Back in Seattle! Let the projects begin!!

After two days of flying with a couple of heavily sedated French Bulldogs, we made it back to Seattle just in time for a home cooked Thanksgiving dinner. We are so glad to be back in our little house! The now sober puppies have staked their claim in our yard, we went to a few of our favorite neighborhood shops and *gasp* went shopping at Target on a SUNDAY *second gasp*!! In France, shopping on Sunday is a mythical creature that is spoken of in whispers. We miss Toulouse and our friends there already, but it is nice that things are sooo easy here.

The cold, rain, and ice was here to greet us, so in the interest of keeping Stamps-With-Foot happy, my first duty was to spend about 6 hours raising our hot tub from its long 2-year sleep. I cleaned it out, rinsed it twice, scrubbed it, filled it half way and ran the pumps, drained it, scrummed it all down again and then filled it to the top. They pump and heater fired right up and so far they are no leaks, but I will kaap a watch out for a while yet. It took about 4 hours for the water to go from 47 to 104 degrees and the temp has held steady.

We use BaquaSpa instead of Chlorine, so I loaded the tub up with a shock treatment after the it had come up to temp and had been circulating for 24 hours. I waited a few hours before taking a water sample into the local spa shop for testing. All good: just needed a little Oxidizer and to increase in the calcium. Wife happy – she sat in the tub yesterday for about an hour like a proper Japanese snow monkey.

I also just “happened” to stop in at Second Use and picked up a couple of painted fir corner cabinets that I have been eye-balling from afar. They will go in our living-room and replace the originals that were pulled out years ago by an unthinking previous owner – I can’t not work on the house. My Father-in-law, the Chatty Buddha, was here for Thanksgiving and I roped him into helping me wedge them into my tiny and very full shop. They will sit there until spring. Also thinking about re-installing an ironing board cabinet in the basement and a phone cubby in the upstairs hall. I have a problem…

image

1 Comment

Leave a Reply

Your email address will not be published. Required fields are marked *