My workbench is DONE!!

I am about a month late in posting this – life and my J-O-B got in the way – but the Cornebarrieu Bench is done. Completely done! All bells and whistles added. It seems like it took me forever, but it fits perfectly in the shop and I started using the bench even before it was finished. I am very happy with the outcome and am currently working on projects that have been piling up all winter. Just in case you haven’t been following along for the past year and a half or so:

My GROP (garage and shop combo) in Seattle was too small for a proper joiner’s bench. I made due with a slim, high, wall-mounted work counter, a bolted on machinist-vise, Quick Clamps, and the top of my table saw. It worked – mostly/sort of – but was a pain in the ass a good bit of the time: I never once planed a board on a stable, solid surface. My GROP here in France is roughly the same size as the one in Seattle, but is absent the huge cast iron machines and saws. I have some room to move and finally have the space for a big, heavy, proper work bench as well as some time to build one – or so I thought.

It is an amalgamation of benches by M. Roubo, Roy Underhill, Chris Schwartz, and Bill Schenher. I am calling it the “Cornebarrieu Bench” after the small village in southern France where we live, where the lumber has been sourced, and where the bench was made and first used.

For anyone interested, here is a documented build process, build notes, and step by step guide – 115 steps – to build this beast.

Cornebarrieu Bench 2015  (30)_sm - Copy

Cornebarrieu Bench 2015  (31)_sm

Cornebarrieu Bench 2015  (29)_sm - Copy

Used my workbench today!

Today was the official first use of my workbench. I used it as a work table to lay out the shape of the leg vise, I cut the dados for the tail vise, cleaned them with a chisel, and after spreading plastic used the bench top as a glue-up table for the vice pieces. I had enough room at the other end of the bench to put together a French-cleat mounted battery drill organizer that I cut the parts out for yesterday afternoon. I have trouble staying with one project and do 3-5 at a time. It makes my wife crazy.

The bench top height is perfect and I am super stoked to have a real workbench here in France. I can finally get down to serious business and make some moldings and a small linen-fold panel chest.

Happy!

Workbench Progress

Progress on the Cornebarrieu Bench is coming along.  It has been slow going – I have been swamped with work, travel, lack of allowance (I spent it on Christmas and a classic fiddle/violin…), more work, etc…

Stamps-With-Foot gave me a gift card for our local Home Center/hardware big-box as a Christmas present that took care of the price for the last section of the top. I got a lot accomplished this last two weeks:

  1. The final sections of the top were glued up just before New Years eve- using every single clamp I brought to France and more than a little ingenuity.
  2. Installed (2 hours of cutting, drilling and chiseling) a pricey German-made cast iron end vice that I got on 65% sale – was missing two small metric bolts and the wood handle.
  3. Made final leg cuts: the tenons that go inside the bench top.
  4. Put 5/16 oak dowels in to the pieces that have cracked, even a little, to make sure that the cracks do not spread.
  5. Gave all the base parts an 80 grit sanding.
  6. Really like the sawmill marks on some of the pieces.  Am going to put clear poly on the base instead of milk paint to preserve the marks.
  7. The legs and stretchers shrunk and warped just a touch in the six months since I cut them even though I had it all clamped together.  It will be fine and could have been worse.
  8. Made the first dry-fit of the base to the top: Everything lined up , fit perfectly, and is as square as I could ask for.
  9. Drilled holes for connector bolts and lag screws.
  10. Installed base shelf cleats
  11. Cut the 12 sections of 5/8″ tongue & groove pine that will be the base shelf

Cornebarrieu Bench 08-2014 Cornebarrieu Bench 09-2014 Cornebarrieubench 12-2014 Cornebarrieu Bench 1-2015

 

 

 

 

 

 

Before I head to the US in a couple of weeks, I hope to have installed the end-vise block, given the base a 120 grit sanding, polyurethane the base &shelf, cut the hole for the leg vise screw and the rectangle cut for the vices’ parallel guide. I also want to install the leg vise nut in a pocket behind the leg while the bench is upside down.

What I Want Thursday – 11/6/14

Below are the things that I find are present for me today:

1. More time with my children and my mom.

2. I want to stick to my diet and workout schedule and not fall off the wagon and back into the cookie/café Mocha/lethargic/big-belly/back-hurting abyss.

3. For my wife to finish some long ago promised sewing tasks for me – I would really like those shorts, pants, and shirts back…

4. a Fine large set (only 2) of Easy Wood carbide insert lathe chisels for all the fall and winter bowl work I have planned

5. For my proper car camping/glamping kitchen set up to be finished – it is about 1/2 the way done and sitting in the GROP.

6. A leisurely trip to Rome and Venice with my wife – no puppies, no family, no friends – just us for a week or so.

7. For my Joiners workbench to be done and set up and in use.  I am only about 1/3 of the way done and only have 8 of the 17 sections of the top laminated up.

8. A few booksFranklin Bio by Wood,  Paris Between the Wars 1919-1939: Art, Life & CultureErnest Hemmingway bio and a two books of his letters (1&2), A signed hardbound copy of Campaign Furniture 
Theodore Roosevelt: a Strenuous Life,  The Anarchist’s Tool Chest etc…

9. A whole Metric crap-ton (my favorite unit of measure) of wooden wine crates for a couple of open projects at home.

10. To give Heifer International a menagerie of animals for Christmas – That is my charity goal for the year.  We give monthly, but I would like to be able to do more this year.

11.  For our 2015 French Visas to be finished so we can get on with plans for next year.

Weekend Update – the gods of lawn maintenance are displeased

We had a national holiday in France on Friday and I made the most of my 3-day weekend.

Instead of the stuff I needed to do I did this:

1. Got up at 7:30 on a holiday
2. Went up into the mountains with a group of Expats for a hike and a picnic – got some great pictures and had fine food
3. Worked on a design for wooden wine box/kitchen cabinets
4. Completely filled my Leuctterm1917 design sketch notebook – took 2 years
5. Watched a girlie movie with my sweet wife
6. Started a new notebook – a Rhodia Webbie this time (I like the paper better)
7. Spent too much time on the interwebs
8. Started formal permit process for garage shop and apartment above at our place in Seattle
9. Sanded, sealed and painted the “T” supports for the workbench/buffet table
10. Rough turned 4 oak bowls from a piece of tree blown down in a storm
11. Sent some e-mails out that I had let sit too long
12. Coated the bowls in wax and will let them cure for a year.
13. Cleaned and organized GROP – oak shavings were EVERY where
14. Composted the shavings with some grass and kitchen scraps
15. Sharpened all my lathe chisels
16. Brained myself on a low hanging bike – said f-word more than once
17. Went to a run along the river
18. Called my Mom and talked for a bit
19. Checked on the kids
20. Cut first 5” top sections for Cornebarrieu Workbench
21. Need a proper circle saw… the 18v battery saw is out of it league on 1.5” beech
22. Worked on the small cabinet rosettes for our neighbor – he also asked me to install a shelf while I was at it…
23. Played with the puppies – while Stamps-With-Foot had a girls night
24. Got sucked into Pinterest
25. Updated website a little (here and Tumblr)
26. Watched a little too much TV/YouTube
27. Took puppies for a walk around neighborhood a couple of times
28. Rode my bike about 10 miles – muddy
29. Cleaned and tuned single-speed bike
30. Played with puppies
31. Did some grilling with beer in hand 
32. Got up Sunday morning and worked for a few hours, – because I thought it was Monday. Damn it!
33. Closed office door and did not return for 24 hours
34. Told wife her hair was very pretty
35. Went for a walk with wife and puppies
36. Made a small parts organizer out of a broken wood bowl
37. Got glue on my favorite shorts
38. Wrote some snail-mail
39. Surfed the interwebs until I fell asleep with the iPad on my chest…
40. I did not mow the yard again. The gods of lawn maintenance are displeased with me.

Hiking august 2014 (3)

Hiking august 2014 (1)

Hiking august 2014 (5)

Hiking august 2014 (2)

Hiking august 2014 (4)

Rosettes for neighbor

Oak Bowls Aug 2014 (5)

Oak Bowls Aug 2014 (7)

Lathe clean aug 2014

Oak Bowls Aug 2014 (1)

IMG_3121

IMG_3122

Last page of notebook Aug 2014

yard not mowed this weekend 2014

T-beams for bench-buffet table aug 2014

found trivet 2014

making shavings aug 2014

Cornebarrieu Bench – Redesign & first cuts made

I did a full redesign of the Cornebarrieu bench… As per my normal modus operandi, I was over designing/building it. With all the tweaks and gadgets and new parts, it was going to take me 6 months to build, some serious math to layout the interlocking joint angles and cost $1900 in material – I may have priced solid 4” thick seasoned Eastern European beech and walnut for the top and legs…
Anyway, I came to my senses and decided on using the pine I had already purchased for the legs and stretchers, lap joints with bolts instead of compound dovetails, a liberal amount of hide glue here and there, and a top made from re-purposed IKEA counter tops and will install a leg vice salvaged from a junk shop near Limoux, France instead of the $300 Benchcraft scissor vise that I was eyeballin’. The top will be solid all the way across instead of the split-top design.

The pine slabs have been drying in my GROP for 5 months and were ready to be cut down into their rough size. I had a little time this last weekend and spent 4 hours making all the leg and stretcher joint cuts – hogging out the material with successive circle-saw cuts and then chiseling them out. I am waiting to cut the tenon that fits into the top on each leg until I have the top in-hand. I chiseled and planed all the joint cuts smooth and I really wished I would have had a timber framing slick. When I do another bench or some large furniture with this type of joint anytime again, I will pick one up as it will pay for itself with the labor saved, in comparison to a 1.5” bench chisel, on 4 lap joints. I did the rough math and I think that I will have made 1023 total handsaw and circle saw cuts by the time the bench is done. There will be 16 bolts, 6 sections of 7/16” all-thread, 12 large screws, one 2’ ACME thread rod, 2 large dowels, 4 lag screws, 32 nuts & washers, and some sweat, blood, and curse words that will all go into it by the end. The new dimensions of the bench will be 25.5” wide, 34” tall, and 8.2 feet long. I believe the finished weight will be around 320 pounds.

My next milestone is the dreaded IKEA run. It will be a couple of weeks before I have the enough spending money horded together from my allowance (I want to be debt free in two years and retire at 55 so yes, I have an allowance…) and get the top cut out and fitted. I will update as I go.

Cornebarrieu Bench update (2)

Cornebarrieu Bench update (1)

bench drawings 2014 (3)

bench drawings 2014 top detail

A Fine French Work Bench

My GROP (garage and shop combo) in Seattle was too small for a proper joiner’s bench. I made due with a slim, high, wall-mounted work counter, a bolted on machinist-vise, Quick Clamps, and the top of my table saw. It worked – mostly – but was a pain in the ass a good bit of the time: I never once planed a board on a stable, solid surface. My GROP here in France is roughly the same size as the one in Seattle, but is absent the huge cast iron machines and saws. I have some room to move and finally have the space for a big, heavy, proper work bench. This shit is about to get real…

As I live in France, I am building a 2m long, 85cm wide split top Roubo-style bohemyth, that will have a 12cm, 4-part slab top (6.5′ X 33.46″ X 4.72″) and it will be 36″ high as that is MY optimal bench height. Wooden leg vise, dog holes, a cast iron tail vise – all the bells and whistles! I am planning for it to take a mule to move this thing as I will do some serious planing on this baby. It is an amalgamation of benches by M. Roubo, Roy Underhill, Chris Schwartz, and Bill Schenher. I am calling it the “Cornebarrieu Bench” after the small village in southern France where we live, where the lumber has been sourced, and where the bench will be made and first used.

I picked up some of the lumber at a yard near the house (still need the top – thinking of Beech!), strapped it to the top of my tiny car and carried it home, giggling manically. The wood is now in the GROP drying out a little and waiting for me to attack the timber and fashion it into one fine, sweet hunk of usefulness. It makes my black heart more than a little happy to think about the look on movers’ faces when they see this thing when they come to pack us out for our eventual move back to Seattle. Mwahahaha…