by 5:00pm tonight – maybe…
  7. We haven’t had water for a week and have been staying in an air B&B, which has gotten old and expensive.
  8. Basement bathroom framing is going in tomorrow.
  9. The new 1st floor bathroom vanity is done and in place, but the holes in the granite top for one of the facets are cut wrong – it has made me a little crazy…
  10. I have cleared all the stuff out of the way in the back yard and am ready for dumpster deliveries.  I am taking the old garage out this coming weekend.
  11. The attic is ready for new floor joists, but still waiting on the engineer’s report to decide what is going in and options for the space.  We had wanted a Master Suite up there, but are not sure if it can be done at this point.
  12. Our fireplace insert goes in tomorrow and the new fireplace tools are already there.
  13. The three windows for the garage and two for the house are on order and should be here next week.  I just have to find a place to store them.

Some pictures of the current status and the latest progress:

Matt Talley_house remodel_127Matt Talley_house remodel_126Matt Talley_house remodel_130Matt Talley_house remodel_125 Matt Talley_house remodel_128 Matt Talley_house remodel_129Matt Talley_house remodel_131 Matt Talley_house remodel_132

 

 

 

 

 

 

 

 

 

 

I haven’t had a day off in about three weeks – working my day job, making calls to contractors and supply companies at lunch and on the way to work/home, and working at the house at night and on weekends.  I have to work all this week getting ready for the garage demo and all weekend tearing it down.  It is all starting to take it toll on me.  I’ll get an evening off from remodel this week to attend my new advanced throwing (pottery) class, and will have a two evenings off next week while the drywall goes in, but will be back at it painting the entire weekend of the 23rd and every evening the rest of the week after.

My wife said a little something a few days ago that resonates: “Life is a journey an not the destination, but remodeling is all about the destination.  The journey sucks!” I swear if I had to make this decision again, I would have sold the house and bought a McMansion in Maple Valley or an updated mid-century rambler Bellevue and just moved right in in.  I have remodeled many homes in the past, but this one and the size/scope are both out of hand and way too ambitious for someone who has a day job.  When all is said and done, I do not want to touch a thing in or on the house for YEARS and would like to just enjoy home for a while, sit in the back yard and drink rosé in the summer sun with my wife.

 

Leave a Reply

Your email address will not be published. Required fields are marked *