Kitchen Update – September 2013

We are in the home stretch in getting the kitchen done! Holy crap, it has been a long road. I am so close that I can FEEL the end coming. My hope is that I do not get penalty points from the wife for finishing it just before we move away for a couple of years…

The recycling/trash pullout is 95% done – it just needs paint. The two above-fridge pullouts are in work and should be ready to go in by next Monday-ish – I just need the good weather to hold a little longer. There are 2 toe-kick drawers to paint and install. The new cookbook shelf and the little 6-bottle wine rack (Made block top) that I popped together are complete (wife loves!) and the shelf really marries the two halves of the kitchen together. We have spent 4 years moving a cheap paper towel holder around the kitchen and it is constantly in the way. I decided to build a new one and mount it to the lower spice cabinet door and spent an hour with the lathe, jigsaw, and router to make a holder that matched the rest of the kitchen. Stamps-With-Foot will prime and paint it tomorrow.

I will install the majority of cabinet pulls tomorrow night, but we need 12 more red glass handles for the remaining cabinets so that they match. There is still painter’s caulk and 1/4 round to go on in one spot and I have finally sourced 40 feet of matching cove molding for the tops of the new cabinets – by sourced, I mean I am making it on the table saw. So close….

Leave a Reply

Your email address will not be published. Required fields are marked *