Film Friday – Double Feature: Attic and Bath Remodel Status

I spent two FULL days, with a little help from my wife, instaling the baseboard, door, skylight, stair, and window trim in the new attic space. This video includes a few tips and tricks along the way. As this will be my wife’s studio space, she put in some sweat equity filling nail holes, doing a little sanding, and she chose the paint scheme. I will be painting next and will document that whole process as well.

This is Part 1 of our basement bathroom build/finish. We decided to add a basement bathroom when we replumbed the house a couple of years ago. 6 months of chaos insued and we took a two year break before diving back into the bathroom build. This time has been SO much better. We went with white subway tile for the walls, black and while hex tiles for the floor, and charcoal grout. The next step is trim, paint and fixture install.

Film Friday – Attic Remodel: Week 7

This is the last of the weekly updates for the Attic Remodel Project. The heavy work and drywall is complete and I will start trimming and painting the space this week (nights and weekends as I have a real J-O-B) so that my wife will have a studio that is full of light and opportunity. The next and final installment of the attic build will show all the paint and trim steps, some tips & tricks, and will be a few weeks away.

Attic Remodel: Week 6

This week, we went from bare studs to insulation to wiring to drywall with a dash of new windows thrown in for good measure. The HVAC split unit head vacuum & power lines were installed and we had a serious accident in the attic that occurred during that process.

Film Friday – Attic Remodel: Week 4

Week 4 brings us views, natural light, and modern wiring! We had a 4’X4′ venting skylight installed that gives us sliver views of Puget Sound, The Seattle Skyline, The Olympic Mountains, and the Cascades. ALL the knob & tube wiring has been replaced, we added some lights and plugs on the main level, are ready for the windows to go in on Monday, and for the last part of the rough carpentry to happen next week as well.

Film Friday – Week 2 of the Attic Rebuild

I know… I have been posting a bunch of videos lately and not a lot of travel, Jeep, Puppy, garden, music, building, or other normal posts.  That will change with the coming of Spring and the completion of our attic remodel/rebuild.  In that vain, below is the short video documenting week 2 of the process.  It looks like it will be a 5-part series.

Film Friday – Framing Double Feature

We are remodeling and rebuilding a 90+ year old attic into a master bedroom. This required completely rewiring to electrical in the attic, moving/fixing plumbing, building a complete floating floor, adding roof supports, etc… Below is thew documentation of the 1st week of the build.

Part I of a 2 part video on the replacement of a falling down 90+ year old shack of a carriage shed with a modern 24X24 garage. This was not a flat mono-slab, green field build. Lots of digging was required and a rebar-filled retaining wall and slab had to be poured in the middle of winter before the first wall could go up.

Spring Has Sprung – 2018

With the official start of Spring – as determined by the fact that my wife was reading a book, enjoying the sunshine, and drinking wine in the yard – we had a busy weekend at La Maison Du Talley:

Moved all the power tools in the shop against the wall for temp storage duty
Ordered material for attic finish
Set up new iPhone (old one a brick!)
Checkout at Pratt to be able to independently use their fabrication shop.
Moved everyone else’s crap out of my basement and temporarily into the garage
Said dirty words about all the other people’s crap being stored in our home
Cleaned the basement completely out
Pruned the apple trees in the backyard
Restacked the firewood wood pile
Cleaned and prepped attic for floor installation
Published two YouTube videos
Set up new condenser microphone in home office/studio
Breakfast with my mom and wife
Went to the Moonshiners 36th Annual Jeep Swap Meet
Did not buy a new-to-me 1946 CJ-2A project Jeep
Stayed Married
Did not buy a motorcycle or boat at the swap meet
Stayed married – there is a theme…
DID buy an ARB on-board air compressor and a duel battery mount – and got a sweet deal!
Signed up for three classes at Pratt for this spring: Block printing, wood carving, and letterpress
Padded and protected the wood floor and built-ins in prep for attic finish
Cleaned the hot tub
Edged and mowed the front and back yard
Spread Weed&Feed on the back yard and parking strip
Re-seeded the front yard

House Remodel Status September 2, 2016 – 7.5 months in

Here is the house/garage re-build/build status for the 1st part of September.

  1. The F-Bomb Garage has been painted – at least the outside walls.  I need to paint the trim and doors next.
  2. Repaired some major issues with the trim and siding on garage – real unhappy with my garage builder!
  3. Front yard is still green, but need to clean and re-seed the back yard.
  4. There oar only 2 rooms in the house that are complete and need no work at this point.  Stamps-With-Foot could be happier with me right now…
  5. The mounting brackets for the granite in the basement are done and I will install them this weekend.
  6. Our washing machine went out…  fuck.  The bearings finally gave up the ghost.  need to haul it out and put another in.
  7. No garage power yet.  Huge load of confusion between the City of Seattle and my electrician.  Maybe worked out now, but we will see.
  8. The yard is completely fenced in and the rear gate is installed.  just a couple of tweaks and then power wash and polyurethane coat.
  9. The living room corner cabinets are in place, but not painted or installed.
  10. We have a small roof leak – motherfvcker!!!  it is around the kitchen vent and from where the moss removal team got too eager with the power washer.  I will go up there this weekend and seal it.
  11. Got a huge bill from our plumber for work that they didn’t do before abandoning the job.  wanted to scan my ass into the 3D printer and send them a copy.  Called a lawyer instead.  we have a plan forward.

Being the proprietor of a urban wildlife kibbutz

I was home in Seattle taking care of a couple of things and my mom mentioned skratching noises on the roof… hmmm… DAMMIT! WE HAVE SQUIRRELS IN THE ATTIC!! They chewed between the gutter and the shingles and have been living the easy life all fall and winter in my attic. I called a contractor to fix the initial damage and the secondary water damage on the soffet.

In addition to the squirrels, I also have the urban wildlife equivalent of a kibbutz in the attic: Rats and bees have also decided to move in. There was a swarm on the eve of the front porch this summer, but my mother said that they sort of went away. What that actually meant is that I have a small colony that has settled in the eyebrow eve above the front door.

Then there are the other furry residents…

While going over yard design plans with my gardening contractor, I noticed that we were being observed from above by two beadly little eyes. I tagged a medium brown rat (8″ body) with my son’s pellet rifle as it was making a run at the hole in the soffet – Headshot. It makes my heart happy that I could send him off to his eternal reward.

I almost welcome the bees, but rats and squirrels…  I bet they had dinner parties, board game nights, and cross species orgies to cement the truce and draw up the boundaries of their respective territory in MY attic.

I swear by the GOT god’s, old and new, and by the hairy feet of Bilbo Baggins, that if I build another house it will be concrete and steel.  I found myself cruising for property again this morning and there is an old titan missile silo for sale near Yakima that is speaking to me.

Rats in Attic 2015