Working on my day off

The house remodel seems to never end…  I will be so glad to just be and live in our space at some point.  We are close, but there are still details left undone – enough that I am trying to concentrate on one room at a time.  My plan is to get each done in turn and then move on to the next.  I wasn’t as successful at that as I wanted to be this weekend as I bounced back and forth between the living room and our bedroom closet, but I did get a ton done.

I installed the upper shelves and corner shelf in the walk-in closet, laminating two layers of 3/4″ plywood for really strong support over a 54″ span and in the unsupported corner.  In addition to using copious amount of glue and screws, I attached the butted plywood edges together with wood biscuits – it is always a fine day when I get to crank up the biscuit joiner.

matt-talley_-notebook_11-2016-3 matt-talley_closet-build_11-2016-2 matt-talley_closet-build_11-2016-1 matt-talley_-notebook_11-2016-2

 

 

 

 

 

 

 

 

Almost a year ago, I sourced some corner shelves at one of the local architectural salvage places for less than $200 – far cheaper than what it would have taken me to build them.  They came out of a 1930-40’s house and were painted Christmas colors, but I knew that they would be perfect for our living room, which was stripped of its built-ins at some point in the last 88 years.  They have sat in storage and until this past week when I pulled them out and got some material together to permanently mount them.  Stamps-With-Foot helped me set them in place after I built sturdy bases.  Each of them cover a wall plug, so I am in the process of re-routing the receptacle using armored cable.  I also have to build in an air-return duct under one and that has taken some serious brain power to get right.  I will add trim this week and my wife and Mother-in-law will paint them cabinet white this weekend.

matt-talley_corner-builtin_11-2016-4 matt-talley_corner-builtin_11-2016-1 matt-talley_corner-builtin_11-2016-2 matt-talley_corner-builtin_11-2016-3 matt-talley_-notebook_11-2016-1

 

 

 

 

 

 

 

 

While I was at it, I punched out a rubber washer for a pot lid knob.  I made the knob a couple years ago out of some scrap cherry firewood after the original plastic one broke.  The original washer had corroded, so I made a new one and installed it.

matt-talley_new-washer-for-pan-lid

I also took a couple minutes to mount the red glass post topper on the back fence.  It was ordered (along with a spare) months ago and have meant to put it on every weekend since.  There is always an excuse for why I didn’t, so I marched right out first thing Saturday with a tube of clear silicone and finally just got it done.  It is the little victories that keep me going.

matt-talley_glass-post-top_11-16

 

Back in Seattle! Let the projects begin!!

After two days of flying with a couple of heavily sedated French Bulldogs, we made it back to Seattle just in time for a home cooked Thanksgiving dinner. We are so glad to be back in our little house! The now sober puppies have staked their claim in our yard, we went to a few of our favorite neighborhood shops and *gasp* went shopping at Target on a SUNDAY *second gasp*!! In France, shopping on Sunday is a mythical creature that is spoken of in whispers. We miss Toulouse and our friends there already, but it is nice that things are sooo easy here.

The cold, rain, and ice was here to greet us, so in the interest of keeping Stamps-With-Foot happy, my first duty was to spend about 6 hours raising our hot tub from its long 2-year sleep. I cleaned it out, rinsed it twice, scrubbed it, filled it half way and ran the pumps, drained it, scrummed it all down again and then filled it to the top. They pump and heater fired right up and so far they are no leaks, but I will kaap a watch out for a while yet. It took about 4 hours for the water to go from 47 to 104 degrees and the temp has held steady.

We use BaquaSpa instead of Chlorine, so I loaded the tub up with a shock treatment after the it had come up to temp and had been circulating for 24 hours. I waited a few hours before taking a water sample into the local spa shop for testing. All good: just needed a little Oxidizer and to increase in the calcium. Wife happy – she sat in the tub yesterday for about an hour like a proper Japanese snow monkey.

I also just “happened” to stop in at Second Use and picked up a couple of painted fir corner cabinets that I have been eye-balling from afar. They will go in our living-room and replace the originals that were pulled out years ago by an unthinking previous owner – I can’t not work on the house. My Father-in-law, the Chatty Buddha, was here for Thanksgiving and I roped him into helping me wedge them into my tiny and very full shop. They will sit there until spring. Also thinking about re-installing an ironing board cabinet in the basement and a phone cubby in the upstairs hall. I have a problem…

image

The Never Ending Hutch

Right after we bought our place, I saw an add on Craig’s List for a huge hutch.  It piqued my interest and I went by to take a look at it.  A builder had pulled it out of a church school in Queen Anne, but it had been in the rectory library before that.  It was in really bad shape: paint splattered here and there, broken and missing trim, missing glass, dents, dings, scratches, etc…  Even with all that, I saw potential.  After some surprise haggling, I loaded it on my truck and brought it home.  This was right after I had shoulder surgery for the fourth time, so I would not be man-handling two 8 foot by 4 foot sections of furniture…  I picked up some laborers in the Home Depot parking lot by the house and had them load it into my basement where it sat taking up space for three months before I felt strong enough to tackle the job.  Below is the truncated build process in 67 easy steps:
  1. Looked at hutch for too long and decided to get it done.
  2. Started with bottom section – doors removed.
  3. Stripped off all old paint and varnish from outside with “environmentally friendly” orange stripper.
  4. Scraped and scraped stripper off.
  5. Cussed “environmentally friendly.”
  6. Put more stripper on.
  7. Scrubbed off again.
  8. Wife helped for 40 minutes, hated it and didn’t touch either section again.
  9. Shoved a 1″ splinter under one of my fingernails.
  10. Said the “F” word 5+ times, bled on base & floor and thought about cutting it all up for firewood.
  11. Washed whole thing with paint thinner to stop the stripper residue from working any more.
  12. Let dry and sanded whole case with 120 grit.
  13. Sanded with 220 grit.
  14. Sanded again with 220 grit.
  15. Stained with a crazy pricey, but color-matched mahogany tinted oil-based stain.
  16. Used wife’s special dish gloves.
  17. The old, old fir had issue with the stain and was a little splotchy in some really key spots.
  18. Was grumpy for two days.
  19. Second coat of stain used to blend some areas.
  20. Put on first coat of wipe-on poly acrylic semi-gloss finish.
  21. Wife found stain covered dish gloves and I got in trouble.
  22. Went to store and bought wife new gloves.
  23. 24 hours later, scuffed finish with white 3M pad and applied finish coat 7 more times.
  24. Spent HOURS on the final coat.
  25. Repeated all above steps with the four raised panel doors.
  26. Installed 100+ year old glass pull-knobs on doors.
  27. Whole process took two months.
  28. Moved base into finished side of basement for use as a media cabinet and LCD TV base.
  29. Went downtown to Chinese-owned granite shop on Seattle’s 1st Ave and haggled over granite for top.
  30. I am a poor negotiator in Chinese.
  31. Left and came back with Mandarin speaking co-worker.
  32. Got GREAT deal on custom top.  1/12th of the price that I was quoted at Home Depot – really!
  33. Built A-frame jig for back of truck to haul granite.
  34. Picked up top and hauled home.
  35. Bribed 4 neighbors to help move it into place.
  36. Neighbors won’t answer my call anymore…
  37. Four months from start to finish.
  38. Two weeks later I started the top section.
  39. Decided to make top section into a living room “built-in.”
  40. Built, painted and installed new 8″ base for the top section in our living room to match existing trim.
  41. Removed the doors, hardware, and hinges.
  42. Repeated steps above with the exception of splinter under nail and use of wife’s gloves: I learned my lesson the first time.
  43. Cut hole in back for outlet already on wall.
  44. Had other, unsuspecting neighbors help me move the top section up.
  45. New neighbors called me names after it was all done.
  46. Hole for outlet 1″ off to the left.
  47. Said hateful words.
  48. Grumpy again.
  49. Calmed down and used Dremel tool and coping saw to remove section from one side and glued it to other side.
  50. Trimmed out outlet hole.
  51. Stained and finished outlet trim.
  52. Had wedding and took 30 day break in the rebuild/refinish process.
  53. Started looking for matching trim and crown molding at reclaimed lumber yards.
  54. No Luck.
  55. Had crown custom milled at high cost by a shop in SODO that had 90 year old machines running on their floor (shop closed about a month after I was there last 🙁
  56. Started the process of refinishing the doors.
  57. Installed crown molding.
  58. Shot nail through molding and into palm on final piece of crown.
  59. Bled on top of hutch – no dirty words.
  60. Installed refinished doors.
  61. Built two interior shelves out of 80 year old fir floor boards.  Stained and finished – look original!
  62. Smacked the back of my head when installing shelves and almost knocked myself out.
  63. Sourced and purchased piece of wavy restoration glass to match original broken pane.
  64. Stained and finished the crown.
  65. Put final coat of trim paint on the new base.
  66. Installed the one missing glass pane.
  67. 5 months after base installed the top is done and looks like it has been in our place since 1928.
Never again.