House Remodel Update – February 2016

Making lemonade out of lemons…  I have mentioned an issue we found with our house and how we had to tear out walls to fix things.  Well, we took the opportunity to do some long wanted remodeling since the place was already torn apart.  We are insulating the exterior walls, re-plumbing the whole house, re-wiring to remove the old knob&tube still left in the attic, remaking the Stairs of Doom into something that people won’t fall down, tearing out the 30% efficient oil heater and adding a heat-pump, adding attic access, making a dining room, putting in arched doorways, bringing in more light, and adding lots of period-appropriate detail.  Below are some of our in-progress updates after three weeks of demo, with the “WAS” pictures first.

The stairwell and chimney tear out – before and during:

Matt Talley_Remodel_2016_001

Matt Talley_house remodel_2016 (11)

Matt Talley_house remodel_2016 (4)

Matt Talley_house remodel_2016 (6)

Matt Talley_house remodel_2016 (8)

Talley_house remodel_008Talley_house remodel_007Talley_house remodel_002

Talley_house remodel_003

Talley_house remodel_005

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The 1942 oil heater removal – before and during:

Matt Talley_Remodel_2016_002

Matt Talley_house remodel_2016 (3)

Talley_house remodel_004

 

 

 

 

The back-bedroom transformation into the dining room – before and during:

Matt Talley_Remodel_2016_003

Matt Talley_ house remodel_2016_001

Matt Talley_ house remodel_2016_002

Matt Talley_house remodel_2016 (2)

Matt Talley_house remodel_2016 (12)

 

 

 

 

 

 

 

The Attic – Before and during:

Matt Talley_Remodel_2016_004

Matt Talley_house remodel_2016 (7)

Matt Talley_house remodel_2016 (9)

Matt Talley_house remodel_2016 (10)

What I Want Thursday – Febuary 2016 Edition

Below are the things that I really want and that are present for me today:

More time with my children and family.
I want to stick to my diet and workout schedule and not fall off the wagon and back into the cookie/café Mocha/lethargic/big-belly/back-hurting abyss.
For the house remodel to be done
For my Garage build to be 100% and my new lift and tools installed and waiting for me.
Growler or two from West Seattle Brewing Co.
Letters – written on actual paper – from my kids.
A longboard skateboard
I could stand a new Kindle
A handsome tweed vest – or two
Brown Redwing Engineer’s boots
Huge antique pattern lathe found in a barn or a PM4224 with all the add-ons.
A pair of 1/2 round and a pair of Snipe Bill molding planes
A 1.75 – 3Hp SawStop Table Saw
One fine compound sliding miter saw
>8″ joiner/planer
A Grizzly G0752 Benchtop Lathe and G0801 Vertical Mill

If you want to hear God laugh, tell him what your plans are…

As mentioned a few weeks ago, we hit a snag on the garage build. Super frustrating. There is some stuff in the house that takes precident – they just have to happen and happen right now. Thankfully, we are in a place to take care of it, but my dream shop has been pushed a couple of months. That hasn’t stopped me from getting everything prepped though. I have completely cleared out my current GROP and moved all the innards into storage for the duration of our build/re-build. A few things like ladders and yard tools are left, but after giving away an entire trailer load of scrap lumber and plywood it is all open space. It hurts a little that the cleanest my garage shop has ever been is right before I tear it down to built a new one…

The other day, I had to do a little fiberglass repair on the Jeep top and swap out my floor-mounted headlight dimmer switch. Not super a fun/sexy mod, but taking the door off made it easy – ish. I will not be bright-lighting folks for my entire commute anymore. It was nice to have a dry spot to work during a Seattle winter. Also, this was the only time in 6+ years that a vehicle had been in it.

Matt Talley_ house remodel_2016_003

Matt Talley_ house remodel_2016_004

 

 

 

 

We had to start the house remodel before the garage and start in the rear bedroom (NW corner of the house). The interior walls had to come out to repair an issue(s). After we take care of the repairs, a new arch will lead into the kitchen, there will be a 4′ French door with a 12″ balcony looking out into the back yard, and we will have wainscoting up to 68″ and a coffered ceiling in what was the back bedroom and what will be the new dining room. Here are some shots before the full wall removal, some replacement studs and new headers.

Matt Talley_ house remodel_2016_001

Matt Talley_ house remodel_2016_002

 

 

 

 

The basement stairs are also in need of replacement and will be taken out and rebuilt next week. The new HVAC will go in the week after. It has been and will continue to be a test of our resolve and patience.

Getting a new garage in 2016!!!

Woohoo!!  It looks like we are a go for a new garage and some needed updates to our heat, plumbing, and wiring at the house.  I am meeting our builder this weekend and passing him a check (two checks actually, one is for the City of Seattle permit office…) and I will have a real garage and wood-shop by spring.  I will have room for a big lathe, cabinet saws, wood storage , my joiners workbench, room to assemble projects/furniture, a real dust collection system, and all my planes/saws/chisels/hand tools on one side.  On the other side of the shop will be a mini-machine/fabrication shop with a two post lift, lathe, end mill, welder, mobile paint booth, and work table…

I cannot tell you how stoked I am!  Seriously, I am all giddy about it.  I plan to make cool stuff, descend into super-nerdy, and will be voiding the shit out of warranties!

Here are the prelim drawings that are being submitted and a lay out of the shop floor.

Garage floor 3 Garage Floor 1 copy Garage floor 2 copy

Update:

Drawings sent to the city. Cross your fingers and pray with me that Planning is having a good day/week/month and these babies get a stamp.

image

image

Obsessing Over a Possible House Remodel & Letting My OCD Shine Bright

We are currently going through a make/buy decision concerning our house in Seattle.  Meaning, do we spend $200-$250K plus, months of time, and lots of sweat equity on updating our house, adding a garage/shop and dining room, and refitting the basement into an apartment for my mom.  Or, do we spend $5K getting the house ready to sell and find another house that has what  we want already done and complete.  Do we keep the house as a rental and build an entirely new one…?  We have met with our estate agent, a builder, a draftsman, an architect, a landscape company, a second builder, and now a third builder in our quest, but really are not any closer to making a decision.  As said before, Stamps-With-Foot and I are going over it all and trying to decide what is best for our finances, future possible family expansion, and quality of life.

I drew our lot and house just after we moved in and have spent more than a few hours modeling all our crap – to scale – and seeing how it would all fit in the possible expansion of our existing house with the new garage build.  Part of this on-going decision process is looking at all the possibilities and modifying the existing drawings into a “someday-maybe state”.  I have a touch of OCD…  If I am working on something or especially in the planning stages, I will drill WAY DOWN into the project.  Evidenced by the below images and the included timeline.

I have modeled sewing machines, yard tools, bikes, my 1986 Jeep, my wife’s Subaru WRX, hand tools, bikes, , machine tools, trees, bushes, furniture, lathes, saws, wiring diagrams, rugs, even our puppies… all to scale…  I may have a problem.

Overview copy

House elev copy

Main Floor copy

Basement ADU copy

Attic Master Suite copy

Garage Over View copy

Garage Interior Detail copy

Shop Interior copy

Attic Interior copy

Garage Garden Shed copy

Wiring detail copy

Time Line copy

Tooling Detail copy

Brodie Detail copy

Sand Box copy