Kitchen Cabinet Work Update

There was a flurry of activity to get our kitchen done before our move to France.  I got it 99% of the way – with serious help from Mr. Flood and my sweet wife.  It just needs a little paint on the overhead fridge pullouts, slight pull-out slide adjustment and the installation of the custom milled and matched cove molding.  That will all keep until we get back to Seattle though.  My mom will be able to cook in there just fine as-is.

I feel that the upper cookbook shelf ties the old and new sides together and adds that part of the overall kitchen that was missing.  The shelf also seems to lighten up the space a little as well.  The wine rack was put in specifically for my wife.  It started as a discussion in the breakfast nook one mid-morning, transitioned to a napkin sketch, and four hours later, the carcass was built, bottom brackets cut, and block top was in the clamps with the glue drying.  After the paint was on and top installed, my wife swooned.  It made me smile from ear to ear!

The paper towel holder was a bit of a conundrum.  With low upper cabinets, there was just no good spot either on the counter or under the cabinet.  I toyed around with a couple of ideas before I decided to mount the paper towels on the old ironing board (now spice cabinet) lower door.  I used some scrap popular and turned a section of oak down on the lathe for the rod.  It is inserted all the way through the shelf and both wedged and glued in place.  My grand kids will still be able to use that towel holder when they are my age.  yes, I over built something again…  On the brighter side, the paper town holder bracket, the small round shelf brackets, the cookbook shelf brackets, and the wine rack brackets all match, again marrying all the different kitchen elements together.

Almost as important to her as the wine rack was the trash and recycling can drawer.  After it was in and painted I caught her pulling it open and closing it over and over with a giggly smile.  The curves on the side match all the shelf brackets – I couldn’t help myself.

Kitchen Update – September 2013

We are in the home stretch in getting the kitchen done! Holy crap, it has been a long road. I am so close that I can FEEL the end coming. My hope is that I do not get penalty points from the wife for finishing it just before we move away for a couple of years…

The recycling/trash pullout is 95% done – it just needs paint. The two above-fridge pullouts are in work and should be ready to go in by next Monday-ish – I just need the good weather to hold a little longer. There are 2 toe-kick drawers to paint and install. The new cookbook shelf and the little 6-bottle wine rack (Made block top) that I popped together are complete (wife loves!) and the shelf really marries the two halves of the kitchen together. We have spent 4 years moving a cheap paper towel holder around the kitchen and it is constantly in the way. I decided to build a new one and mount it to the lower spice cabinet door and spent an hour with the lathe, jigsaw, and router to make a holder that matched the rest of the kitchen. Stamps-With-Foot will prime and paint it tomorrow.

I will install the majority of cabinet pulls tomorrow night, but we need 12 more red glass handles for the remaining cabinets so that they match. There is still painter’s caulk and 1/4 round to go on in one spot and I have finally sourced 40 feet of matching cove molding for the tops of the new cabinets – by sourced, I mean I am making it on the table saw. So close….