House Remodel Update – February 2016

Making lemonade out of lemons…  I have mentioned an issue we found with our house and how we had to tear out walls to fix things.  Well, we took the opportunity to do some long wanted remodeling since the place was already torn apart.  We are insulating the exterior walls, re-plumbing the whole house, re-wiring to remove the old knob&tube still left in the attic, remaking the Stairs of Doom into something that people won’t fall down, tearing out the 30% efficient oil heater and adding a heat-pump, adding attic access, making a dining room, putting in arched doorways, bringing in more light, and adding lots of period-appropriate detail.  Below are some of our in-progress updates after three weeks of demo, with the “WAS” pictures first.

The stairwell and chimney tear out – before and during:

Matt Talley_Remodel_2016_001

Matt Talley_house remodel_2016 (11)

Matt Talley_house remodel_2016 (4)

Matt Talley_house remodel_2016 (6)

Matt Talley_house remodel_2016 (8)

Talley_house remodel_008Talley_house remodel_007Talley_house remodel_002

Talley_house remodel_003

Talley_house remodel_005

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The 1942 oil heater removal – before and during:

Matt Talley_Remodel_2016_002

Matt Talley_house remodel_2016 (3)

Talley_house remodel_004

 

 

 

 

The back-bedroom transformation into the dining room – before and during:

Matt Talley_Remodel_2016_003

Matt Talley_ house remodel_2016_001

Matt Talley_ house remodel_2016_002

Matt Talley_house remodel_2016 (2)

Matt Talley_house remodel_2016 (12)

 

 

 

 

 

 

 

The Attic – Before and during:

Matt Talley_Remodel_2016_004

Matt Talley_house remodel_2016 (7)

Matt Talley_house remodel_2016 (9)

Matt Talley_house remodel_2016 (10)

1 Comment

Leave a Reply

Your email address will not be published. Required fields are marked *