Lectern rebuild and re-thinking the plan

Early last year, I picked up an antique copyist’s lectern (the top part only) that originated in a French Abby.  The lectern was riddled with worm holes, a couple pieces were missing, and there was some damage to repair, but the first thing was to make it bug free so not to infect all our other furniture with wood worm.  The thing spent a couple of months in a plastic bag full of insecticide and chemicals that makes for square babies. According to the interwebs two months bathing in said concoction would make the piece safe to bring out see the light of day again, so after fumigation, it sat in our living-room as decoration for 12 months before I started the rebuild in earnest.

Initially, I sketched up a few column profiles in my ubiquitous little black notebook and settled on a somewhat simple design that matched the overall style and period of the piece.  Next, I spent a little time one Sunday turning a new pedestal out of beech scraps from my workbench build. I glued them all up into a single 5″ X 5″ x 32″ hunk of wood. I then measured and turned matching intermediate supports from a scrap oak rolling pin with curves to match the column.   A couple of weeks later, I used the last of the beech scrap and turned the pedestal base, which ended up 16″ in diameter and 3″ tall.

After gluing it all together, applying matching stain, and putting 4 coats of polyurethane on the base, it was time to start on the lectern top.  All was going to plan right up to the moment that I removed a damaged shelf and saw what looked to be fresh wood damage… In one of the joints there was a small white bug larvae…  Son of a bitch…  I immediately put plastic on my bench top and took apart another joint.  I found more LIVING wood worm. I started picking at the capped holes here and there and more worm…  Shit!!!  I wrapped it up in a trash bag and out to the street it went.  It would seem that my lethal chemical treatment wasn’t that lethal.  Just REALLY, REALLY happy that the hatch hadn’t started and that my house was no full of bugs that would lay word worm eggs all over our other furniture. I took pictures and measurements and I am now planning on building a copy of the top over the next month or so and I will post the finished product here when I am done and it is installed in the living room.

Matt Talley - Projects 2015_06

Matt Talley - Projects 2015_07

Matt Talley - Projects 2015_16

Matt Talley - Projects 2015_15

Matt Talley - Projects 2015_12

Matt Talley - Projects 2015_11

Matt Talley - Projects 2015_10

Matt Talley - Projects 2015_09

Matt Talley - Projects 2015_08

Matt Talley - Projects 2015_05

Some small projects around the house

I have been swamped with work and travel for the last couple of months, so my shop time has been very limited. I have mostly been puttering around with my workbench, getting the last bits and bobbles done before calling it done and I have spent the off hour here and there on the lathe and doing stuff around the house:

  1. I had to fix a dishwasher leak and do some painting in the kitchen – still hate plumbing
  2. We did some re-arranging, so I had to fill some nail holes and then make new ones.
  3. Glued a cutting board back together after it split – craptastic glue didn’t hold, so it is back in the to-fix pile and will get some dowels this time
  4. Made a pot lid handle out of some scrap cherry.
  5. Tackled the jungle that was once my yard – twice
  6. Sharpened the lawnmower blade
  7. Turned the compost
  8. I bought a sheet of plywood and built a DVD shelf and a 8′ bookshelf for the lending library we run.
  9. There was been an oak log in my shop for months so I cut it in half and made a couple of stools for my office.
  10. Our puppies play a game called “run away from Mommy” when she takes them out, so I built two small fences to keep them in the back yard and away from the front gate.

I have do a few things in the shop just for organization and am working on a couple of little projects:

  1. We got a huge free wardrobe that I put in the GROP to organize non-tool/shop related items like climbing gear and life jackets
  2. My battery operated tools need a home, so I put together an organization center for them that mounts on the French cleat board
  3. I hung up my 6 heavy panel clamps to get them out of the way
  4. Made a Lathe chuck and tail-stock tool organizer for the French cleat organizer
  5. With a bonus from my J-O-B, I bought a few more molding planes, but they arrived in sad shape. I spent 6+ hours one Saturday cleaning, sharpening and fixing them.
  6. Started work on a blanket chest rebuild: cut here, snip there, new runners and new feet. Will get new milk paint finish when complete.
  7. Working on a copyist lectern rebuild. I made the base, pillar and other bits from some scrap beech left over from the bench build.
  8. Built a wooded top for the puppy Kennel so it blends better with the furniture in the Living Room.
  9. Putting together a 6-board chest for molding plane storage.  Will get re-purposed forged hardware and a Barn Red milk paint finish.

Matt Talley - Projects 2015_06 Matt Talley - Projects 2015_11 IMG_3410 Oak stool 23-2015 (2) Matt Talley - Projects 2015_24 Matt Talley - Projects 2015_22 Matt Talley - Projects 2015_23 Matt Talley - Projects 2015_25 Matt Talley - Projects 2015_17 Matt Talley - Projects 2015_18 Matt Talley _ Drill Organizer _ 2015