House Painting – Attic Installment

I documented the process to paint the attic conversion that we have spent a couple of months working on. I am using a Graco airless spray rig that I bought a few years ago at a big box store. It has paid for itself MANY times over. This is part 1 of a 2 part video series. In this one, I sprayed the drywall primer and the trim paint. For paint I only use Benjamin Moore. It is my favorite to use and it wears amazing – not cheap though. Wear your mask and keep your lungs healthy!

Catching up and writing more

I have not been writing as much in the last few months as I should.  I have lots of excuses:

  1. House Remodel
  2. Hectic Work Schedule
  3. Jeep Rebuild
  4. A focus on film making and growing my YouTube presence
  5. Lawn and Garden care – seriously, this takes up a lot of my time.
  6. Too much TV and interwebs…
  7. Blah, Blah, Blah…

When you get to the base of it all though, the answer is that I have made time for all the other things that keep me sane/make me crazy except for writing.  I am renewing my focus and will be posting more words to go along with all of the pictures and video.

Let’s start with an update of current stuff:

The Attic

We are so close to being done with the attic conversion.  I have to put a couple of coats on the closet door and one on the stair railing and paint the 4 walls with a couple coats of the almond eggshell that my wife picked out.  The new hardwood flooring is being delivered today and it will be installed on Friday.  I will spend the weekend installing the stair treads and kickers/risers.  The receptacles, switches and lights are the last serious items that will go in before I touch-up a little paint here & there and I will be done and can focus on the basement.

Basement

We are 75% there.  All tiled laid, grout done and a functioning toilet!!  I need to finish the trim install, hang two doors and then paint EVERYTHING!  I am having a custom shower rod TIG welded together and will be building the double sink vanity.  I have to tack together & paint the medicine cabinet door and mirror frames as well.  After all is in, we will have a plumber come out for the sink install and shower hook up.  I don’t plumb.  I am afraid of flooding my house with water or sewage.  I leave that job to the professionals.

Main Level Bath

The tube tile surround is being replaced in two weeks with 6” subway and small hex tile.  The new bathroom mirror will be going in this week, and I have to have the exhaust fan switch rewired.

Jeep

I had a solid weekend working on the Jeep.  The taillights are installed, the winch is re-wired, mirrors installed, windshield back on with new gasket and PLENTY on extra silicone.  The upper KC spotlights are re-installed, and an issue with the front speakers if fixed.  I still need to paint and install the spare tire rack, as well as the CB, megaphone speaker, 2nd battery, air compressor, lower KC spot lights, passenger headlight, rub rails, whip antenna, headlight trim rings, and polish the rear tube bumper.

The current plan is to leave the top COMPLETELY off until fall when I re-install the soft top.  I need to finish the Hi-Lift Jack rebuild project, have the speedometer serviced, and replace my tube pads as well before the cold winter wind blows.

Garage

The shop of me dreams is packed full of everyone else’s crap right now.  It is all leaving by the last weekend in July if I have to put it all out on the road.  I need to finish wiring in my 40K lumens of LED lighting, a 50AMP plug, a couple of 220/30amp plugs and have an electrician connect all into my service panel.

House Exterior

  1. Downspout in back needs attention
  2. A section of soffit need looking at and possibly repaired
  3. I need to weld together the Juliet Balcony outside the dining room
  4. Weld railing for rear steps
  5. The new front windows need a little trim and paint
  6. Dining room window needs trim and paint
  7. The rear steps need to be painted
  8. The chimney needs to be repointed before fall/winter
  9. Basement railing needs to be installed
  10. Both front railings need to be sanded and repainted.
  11. External security alarm siren need to be installed
  12. A tiny bit of concrete need to be pouted
  13. Two security cameras need to be swapped out for the lower profile ones

The yard

Man, the front yard is good, a little weeding and bush trimming maybe.  The back yard though…  It is still a disaster, or at least ½ a disaster.  I want to fill 3-4 gabion baskets with all the rocks left over from a previous owner’s attempt at pond-scaping and make benches around out fire pit.  We will be adding a steel arbor from the garage to the patio this fall that I am welding up on-site.  The patio table and chairs will get a proper sanding and oiling this weekend and we need/want an umbrella of it this year.  I want to add a tool shed and additional firewood racks to the side yard.   And finally, the small yard next to the garage is my makeshift apiary and I would like to make that both permanent and presentable with some additional hives, gravel and flower plants in narrow garden boxes.

Health

Stamps-With-Foot, my mom, and the kids are good.  I am feeling all of my 40+ years lately though.  My hip is still painful a full year after reconstruction.  I may have torn the meniscus in my left knee, AND I have Fucking Tennis elbow from chopping firewood!!  Not being able to run and bike, coupled with my love of cookies, has left me with a classic “Dad-bod” and even my fat pants are tight right now.  Eating better now.  Trying to get between 7 and 10K steps in a day, having the knee looked at, and working on the elbow.  We are going to Hawaii in February and I need at least a 2-pac as there will be MANY shirtless days in and under the water, for my arm to feel better, and my knee and hip to be like 70%.

Other

Work is work, but I have really traveled at all this year and that is awesome!  Still wish I was building cabinets for a living, covered in man-glitter, smiling but that will have to wait.  I will be traveling to Arkansas this fall to see my daughter and her family.  My son will be here in Seattle for a couple of weeks this summer.  I hope to tour a couple of colleges with him.  My wife and I have a couple of road trips planned and I want to get out on my bike, kayak, and skate board a little (don’t tell my wife or knee Dr. about the board…) I have started recording for a monthly Podcast.  A friend conned me into it after a few years of asking.  I am going to just sit and tell stories without naming names or implicating myself in any illegal activities that are not past the statute of limitations.  As a reward for losing weight I will go ahead and finish out both of my tattooed arm sleeves and my wife and I are planning matching bee tattoos for our anniversary.  I still have not bought a boat or a motorcycle, so she will keep me for a while longer

Film Friday – Week 2 of the Attic Rebuild

I know… I have been posting a bunch of videos lately and not a lot of travel, Jeep, Puppy, garden, music, building, or other normal posts.  That will change with the coming of Spring and the completion of our attic remodel/rebuild.  In that vain, below is the short video documenting week 2 of the process.  It looks like it will be a 5-part series.

Spring Has Sprung – 2018

With the official start of Spring – as determined by the fact that my wife was reading a book, enjoying the sunshine, and drinking wine in the yard – we had a busy weekend at La Maison Du Talley:

Moved all the power tools in the shop against the wall for temp storage duty
Ordered material for attic finish
Set up new iPhone (old one a brick!)
Checkout at Pratt to be able to independently use their fabrication shop.
Moved everyone else’s crap out of my basement and temporarily into the garage
Said dirty words about all the other people’s crap being stored in our home
Cleaned the basement completely out
Pruned the apple trees in the backyard
Restacked the firewood wood pile
Cleaned and prepped attic for floor installation
Published two YouTube videos
Set up new condenser microphone in home office/studio
Breakfast with my mom and wife
Went to the Moonshiners 36th Annual Jeep Swap Meet
Did not buy a new-to-me 1946 CJ-2A project Jeep
Stayed Married
Did not buy a motorcycle or boat at the swap meet
Stayed married – there is a theme…
DID buy an ARB on-board air compressor and a duel battery mount – and got a sweet deal!
Signed up for three classes at Pratt for this spring: Block printing, wood carving, and letterpress
Padded and protected the wood floor and built-ins in prep for attic finish
Cleaned the hot tub
Edged and mowed the front and back yard
Spread Weed&Feed on the back yard and parking strip
Re-seeded the front yard

Film Friday – Home Garage Car Lift Details

The short film below is part on my on-going series on YouTube discussing and showing my garage/shop build process. It details my experience of having a 2-post Rotary Revolution RTP10 vehicle lift, why I went with the type/brand/style that I did, thoughts after using it for 9 months, and what I might do differently if I could go back in time.

As Always, likes are really appreciated on my YouTube Channel!

Weekend Activities

Seattle is in early summer full bloom. The sun is out and the temperature is perfect!  These conditions led to a really good weekend:

Slept had friends stay with us Friday night and Saturday morning
Big yummy breakfast
Picked three big bowls of ripe Lapin cherries
Ate a lot of cherries
Went over to my mother’s house
Took care of house projects for her
Had a yummy dinner
Nice bottle of red wine was opened and mostly consumed
Read American Gods aloud with Stamps-With-Foot before bed

Matt Talley Farmer's Market 07-2017 (2)

Matt Talley Farmer's Market 07-2017 (1)

Matt Talley_Cherry Crop_2017

 

 

 

 

Brunch with Friends
Went to the Sunday farmer’s market
Bought cheese and honey!
Went to the garden store
Bought a bunch of flowers for the yard
Walked the puppies
Planted flowers
Scattered weed&feed in the 1/3 of the back yard that is void of Ireland-green grass
scattered and raked grass seed.
Murdered dandelions
Picked up a mountain of puppy-made landmines 🙁
Mowed the yard
Installed new tire cover on Jeep spare
Put Jeep on the car lift – also now refereed to as “The Jeep Sex Swing”
Changed oil and filter
Only 42 more Oil Changes and the lift pays for itself!! 🙂
Lubed the chassis
Checked and topped off all the fluids
Made happy noises
Had a Coke and smile afterward while sitting in the shade
Printed out GAINT ’84-’86 Jeep Maintenance Manual
Let my internal OCD monster out to play
Custom labels and tabbed separators were made…
Added folders with Maintenance Manuals to shelf in the garage
Watered the garden, yard, and newly seeded dirt patch
More reading
Sleep

Matt Talley Changing oil_07-2017 Jeep (2)

IMG_3759

Matt Talley Changing oil_07-2017 Jeep (1)

Matt Talley Jeep_07-2017 (1)

Matt Talley Garden 2017

Film Friday – Corner Cabinet Up-Cycle/Rebuild

Way back in November of 2015, just after our return from living abroad for two years, I bought a set of hard used, little loved corner cabinets from a local salvage place. I have spent an hour and there installing, building trim, sanding, de-gunking, stripping old paint, priming, painting, and more painting. It has only taken 18 months, but they are now installed and look like they have been in our living room since the very first day.

Here is a slideshow/video tale of the steps taken in the project: What it was to what it became.

Making the yard pretty for 2017

Our back yard has been a mess for over a year: Stacked with left over construction debris, seriously over-grown raised garden beds, unturned compost bins, blackberries along both fences, piles of landscaping stones, weeds, etc.… The front yard was presentable, but only just barely. 2016 was the year of house and garage construction and 2017 was meant to be the year that we focused on the yard. Surgery delayed that a bit and the state of the grounds at La Maison du Talley was getting embarrassing.

I had a couple of guys come out and take a look at our mess to see what it would cost to get it back in home-show worthy shape. I didn’t like either answer.  Without going into too much detail about the different bids, the low one was $3500 and the high was almost $5000. There was no way in Hell that the frugal DNA coursing through my veins, passed down from both the Talley and Webster lines, would biologically allow me to spend that kind of money on grass, mulch, and a few flowers.

After I was well on the mend and cleared by my physical therapist, I did some planning, logistic estimation, material cost math, and decided to do it myself with a bit of casual day labor.  I also decided that the mature ornamental cherry trees I wanted for the parking strip would have to wait, that I didn’t need to bring in topsoil and plant grass seed. I scaled back the dream a little bit, bought 86 rolls of sod, 19 bags of mulch, 8 bags of garden soil, some boxwood shrubs, 15 Spanish lavender plants, and let my sweet wife buy all the pretty flowers that her heart desired.

In two days, the front and back yards were transformed!  I hauled away 1600 pounds of yard waste, made one dump run for trash, one run full of recyclables, and we spent less than $1000.  We will spend the next few weeks watering and fussing over little details, but by July 4th, we should have Ireland-green grass, pretty flowers, healthy fruit trees and the BBQ grill roaring. Money and time well spent.

matt-talley_yard-redo_-may-2017-1 matt-talley_yard-redo_-may-2017-2matt-talley_yard-redo_-may-2017-3 matt-talley_yard-redo_-may-2017-7matt-talley_yard-redo_-may-2017-4matt-talley_yard-redo_-may-2017-5 matt-talley_yard-redo_-may-2017-15matt-talley_yard-redo_-may-2017-11matt-talley_yard-redo_-may-2017-6matt-talley_yard-redo_-may-2017-8 matt-talley_yard-redo_-may-2017-9 matt-talley_yard-redo_-may-2017-10matt-talley_yard-redo_-may-2017-12 matt-talley_yard-redo_-may-2017-13 matt-talley_yard-redo_-may-2017-14

Film Friday – The Garage Build Film Part 1

I’ve had a number of people on various web forums, 6 sets of neighbors, a few friends, and a ton of folks in our area ask me some detailed questions about our garage build: size, foundation, demo, siding, wiring, roof, the car lift, etc…  As I have been making some videos while rehabbing the hip, I thought that I would turn my garage build into a three part YouTube series to answer most of the questions and have all of the information documented in one spot. The first one is done and up now and the second should be done in a few weeks.

This one and the next are from pictures taken during the build, with a voice over.  The third will be a mix of videos, stills and some drone shots.  I learn something every single time I put a video or slide show together, so my hope is they get more and more watchable.

I didn’t have the time or facilities to do it in this video, but I would like to use my own guitar, banjo, ukulele, fiddle, and mandolin picking for the soundtrack on future videos. My son, brother-in-law, and any friends I can con into it will also be future soundtrack contributors.

Spring has Sprung!!

Holy Crap, it has been sunny and over 70F for two solid days here in Seattle for the first time in 6 months! Flowers and trees are blooming.  Mason, bumble, and honey bees are flying about.  My grass is green.  This all makes me sooo happy.  In a couple of weeks, we are taking a little referral bonus from my J-O-B and doing a front and back yard makeover to include a little fruit tree planting, grass for the back yard, and veggie garden.

matt-talley_2017_spring-garden-1 matt-talley_2017_spring-garden-2 matt-talley_2017_spring-garden-3 matt-talley_2017_spring-garden-4 matt-talley_2017_spring-garden-5 matt-talley_2017_spring-garden-6 matt-talley_2017_spring-garden-7

 

 

 

 

 

 

 

 

 

 

 

Footnote:  I cursed us all.  12 hours after I posted this, there was a huge thunderstorm in Seattle.  Lightning, buckets of rain, power outages…  Probably all my fault.

What I Want Thursday – April 13th, 2017

Below are the things that I really want and that are present for me today:

To unclutter my life: less superfluous stuff
For my hip to be 100% and to never have to use crutches again
A wish for Brodie to be well and 100% cancer free
More time with my children and family.
Sunshine!!
Summer BBQs and cold rosé in the back yard.
For the basement (mostly the bathroom) to be done.
Hand-written letters – on actual paper – from my kids, friends and family.
A warm, sunny beach vacation
For the US Political system not to be dysfunctional and a little/lot less crazy

Working on my day off

The house remodel seems to never end…  I will be so glad to just be and live in our space at some point.  We are close, but there are still details left undone – enough that I am trying to concentrate on one room at a time.  My plan is to get each done in turn and then move on to the next.  I wasn’t as successful at that as I wanted to be this weekend as I bounced back and forth between the living room and our bedroom closet, but I did get a ton done.

I installed the upper shelves and corner shelf in the walk-in closet, laminating two layers of 3/4″ plywood for really strong support over a 54″ span and in the unsupported corner.  In addition to using copious amount of glue and screws, I attached the butted plywood edges together with wood biscuits – it is always a fine day when I get to crank up the biscuit joiner.

matt-talley_-notebook_11-2016-3 matt-talley_closet-build_11-2016-2 matt-talley_closet-build_11-2016-1 matt-talley_-notebook_11-2016-2

 

 

 

 

 

 

 

 

Almost a year ago, I sourced some corner shelves at one of the local architectural salvage places for less than $200 – far cheaper than what it would have taken me to build them.  They came out of a 1930-40’s house and were painted Christmas colors, but I knew that they would be perfect for our living room, which was stripped of its built-ins at some point in the last 88 years.  They have sat in storage and until this past week when I pulled them out and got some material together to permanently mount them.  Stamps-With-Foot helped me set them in place after I built sturdy bases.  Each of them cover a wall plug, so I am in the process of re-routing the receptacle using armored cable.  I also have to build in an air-return duct under one and that has taken some serious brain power to get right.  I will add trim this week and my wife and Mother-in-law will paint them cabinet white this weekend.

matt-talley_corner-builtin_11-2016-4 matt-talley_corner-builtin_11-2016-1 matt-talley_corner-builtin_11-2016-2 matt-talley_corner-builtin_11-2016-3 matt-talley_-notebook_11-2016-1

 

 

 

 

 

 

 

 

While I was at it, I punched out a rubber washer for a pot lid knob.  I made the knob a couple years ago out of some scrap cherry firewood after the original plastic one broke.  The original washer had corroded, so I made a new one and installed it.

matt-talley_new-washer-for-pan-lid

I also took a couple minutes to mount the red glass post topper on the back fence.  It was ordered (along with a spare) months ago and have meant to put it on every weekend since.  There is always an excuse for why I didn’t, so I marched right out first thing Saturday with a tube of clear silicone and finally just got it done.  It is the little victories that keep me going.

matt-talley_glass-post-top_11-16

 

A Walk-in Closet for My Wife

As part of the now 10 month rehab, remodel, rebuild of our house my wife wanted some space to hang her clothes and put her shoes and boots that was not an afterthought.  A place that, for once was not crammed or disorganized and was purpose built.  It was decided that we turn a small bedroom/office into a walk-in closet.

I sketched out a few ideas in my notebook and went over them with her.  She removed a large shoe rack and opted for more clothes bar space.  She also wanted a bunch of drawers to store smaller stuff in.  I initially drew everything with a built in dresser, but changed it a little and made room for a free-standing French dresser made in Revel in the 1930’s that we acquired while living in Toulouse. There is 27 feet of linear hanging space using iron pipe (no sag), 24+ shoe cubbies, shelves, drawers, storage, and two full length mirrors.

I spent most of this past weekend getting the flat panel section dividers up, installing the clothes bars and adding top shelves.  There are three areas that are made for off-season storage: coats in the summers/short sleeves in the winter.  For these spaces, I decided to line one wall each with cedar.  While some people might line the whole closet with cedar, I would advise against it unless you and your significant other wants to smell like a lumberjack constantly.  Too much and the smell, while pleasing for me, pervades everything.

I lined two of the three spaces this weekend and got to use my old-school hand miter saw. While manual, it is faster to use in the closet – no dragging in a stand and cords and creates a LOT less dust than my big power Bosch miter saw.

I still need to add shelving on one side, put up all of the upper and lower panel trim, fill my nail holes, sand, paint, and bring the dresser in, but the space is usable and has allowed us to unpack all the boxes that have sat in our bedroom full of clothes. I will take the clothes back out on the day that I sand and paint.

Here is the progress to this point:

Matt Talley_closet build_2016_01
Matt Talley_closet build_2016_05
Matt Talley_closet build_2016_04
Matt Talley_closet build_2016_02
Matt Talley_closet build_2016_03

House Remodel Status September 2, 2016 – 7.5 months in

Here is the house/garage re-build/build status for the 1st part of September.

  1. The F-Bomb Garage has been painted – at least the outside walls.  I need to paint the trim and doors next.
  2. Repaired some major issues with the trim and siding on garage – real unhappy with my garage builder!
  3. Front yard is still green, but need to clean and re-seed the back yard.
  4. There oar only 2 rooms in the house that are complete and need no work at this point.  Stamps-With-Foot could be happier with me right now…
  5. The mounting brackets for the granite in the basement are done and I will install them this weekend.
  6. Our washing machine went out…  fuck.  The bearings finally gave up the ghost.  need to haul it out and put another in.
  7. No garage power yet.  Huge load of confusion between the City of Seattle and my electrician.  Maybe worked out now, but we will see.
  8. The yard is completely fenced in and the rear gate is installed.  just a couple of tweaks and then power wash and polyurethane coat.
  9. The living room corner cabinets are in place, but not painted or installed.
  10. We have a small roof leak – motherfvcker!!!  it is around the kitchen vent and from where the moss removal team got too eager with the power washer.  I will go up there this weekend and seal it.
  11. Got a huge bill from our plumber for work that they didn’t do before abandoning the job.  wanted to scan my ass into the 3D printer and send them a copy.  Called a lawyer instead.  we have a plan forward.

Not so short contractor rant

We are so close to being done with the garage and the house (yard is still a disaster, which will have to wait ‘til next year, but the stress of dealing with crappy, disorganized, and/or no show contractors throughout this process has been and is so frustrating.  This is not a post to rail on all contractors or even all of our contractors…

We had same great ones:

  1. Maranatha Hardwood Floors showed up on time for the quote. The owner was personable and the quote was reasonable.  They showed up on time, did a beautiful job, listened to a specific request from my wife, there were no extra charges, cleaned up after themselves, and our floor looks great.
  2. RCS Fire Place was A-1: On time, good pricing, no add-on charges, etc…
  3. After an initial sales rep flub, Greenwood Heating & Air did a nice job on our heat pump. Very professional installers.  No complaints.
  4. Vehicle Equipment Solutions was awesome on the lift order and install. I couldn’t be happier with their work.
  5. Our Drywall guys were top notch.  Very professional, great price, showed up when they were supposed to and finished right on time.
  6. The carpet guys that did our bedroom were fast, professional, and did a nice job.
  7. I had some custom wrought iron brackets made and the blacksmith listen to our wants and delivered a beautiful product.
  8. Pacific RIM equipment rental was great in supplying heavy equipment for the garage tear out and site prep. When there was a breakdown, they delivered a new machine and I wasn’t charged for any gas use for the entire weekend.
  9. Bryan at Squak Box was a rock star when it came time to haul out the debris from the old garage and all the old concrete. On time, no hidden costs, dropped the containers perfectly.  Couldn’t ask for more.

And the not so great:

My garage contractor has now quit.  There is little I can do at this point besides shake my head in wonder and disgust.  It has been a bumpy road from almost the start, but I figured that with a little bit of work it would all be OK.  A bit of work turned into a part time job and time spent on the garage was time not spent on the house and that made Stamps-With-Foot grumble.  In addition to the garage tear down and the site preparation that had to be done (40+ hours of my time and ~$3000.  I had to do 4-5 hours of slab/rebar prep when the contractor’s guy messed up, then had to ask for poly burlap to cure the slab, apparently not standard.  I ended up keeping the slab wet for the entire 10-day cure (to limit cracking and allow it to fully harden, then apply the concrete densifier after my normal workday and the end of the cure process.

Installation of fire blocking isn’t required per code in Seattle for a wall less than 10’, but it is the right thing to do.  It was out of scope for the contractor and an additional cost, so The Ruminator and I ended up doing it while he was here on summer vacation.  I had to install two forgotten kicker studs, tighten missed/forgotten anchor bolt nuts, added nails to the hurricane straps, and had to go over punch list items twice before they were addressed.

The windows and door trim were installed incorrectly – I could see daylight in the corners of the windows and I asked that they be re-installed.  When that was being done, my siding got cracked.  I also found that instead of every 16” per code, the siding was nailed every 4’ in some locations.  I called and the foreman came out.  He addressed some issues but caused others.  I then called the owner and he came out.  He agreed with every point I had.  They crew came back and while some items were fixed, others were not and new problems popped up.  I let the owner know and this was his response:

“Unfortunately we’ve succeeded in messing up again.  ____ had no excuse for why he didn’t read my email, about taking the siding out from the bottom of the windows, and what they were thinking with the screws into the bottom of the fascia’s.  If they’d pre-drilled the holes it would have worked and been clean.

I don’t have anyone else in my employee who I could send down to make any corrections, and I don’t think you would trust anyone I sent to do any more work.  What I’d like to offer is to forego our final payment and let  you clean up any items by your self.  I don’t like doing this, I really want to get the job done for  you but we’ve already had three try’s.  I know you might not be as happy as you should be but I want to at least make you satisfied with _____________.”

I am not happy and while I agree that I don’t trust his guys to come back a third time, the keeping of a few hundred bucks does not make it all better.  Now, I either have to find and pay someone else or do it myself.  Frustrating.

I have looked at this.  Am I just an asshole?  Am I too picky or do I expect too much?  I really have looked at this hard and yes, I can be an asshole,  but not in this and not with a single contractor or tradesman on my site.  We provided lunches, Gator-aid, and beer for all the guys working, I talked to every contractor that has been on our property like I would want to be spoken to, If I wanted something different or changed, I addressed it right then by ASKING and wasn’t the least bit of a shit about it.  I cleaned up the job site in the afternoons after I got off work to save them all time and effort.

Is needing someone to stick to a schedule, be on time, and not halfway do something too particular?  I don’t think so.  Is asking that a contractor meet minimum code requirements, pull permits, and do the job they agreed to for the agreed to price crazy?  apparently so.

Other issues:

In addition to the plumbing circus that we had in the spring, we had a carpentry crew that abandoned us for a job where the other customer was screaming louder.  They left tools, work unfinished, material, you name it.   My electrician has been a little flakey – uncashed checks, no shows, showing up unannounced and unscheduled, really hard to get a hold of, etc., but at least this one hasn’t broken into our house while we were gone…  I have had 3 contractors come out for quotes on our basement bathroom tile and never heard from two of them again.  The third guy finally called me back and said the job was just way too small and “not worth the time it would take to set up his wet-saw.”

I get it, all the contractors in Seattle are busier than a puppy with two peckers.  That means that 1. they can be super picky, 2. charge what they want, 3. if they fuck up, no worries, there are three other jobs waiting.

 

 

 

 

 

 

The F-Bomb Garage completion is getting closer!

I was out of town this past week on a work trip to merry ol’ England. I came home to a sweet surprise: I have a new 10,000lb two-post lift installed in the F-Bomb Garage. I got a decent deal on a . Went with the Rotary Revolution RPT10 because there is a local dealer, local support, I got a decent deal on the lift+install, and some experience that some friends and colleagues have had with this and other lifts.

We are getting closer to finally building some stuff inside/voiding warranties/modifying the jeep.  My contractor had a foreman out last week to deal with the framing punch-list items: a couple of anchor bolts, some trim, loose siding, a funky corner, and I had him re-install my three windows with the proper flashing tape – I could see light in all the corners.  A leaky window after I have stressed the importance of proper installation and showed them what I needed twice would throw me into fits.  He also swapped the door trim, but not everything on the list got done and now there is more stuff that needs attention.  I have the contractor stopping by to go over it all tonight.  Very frustrating to spend this sort of cash and to deal with all the little things over and over.

The electrician is 3 weeks out – everyone is building and remodeling in Seattle and contractors are super swamped, so I am going to concentrate on the outside in the mean time: Paint and gutters as soon as the siding issues are dealt with.

Matt Talley_Lift_2

Matt Talley_Garage_build_2016_78

Matt Talley_Garage_build_2016_77

Matt Talley_Garage_build_2016_75

House Status and Plumbing Woes

We are making progress, abet slowly:

  1. My father-in-law came in this weekend and painted our bathroom and the trim.
  2. I have a new granite vanity top installed – one with the facets centered on the sink.
  3. New reproduction 1920’s glass handles are installed in the vanity.  I is not gud counter.  I bad at numbers.  Didn’t have enough – one short.  Store now sold out.  Amazon to the rescue.
  4. The drywall should completely done and sanded as of today.  The new arches are super sexy!
  5. I modified the kitchen knife rack to fit the new ceramic sharpener.  The original was broken by the asshat moving company and Kyocera doesn’t make that size anymore, so I had to drill out its assigned slot.  The replacement knives (also the movers…) are now in as well.
  6. Primer will go on the fresh walls tonight and tomorrow night.
  7. I have patched the hole in the tub surround and am waiting for the thin-set mortar to dry so that I can lay the tile.
  8. The new fireplace insert is in and fantastic.  I will do the new surround and mantel after the floors are refinished and as I am trimming out the Dining room Ceiling
  9. I met with the garage foundation crew on Monday to go over all the details and they start the ground work today.  I am almost giddy with excitement.
  10. My new dutch doors are ready and I will pick them up Friday
  11. The finish carpentry trim-out starts next Monday.
  12.  I learned yesterday afternoon that no plumbing permit was pulled and that we might have to demo the concrete in the basement – the new concrete – and the newly laid supply line so that the county inspector can view the pipes.  I am super unhappy and will update as I know more.
  13. We are now 4 weeks without a shower or bathroom sinks at the house. I have been a decent human being and fairly understanding up to this point with our plumbing company (big company, one of the oldest in Seattle). I am afraid that they have mistaken nice for weak and unwilling to have a confrontation.  That was a miscalculation.  Please refer to the Capone quote concerning kindness…
  14. My wife is still medium chipper and hasn’t threatened to leave me yet over the lack of a shower or all the dust, so that is something.
  15. The lavender out front is in bloom and the bees are back, so not all is lost.

Matt Talley_House remodel_2016_07 Matt Talley_House remodel_2016_11 Matt Talley_House remodel_2016_10Matt Talley_House remodel_2016_09Matt Talley_House remodel_2016_12Matt Talley_House remodel_2016_08Matt Talley_House remodel_2016_13Matt Talley_House remodel_2016_14Matt Talley_Lavender in yard_2016_01

House Remodel Update – Mid-March 2016

All of the demolition work is now done and the rebuild has started. Electrical is moving along, the City inspector signed off on the new HVAC (there is a permit inspection for the basement still to come), and all of the rough work on the main floor is complete. The once scary attic is now clean and waiting for a reinforced floor and new spray foam insulation.  Some of the trim in the dining room and kitchen is done, specifically the cove/crown on the cabinets.  All the doors are now hung, and the Wainscoting in the new dining room is 90% up. I need to finish up around the double door and fill and prime/paint.

Matt Talley_house Remodel_016

Matt Talley_house Remodel_017

Matt Talley_house Remodel_018

Matt Talley_house Remodel_020

Matt Talley_house Remodel_022

Matt Talley_House Remodel_030

Matt Talley_House Remodel_032

Matt Talley_House Remodel_033

Matt Talley_House Remodel_034

Matt Talley_House Remodel_035

Matt Talley_House Remodel_039

Matt Talley_Attic Remodel 2016_006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Next steps:
Plumbing
Basement bathroom
Finish electrical
Camera system
New window install
Coffered Ceiling in Dining Room
Hutch built in the dining room vestibule
New security system (Hate ADT)
New drywall main floor
New main bathroom vanity
New Kitchen floor (both decision and install)
Finish trim out
balcony install
Attic floor install – pending engineering review
Attic and wine cave insulation – yes, we are that bourgeoisie
New basement door and back door – both will be dutch doors
Main floor hardwood floor refinish
Basement drywall finish and paint – pending city inspection
New carpet in Basement
Garage build

House Remodel Update – February 2016

Making lemonade out of lemons…  I have mentioned an issue we found with our house and how we had to tear out walls to fix things.  Well, we took the opportunity to do some long wanted remodeling since the place was already torn apart.  We are insulating the exterior walls, re-plumbing the whole house, re-wiring to remove the old knob&tube still left in the attic, remaking the Stairs of Doom into something that people won’t fall down, tearing out the 30% efficient oil heater and adding a heat-pump, adding attic access, making a dining room, putting in arched doorways, bringing in more light, and adding lots of period-appropriate detail.  Below are some of our in-progress updates after three weeks of demo, with the “WAS” pictures first.

The stairwell and chimney tear out – before and during:

Matt Talley_Remodel_2016_001

Matt Talley_house remodel_2016 (11)

Matt Talley_house remodel_2016 (4)

Matt Talley_house remodel_2016 (6)

Matt Talley_house remodel_2016 (8)

Talley_house remodel_008Talley_house remodel_007Talley_house remodel_002

Talley_house remodel_003

Talley_house remodel_005

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The 1942 oil heater removal – before and during:

Matt Talley_Remodel_2016_002

Matt Talley_house remodel_2016 (3)

Talley_house remodel_004

 

 

 

 

The back-bedroom transformation into the dining room – before and during:

Matt Talley_Remodel_2016_003

Matt Talley_ house remodel_2016_001

Matt Talley_ house remodel_2016_002

Matt Talley_house remodel_2016 (2)

Matt Talley_house remodel_2016 (12)

 

 

 

 

 

 

 

The Attic – Before and during:

Matt Talley_Remodel_2016_004

Matt Talley_house remodel_2016 (7)

Matt Talley_house remodel_2016 (9)

Matt Talley_house remodel_2016 (10)

What I Want Thursday – Febuary 2016 Edition

Below are the things that I really want and that are present for me today:

More time with my children and family.
I want to stick to my diet and workout schedule and not fall off the wagon and back into the cookie/café Mocha/lethargic/big-belly/back-hurting abyss.
For the house remodel to be done
For my Garage build to be 100% and my new lift and tools installed and waiting for me.
Growler or two from West Seattle Brewing Co.
Letters – written on actual paper – from my kids.
A longboard skateboard
I could stand a new Kindle
A handsome tweed vest – or two
Brown Redwing Engineer’s boots
Huge antique pattern lathe found in a barn or a PM4224 with all the add-ons.
A pair of 1/2 round and a pair of Snipe Bill molding planes
A 1.75 – 3Hp SawStop Table Saw
One fine compound sliding miter saw
>8″ joiner/planer
A Grizzly G0752 Benchtop Lathe and G0801 Vertical Mill

Mid-month Update – Jan 2016

We have a LOT going on around La Maison du Talley and I have had 12 texts and e-mails about different stuff, so here is an overall update:

  1. We have our garage permit!!  I did a victory dance when our contractor sent me the mail.
  2. Building is on hold for a bit though as we have an issue inside the house that has to be dealt with before ANYTHING else.  Looks like it will not be cheap, but it has to happen right now.
  3. The old garage will be clear as of tomorrow and ready for demo, but that has to wait on the house as well.  Dammit!
  4. Still don’t have an HVAC contractor for the house – 2 that can’t do the work until summer, one that won’t send a written quote, one in the running, one contractor that sent me a quote that is for almost the same amount as the entire garage build & double the next closest bid, and another that I am on the fence about – mixed reviews, but good pricing.
  5. We finally had the new hot tub cover delivered and it is fantastic: light, ridged, perfect color…  Stamps-With-Foot is stoked.
  6. Finished the movie (shot with a GoPro) about our cross country jeep trip, but YouTube blocked the audio because I used a snip-it of Hendrix’s Voodoo Chile, which is uber verboten.  I will edit it for sound this weekend – maybe some rockin’ blues and re-post with links.
  7. Sticking to my workout schedule and wrist is 90%+ healed from the break.  My gym has hung heavy bags and I want to start smackin’ them, but will wait for wrist to heal 100%.
  8. Still chubby 🙁
  9. Jeep is running great.  Front window seal is leaking a touch and need to unstick the odometer.  She will be getting an oil change and fluid check this weekend.
  10. The puppies/monsters are good, but they long for the Toulousian sunshine.
  11. I made three more bowls in pottery class and have decided to make matching food and water bowls for the puppies as my first project.
  12. My J-O-B is great.
  13. Really happy to be back in Seattle.
  14. Our furniture won’t be here until February.  Customs issues…
  15. Nana is good, her Seahawks are good. She wrangled 90 days of free HBO from Comcast, so she is happy.
  16. Stamps-With-Foot is happy to be going back to work.
  17. Looking forward to Date Night with my wife tonight at an awesome hole-in-wall Greek place in West Seattle.

Getting a new garage in 2016!!!

Woohoo!!  It looks like we are a go for a new garage and some needed updates to our heat, plumbing, and wiring at the house.  I am meeting our builder this weekend and passing him a check (two checks actually, one is for the City of Seattle permit office…) and I will have a real garage and wood-shop by spring.  I will have room for a big lathe, cabinet saws, wood storage , my joiners workbench, room to assemble projects/furniture, a real dust collection system, and all my planes/saws/chisels/hand tools on one side.  On the other side of the shop will be a mini-machine/fabrication shop with a two post lift, lathe, end mill, welder, mobile paint booth, and work table…

I cannot tell you how stoked I am!  Seriously, I am all giddy about it.  I plan to make cool stuff, descend into super-nerdy, and will be voiding the shit out of warranties!

Here are the prelim drawings that are being submitted and a lay out of the shop floor.

Garage floor 3 Garage Floor 1 copy Garage floor 2 copy

Update:

Drawings sent to the city. Cross your fingers and pray with me that Planning is having a good day/week/month and these babies get a stamp.

image

image

Back in Seattle! Let the projects begin!!

After two days of flying with a couple of heavily sedated French Bulldogs, we made it back to Seattle just in time for a home cooked Thanksgiving dinner. We are so glad to be back in our little house! The now sober puppies have staked their claim in our yard, we went to a few of our favorite neighborhood shops and *gasp* went shopping at Target on a SUNDAY *second gasp*!! In France, shopping on Sunday is a mythical creature that is spoken of in whispers. We miss Toulouse and our friends there already, but it is nice that things are sooo easy here.

The cold, rain, and ice was here to greet us, so in the interest of keeping Stamps-With-Foot happy, my first duty was to spend about 6 hours raising our hot tub from its long 2-year sleep. I cleaned it out, rinsed it twice, scrubbed it, filled it half way and ran the pumps, drained it, scrummed it all down again and then filled it to the top. They pump and heater fired right up and so far they are no leaks, but I will kaap a watch out for a while yet. It took about 4 hours for the water to go from 47 to 104 degrees and the temp has held steady.

We use BaquaSpa instead of Chlorine, so I loaded the tub up with a shock treatment after the it had come up to temp and had been circulating for 24 hours. I waited a few hours before taking a water sample into the local spa shop for testing. All good: just needed a little Oxidizer and to increase in the calcium. Wife happy – she sat in the tub yesterday for about an hour like a proper Japanese snow monkey.

I also just “happened” to stop in at Second Use and picked up a couple of painted fir corner cabinets that I have been eye-balling from afar. They will go in our living-room and replace the originals that were pulled out years ago by an unthinking previous owner – I can’t not work on the house. My Father-in-law, the Chatty Buddha, was here for Thanksgiving and I roped him into helping me wedge them into my tiny and very full shop. They will sit there until spring. Also thinking about re-installing an ironing board cabinet in the basement and a phone cubby in the upstairs hall. I have a problem…

image

Obsessing Over a Possible House Remodel & Letting My OCD Shine Bright

We are currently going through a make/buy decision concerning our house in Seattle.  Meaning, do we spend $200-$250K plus, months of time, and lots of sweat equity on updating our house, adding a garage/shop and dining room, and refitting the basement into an apartment for my mom.  Or, do we spend $5K getting the house ready to sell and find another house that has what  we want already done and complete.  Do we keep the house as a rental and build an entirely new one…?  We have met with our estate agent, a builder, a draftsman, an architect, a landscape company, a second builder, and now a third builder in our quest, but really are not any closer to making a decision.  As said before, Stamps-With-Foot and I are going over it all and trying to decide what is best for our finances, future possible family expansion, and quality of life.

I drew our lot and house just after we moved in and have spent more than a few hours modeling all our crap – to scale – and seeing how it would all fit in the possible expansion of our existing house with the new garage build.  Part of this on-going decision process is looking at all the possibilities and modifying the existing drawings into a “someday-maybe state”.  I have a touch of OCD…  If I am working on something or especially in the planning stages, I will drill WAY DOWN into the project.  Evidenced by the below images and the included timeline.

I have modeled sewing machines, yard tools, bikes, my 1986 Jeep, my wife’s Subaru WRX, hand tools, bikes, , machine tools, trees, bushes, furniture, lathes, saws, wiring diagrams, rugs, even our puppies… all to scale…  I may have a problem.

Overview copy

House elev copy

Main Floor copy

Basement ADU copy

Attic Master Suite copy

Garage Over View copy

Garage Interior Detail copy

Shop Interior copy

Attic Interior copy

Garage Garden Shed copy

Wiring detail copy

Time Line copy

Tooling Detail copy

Brodie Detail copy

Sand Box copy

The Bees in Our Back Garden – 2015

The lavender is in full bloom in our backyard.  Last year I counted five different types of bees that visited it during the late summer.  So far, I have counted seven different types, but I think one might be a type of yellow jacket.  I looked online, but it is inconclusive.  I went full-nerd and ordered a couple of books: Bees of the World by Mitchner and Bees of N. America (Princeton Guide).  I will take some more pictures and see how many types I can find every couple of weeks.  As a side note:  I often wonder given my nerdiness how I have both managed to procreate with the female of our species and how I have a wife that is so damn adorable…

Bees in the yard_France June_ 2015_ (36) Bees in the yard_France June_ 2015_ (34) Bees in the yard_France June_ 2015_ (30) Bees in the yard_France June_ 2015_ (21) Bees in the yard_France June_ 2015_ (15) Bees in the yard_France June_ 2015_ (13) Bees in the yard_France June_ 2015_ (10) Bees in the yard_France June_ 2015_ (7) Bees in the yard_France June_ 2015_ (5) Bees in the yard_France June_ 2015_ (4) Bees in the yard_France June_ 2015_ (2) Bees in the yard_France June_ 2015_ (1)

Apartment Therapy didn’t want what we got…

We sort of have a Wood-Craft/Bohemian/Bookworm thing going for our living room, den, and dining room decor at our place in France.  Stamps-With-Foot just sort of let me go and only said no to the anvil for a sofa table idea.  She hasn’t just sat on the chaise lounge and popping bon-bons in her mouth – all the curtains in the whole house are here doing and the flowers that seem to be magically refreshed every few days is all her as well. Everyone that we have had over loves it and one guest said: “It is so lovely that your company provides you with a professionally decorated home…”  I was a little taken aback; embarrassed and proud at the same time.

The wooden extension ladder bookshelf was my first project after we moved here and I have sort of built around that, adding a few pieces: a workbench turned into a buffet/TV table, the lathe book shelf, an assortment of Moroccan and Turkish rugs, an antique or two, a few unique bits & bobbles, some paintings, a chest or two, a small bench, etc…

The rest of the place isn’t too shabby either with a dedicated sewing room for my wife, a 1000+ lending library that we house and run, a great shop space, my office that is plywood-modern, a guest room out of the 1930’s with all sorts of girly pretty things (also my wife’s touch). Our bedroom is all dark wood, yellow curtains with sage green accents, and my son’s room/other guest room is bright and happy. The quiet and secluded backyard has an outdoor dining area and grill, fluffy green grass, lots of flowers, and a shady spot for my hammock – the puppies are in heaven out there!

My ego got the best of me and I snapped off a couple of shots and sent them into Apartment Therapy, knowing that the site admin would go nuts for our place…  nope, no response.  Fine, I get it.  I don’t NEED their validation, but I wouldn’t have kicked it out of bed either…  Instead, I will post my non-professional, non-posed (except the one of us and the puppies), snapshots of our house near Toulouse here as a tincture for my ego.   In the end, my wife loves it, which matters the most and one needs a happy wife if one wants a happy life.

Matt Talley _ House in France _ SM - 2005_ 10

French House 2014-2015 (4)

Matt Talley _ House in France _ SM - 2005_ 02

Matt Talley _ House in France _ SM - 2005_ 03

Matt Talley _ House in France _ SM - 2005_ 01

Matt Talley _ House in France _ SM - 2005_ 08

IMG_3957

Matt Talley _ House in France _ SM - 2005_ 07

Matt Talley _ House in France _ SM - 2005_ 04

Matt Talley _ House in France _ SM - 2005_ 06

Matt Talley _ House in France _ SM - 2005_ 13

French House 2014-2015 (1)

French house 2014-15 (1)

Matt Talley _ House in France _ SM - 2005_ 16

Matt Talley _ House in France _ SM - 2005_ 12

Matt Talley _ House in France _ SM - 2005_ 14

tumblr_njamwq5v7x1sk0b4eo1_500

Cornebarrieu Bench 2015  (29)_sm - Copy

Matt Talley _ Messy Shop in France _ 2015

Some small projects around the house

I have been swamped with work and travel for the last couple of months, so my shop time has been very limited. I have mostly been puttering around with my workbench, getting the last bits and bobbles done before calling it done and I have spent the off hour here and there on the lathe and doing stuff around the house:

  1. I had to fix a dishwasher leak and do some painting in the kitchen – still hate plumbing
  2. We did some re-arranging, so I had to fill some nail holes and then make new ones.
  3. Glued a cutting board back together after it split – craptastic glue didn’t hold, so it is back in the to-fix pile and will get some dowels this time
  4. Made a pot lid handle out of some scrap cherry.
  5. Tackled the jungle that was once my yard – twice
  6. Sharpened the lawnmower blade
  7. Turned the compost
  8. I bought a sheet of plywood and built a DVD shelf and a 8′ bookshelf for the lending library we run.
  9. There was been an oak log in my shop for months so I cut it in half and made a couple of stools for my office.
  10. Our puppies play a game called “run away from Mommy” when she takes them out, so I built two small fences to keep them in the back yard and away from the front gate.

I have do a few things in the shop just for organization and am working on a couple of little projects:

  1. We got a huge free wardrobe that I put in the GROP to organize non-tool/shop related items like climbing gear and life jackets
  2. My battery operated tools need a home, so I put together an organization center for them that mounts on the French cleat board
  3. I hung up my 6 heavy panel clamps to get them out of the way
  4. Made a Lathe chuck and tail-stock tool organizer for the French cleat organizer
  5. With a bonus from my J-O-B, I bought a few more molding planes, but they arrived in sad shape. I spent 6+ hours one Saturday cleaning, sharpening and fixing them.
  6. Started work on a blanket chest rebuild: cut here, snip there, new runners and new feet. Will get new milk paint finish when complete.
  7. Working on a copyist lectern rebuild. I made the base, pillar and other bits from some scrap beech left over from the bench build.
  8. Built a wooded top for the puppy Kennel so it blends better with the furniture in the Living Room.
  9. Putting together a 6-board chest for molding plane storage.  Will get re-purposed forged hardware and a Barn Red milk paint finish.

Matt Talley - Projects 2015_06 Matt Talley - Projects 2015_11 IMG_3410 Oak stool 23-2015 (2) Matt Talley - Projects 2015_24 Matt Talley - Projects 2015_22 Matt Talley - Projects 2015_23 Matt Talley - Projects 2015_25 Matt Talley - Projects 2015_17 Matt Talley - Projects 2015_18 Matt Talley _ Drill Organizer _ 2015

What I want Thursday – 4/2/15

Some stuff on my current want-list:

To stop traveling SO MUCH!
For real spring to arrive in Toulouse
To stop eating so many carbs and so much sugar
For my wife to feel all better
A couple of lathe tools.
A three day walk in the mountains
About 15 big, not cheap, hard cover books
A Moore & Giles Portfolio
For my new garage in Seattle to be done & dusted.
For my wife to finish some alterations and repairs for me
Porsche Design TecFlex Fountain Pen (F or EF Nib)
For my workbench to be 100% done
A slender dark grey Yorkshire cap
A sweet tweed vest
A few pairs of two-tone wing-tip Made-In-England Doc’s: White and Tan
A set of 10 cedar shoe-trees
Tickets for my son’s trip to France to be CHEAP.
For my Al’s Attire brogue boots not to squish my toes
Brooks Brothers grey or subtle pattern sport coat – slim cut.
A Filson Medium Travel bag.
One medium-small Rimowa Carry-on
To start working out again in earnest and stick to it
A fine set of Cuff-links
For my business plan to be finished
Tiffany blue silk tie and a matching pocket square.

5/5/2015 Update:

For real spring to arrive in Toulouse
A couple of lathe tools.
For my workbench to be 100% done
A slender dark grey Yorkshire cap – I got a sweet green tweed one made in London
A few pairs of two-tone wing-tip Made-In-England Doc’s: White and Tan
A set of 10 cedar shoe-trees
For my Al’s Attire brogue boots not to squish my toes – Had them stretched in the States last week.  Perfect fit now!
Brooks Brothers grey or subtle pattern sport coat – slim cut.
Tiffany blue silk tie and a matching pocket square.

2014: My year in Review

Moved into house in small village near Toulouse France
Started running and lifting again
Set up office at home
Had to deal with broken furniture from move – Insurance company was fairly easy to deal with
Fixed some stuff, got other new stuff
Flight to Florida for work
At least 10 hours a day spend at J-O-B
Work Laptop stolen in Paris hotel Room – Super pissed!!
Met friend both new and Old in and around Toulouse.
Trip to China for a week
More work, more coffee
Cut down a deceased cherry tree and made 3 big bowls
Gave two away
Played Pétanque with the old guys in my village
Built 5 benches for the house over a 5–week period
Work crazy hours
Flight back to Seattle for 2 weeks work/vacation
Visit to Carcassonne and Limoux
Found amazing French junk shop in the middle of nowhere
Joined a French beekeeping group
Bought a wood Lathe
Worked more crazy hours
Rode my bikes a little – not enough.
Made stuff for house: instrument hangers, book shelves, lids, kitchen island, etc…
Running and lifting again somehow stopped and work increased…
Got a new Banjo
Horribly addicted to coffee
Blogged a good bit
Started setting up small hand tool work shop in garage
Son in France for 2 months
Got a canoe for Father’s Day
Bastille Day in Carcassonne
Began building 450# traditional work bench
Quit Facebook
Spent way too much at local wood supply house
Made 4-5 small pieces of furniture for the house
Father in law in France for a month
Fixed some furniture for a co-worker and another piece for a neighbor
Adopted new puppy – Truffle
Flights to Germany, Marseilles and Paris
Super stressed – J-O-B
Getting fat(er)
41st Birthday trip to Porto, Portugal
Got an awesome watch as a gift from sweet wife
Trip to Morocco for J-O-B – bought 2 fantastic carpets while there
Thanksgiving in Turkey – sort of funny sounding. Was working
Grew a beard – wife disgruntled
Flight to Arkansas
Became a Grandfather!!
A beautiful baby girl!
Feel super-old
Tried to bribe a Friend’s parents into selling me his old jeep
Enacted a diabolical plan to make the jeep mine
Spent 14th Birthday with Son
Got most of Christmas shopping done in US
Came home to France with new mandolin and vintage violin
Cut down another cherry, and apricot and a plum and started making bowl blanks
Back to work and back to more 10-12 hour days and calls until 10pm
Christmas snuck up on me again.
Read 20 books in 2014 – almost shameful. Will read more next year
Spent holiday in Pau, France at a friend’s parent’s place and ate and drank until I was ready to pop
Finished top for new work bench – only took six months
Had two friends from London come over for New Years
Spent first weekend of 2015 snowboarding with two friends in Andorra