F-Bomb Garage Build Status – Late June

Well, we are a month+ behind schedule, but the our garage is coming along:

The roof trusses are up and on: Flat trusses on one side and scissors on the other side to accommodate the 2-post car lift. My contractor is not adding the fire block (insert grumpy face).  These both limit the upward spread of a possible fire and add structural rigidity to the wall.  Building code in our area is 10′ of wall height before block is “required” and my walls are 10’… I don’t care to build to the minimum of code, I want it done the right way and fire blocks, regardless of wall height, are the right way, so I cut them all to size myself and have employed child labor (The Ruminator) to install the blocks with a driver and some 3” framing screws. I then snapped a line at 5′ on the outside wall and gave him a hammer and a big box of 8d coated nails so he could attach the sheets to the blocks. Not too many shiners – he did a fine job.

The Tyvek vapor barrier wrap is just installed over the front wall so that the garage doors could be hung. Both are 8’X9′ R12 insulated fiberglass doors with no windows and follow the two different ceiling lines on the inside. I put jack-screw openers to the side of the doors so that the space over the doors would be clear. In the pictures below you can see the tiny attic as well – a pull down ladder goes in next week. Overkill, but I put ¾” T&G up there as floor decking and glued/screwed it in place – just ‘cause…

There is Carlisle WIP300 self-sealing roofing underlayment/membrane installed. #30 roof felt is $25 a roll and WIP is $90, but I only needed 5 rolls (4.2 actually). That $325 difference is serious insurance as the WIP can sit out without shingles on it, in case of wind damage an such, and not leak for 6 months. The roof (as well as wall) decking is all CDX (I HATE OSB) and for the small quantity bought for my garage, it is $4 a sheet in difference. $200ish total for sheathing and decking – well worth the price for peace of mind.  Roofing is 30 year algae-resistant (important in Seattle) 3 tab architectural shingles that are color matched to our house.

The rest of the wrap, windows, the man-door, and  6″ reveal Hardi lap siding goes on next week.

Matt Talley_F-Bomb_Garage_Framing_08

Matt Talley_F-Bomb_Garage_Framing_19

Matt Talley_F-Bomb_Garage_Framing_18

Matt Talley_F-Bomb_Garage_Framing_17

Matt Talley_F-Bomb_Garage_Framing_16

Matt Talley_F-Bomb_Garage_Framing_15

Matt Talley_F-Bomb_Garage_Framing_14

Matt Talley_F-Bomb_Garage_Framing_13

Matt Talley_F-Bomb_Garage_Framing_12

Matt Talley_F-Bomb_Garage_Framing_11

Matt Talley_F-Bomb_Garage_Framing_10

Matt Talley_F-Bomb_Garage_Framing_09

Matt Talley_F-Bomb_Garage_Framing_07

Matt Talley_F-Bomb_Garage_Framing_02

Matt Talley_F-Bomb_Garage_Framing_06

Matt Talley_F-Bomb_Garage_Framing_05

Matt Talley_F-Bomb_Garage_Framing_04

Garage and House Build/Remodel Update – 6/14/16

Garage:

  1. My slab is cured and the densifyer has been applied.  really happy with the results – a big thank you to Mr. Mark Flood!!
  2. The ground around my garage slab is all level.  I rented a Skid-Steer this past weekend and played in the dirt.  Hauled 2 yards of excess over to the neighbors yard to fill some voids and I used the skid-steer to pull out 7 small stumps for her.
  3. Got a call from the builder yesterday and the lumber will be onsite today, Framing starts Wednesday, and trusses are delivered on Friday.
  4. Was asked to move the Honey-bucket so that the lumber would have enough room.  Odd, request for my builder to make of the homeowner/customer, but I did it just so there would be no issues with the lumber delivery.
  5. If schedule holds, windows and siding start next Wednesday, and we will be fully in the dry by next Friday.
  6. It looks like I will be installing the windows as I am more particular than the builder about such things.
  7. My son, The Ruminator, will be here for a few weeks and I will get him help me run wire in the garage shell.
  8. My 2-post car lift will be installed by the end of the month

Matt Talley_Garagfe Slab prep_02

Matt Talley_Garagfe Slab prep_03

Matt Talley_Garagfe Slab prep_07

 

 

 

 

House:

  1. We are finishing up the paint on the main level.
  2. I need to start putting the 1/4 round trim back down.
  3. Bathroom: there is tile work to finish and a mirror to be hung.
  4. Basement remodel is stalled.  We had the head manager for the plumbing company out on Saturday after we found even more problems with the work that was done and we have told them: “…in light of the previous and continuing issues, incomplete work, existing damage caused by your subcontractors that we will have to have repaired, and that the basement portion of our remodel has been brought a complete stop,  my wife and I do not want a____________ employee, or anyone from a subsidiary company back in our home.  We do not wish to continue dealing with _______.”  We can’t really touch anything until they agree to this.  If they do not, then we can’t do anything as the matter will have to be settled via remediation.

Kitchen Cabinet Work Update

There was a flurry of activity to get our kitchen done before our move to France.  I got it 99% of the way – with serious help from Mr. Flood and my sweet wife.  It just needs a little paint on the overhead fridge pullouts, slight pull-out slide adjustment and the installation of the custom milled and matched cove molding.  That will all keep until we get back to Seattle though.  My mom will be able to cook in there just fine as-is.

I feel that the upper cookbook shelf ties the old and new sides together and adds that part of the overall kitchen that was missing.  The shelf also seems to lighten up the space a little as well.  The wine rack was put in specifically for my wife.  It started as a discussion in the breakfast nook one mid-morning, transitioned to a napkin sketch, and four hours later, the carcass was built, bottom brackets cut, and block top was in the clamps with the glue drying.  After the paint was on and top installed, my wife swooned.  It made me smile from ear to ear!

The paper towel holder was a bit of a conundrum.  With low upper cabinets, there was just no good spot either on the counter or under the cabinet.  I toyed around with a couple of ideas before I decided to mount the paper towels on the old ironing board (now spice cabinet) lower door.  I used some scrap popular and turned a section of oak down on the lathe for the rod.  It is inserted all the way through the shelf and both wedged and glued in place.  My grand kids will still be able to use that towel holder when they are my age.  yes, I over built something again…  On the brighter side, the paper town holder bracket, the small round shelf brackets, the cookbook shelf brackets, and the wine rack brackets all match, again marrying all the different kitchen elements together.

Almost as important to her as the wine rack was the trash and recycling can drawer.  After it was in and painted I caught her pulling it open and closing it over and over with a giggly smile.  The curves on the side match all the shelf brackets – I couldn’t help myself.

Getting ready for our move to France – first round

We/I have some serious work to do before we move to France for two years and we have a list of stuff that needs to happen. Here is the initial “to-do” post:

The Lawn:
The Nana is going to be moving into our house and will be puttering around the yard, planting flowers and the like, but there is no way that she will be pruning trees, cutting the lawn, weed eating, edging, or pulling pine needles out of the gutters. There is a little time, so we have contracted a crew to start taking are of the lawn now so that any kinks will be worked out.

In the spirit of full disclosure, the timing of this yard work transition was set into full motion only when my lawnmower blew up. Really, really – kaboom! As in there was a silver dollar-sized hole in the side of the piston housing and oil spewed everywhere. Right up until that moment the lawn caed transition was just a good idea. After it died, I threw it in the back of the truck, so it wouldn’t leak anymore oil on my grass and called the lawn service. There were a couple of things after their 1st visit, that I would like done differently, but on the whole, so far so good.

Projects:
The Kitchen HAS TO BE COMPLETED. I have stopped working on my Basement of Doom, the Campaign Camping Furniture, wood turning and a couple of refinish projects until the kitchen is complete. I will work down from there and not take on ANY new projects. I have two chests of drawers and a Duncan Phyfe Table that I want to complete and sell so that I am not storing them.

Shop:
I hate my table saw. I am going to out the beast on Craig’s List along with my contractor’s saw (Just collects spiders and sawdust), 12″ band-saw, small joiner, small drill press and the miter-box saw. None of them will work in France (50Hz vs. 60Hz power issues), so I can’t take’em with me. They are all old and have had a good life with me. It is time that I pass them on to new homes where they will see less use and live out their golden years making soapbox derby cars and bird feeders. I am planning to use any money made to invest in both some quality carving chisels and I will save part for the down payment on all new, cabinet shop-quality, power tools when we return to the US.

I can’t not build stuff, so I am taking the Anarchist’s Tool Chest route and am taking a rebuilt an old ammo/tool box (see evolution in pictures below) into a more useful tool travel case and will then show up in France with planes (22 of them), carving knives, mallets, hand saws, chisels, etc… The plan is to make smaller more detailed items, mostly by hand, while I am there (I will be sourcing a lathe and doing some bowl work though…).

20130718-102104.jpg

20130718-102216.jpg

20130718-102231.jpg

20130718-102246.jpg

20130718-102337.jpg