Film Friday – Double Feature: Attic and Bath Remodel Status

I spent two FULL days, with a little help from my wife, instaling the baseboard, door, skylight, stair, and window trim in the new attic space. This video includes a few tips and tricks along the way. As this will be my wife’s studio space, she put in some sweat equity filling nail holes, doing a little sanding, and she chose the paint scheme. I will be painting next and will document that whole process as well.

This is Part 1 of our basement bathroom build/finish. We decided to add a basement bathroom when we replumbed the house a couple of years ago. 6 months of chaos insued and we took a two year break before diving back into the bathroom build. This time has been SO much better. We went with white subway tile for the walls, black and while hex tiles for the floor, and charcoal grout. The next step is trim, paint and fixture install.

Film Friday – Attic Remodel: Week 7

This is the last of the weekly updates for the Attic Remodel Project. The heavy work and drywall is complete and I will start trimming and painting the space this week (nights and weekends as I have a real J-O-B) so that my wife will have a studio that is full of light and opportunity. The next and final installment of the attic build will show all the paint and trim steps, some tips & tricks, and will be a few weeks away.

Film Friday – Attic Week 5

We made huge progress in week five of the attic remodel, even with a couple of setbacks. The windows still are not in, but that is due 100% to the weather. I had an angry cold/flu and my thoughts about getting a little further along that weekend turned into hopeful, but unfulfilled fiction.

Film Friday – Framing Double Feature

We are remodeling and rebuilding a 90+ year old attic into a master bedroom. This required completely rewiring to electrical in the attic, moving/fixing plumbing, building a complete floating floor, adding roof supports, etc… Below is thew documentation of the 1st week of the build.

Part I of a 2 part video on the replacement of a falling down 90+ year old shack of a carriage shed with a modern 24X24 garage. This was not a flat mono-slab, green field build. Lots of digging was required and a rebar-filled retaining wall and slab had to be poured in the middle of winter before the first wall could go up.