Painting The F-Bomb Garage

The Garage build is coming along. Still waiting for Seattle City Light to connect the power from the transformer. 5 weeks now…Delay has been just a factor of this build. I would have more patience with City Light if one of their crews hadn’t been sitting at a bikini coffee stand for 30+ minutes on Monday while I was eating a late lunch across the street. I like boobs and bikinis and coffee even more than the average bear, but come on – don’t tell tell everybody how swamped your crews are if they have time to have a philosophical discussion with a nearly naked barista…

(For those of you not in the PacNW – bikini coffee here is a thing and some stands are really open to the definition of what a bikini is – an eye patch and pasties are the rule and some stands.)

I can’t continue with the interior wiring until that connection happens and the electrical inspection is OKed. No insulation or drywall/T1-11 until it get the “OK to Cover” from the electric inspector. I am not one to sit on my butt, so I wheeled out the airless spray rig for the first time in like forever and put two coats of quality Benjamin Moore paint on the outside of the garage – matches the house. I will paint the doors and trim this weekend.

Matt Talley_Garage 2016_087 Matt Talley_Garage 2016_088Matt Talley_Garage_build_2016_78

 

Leave a Reply

Your email address will not be published. Required fields are marked *